Search this site
Embedded Files
  • MarvinPro
  • PROCESS
    • EN | Here is How to Build
      • EN | Design
        • EN | 1.1 Principles
          • 1.1.1 Did you Know?
          • 1.1.2 See
          • 1.1.3 Design
          • 1.1.4 Sign
          • 1.1.5 Prepare
          • 1.1.6 Run
          • 1.1.7 Support
        • EN | 1.2 Rules
          • 1.2.1.A Rule
          • 1.2.2 What
          • 1.2.3 How
          • 1.2.4 When
          • 1.2.5 Why
          • 1.2.6 Who
          • 1.2.7 A Sound Rule
          • 1.2.8 The Whole
        • EN | 1.3 Exceptions
          • 1.3.1.An Exception
          • 1.3.2 The What-If
          • 1.3.3 Scope In or Park
          • 1.3.4 The Way Forward
          • 1.3.5 Pre-Approved
          • 1.3.6 Escalate
          • 1.3.7 Fold It Back
          • 1.3.8 As Few As Possible
        • EN | 1.4 System
          • 1.4.1 A System
          • 1.4.2 The Levels
          • 1.4.3 The Map
          • 1.4.4 Three Kinds
          • 1.4.5 Value
          • 1.4.6 Links
          • 1.4.7 Owners
          • 1.4.8 The System
        • EN | 1.5 Core
          • 1.5.1 A Core Process
          • 1.5.2 The Frame
          • 1.5.3 The Direction (L1)
          • 1.5.4 The Backbone (L1→L3)
          • 1.5.5 The Handoffs
          • 1.5.6 Sign-Off
          • 1.5.7 Inherited
          • 1.5.8 The Core
        • EN | 1.6 Sub
          • 1.6.1 A Sub-Process
          • 1.6.2 Sub or Step
          • 1.6.3 Cutting Clean
          • 1.6.4 Place
          • 1.6.5 Function
          • 1.6.6 The Seams Within
          • 1.6.7 Drift
          • 1.6.8 Sub-Processes
        • EN | 1.7 Procedure
          • 1.7.1 A Procedure
          • 1.7.2 The Trigger
      • EN | Operate
      • EN | Change
      • EN | Control
      • EN | Govern
      • EN | Diagnose
      • EN | Master
    • ES | Aquí es Cómo Construir
      • ES | Diseño
        • ES | 1.1 Principios
          • 1.1.1 ¿Sabías Que?
          • 1.1.2 Ver
          • 1.1.3 Diseñar
          • 1.1.4 Firmar
          • 1.1.5 Preparar
          • 1.1.6 Ejecutar
          • 1.1.7 Apoyar
        • ES | 1.2 Reglas
          • 1.2.1 Una Regla
          • 1.2.2 Qué
          • 1.2.3 Cómo
          • 1.2.4 Cuándo
          • 1.2.5 Por Qué
          • 1.2.6 Quién
          • 1.2.7 Una Regla Sólida
          • 1.2.8 El Todo
        • ES | 1.3 Excepciones
          • 1.3.1.Una Excepción
          • 1.3.2 El Qué Pasaría Si
          • 1.3.3 Incorporar o Aparcar
          • 1.3.4 El Camino a Seguir
          • 1.3.5 Preaprobado
          • 1.3.6 Escalar
          • 1.3.7 Reincorporar
          • 1.3.8 Tan Pocas Como Sea Posible
        • ES | 1.4 Sistema
          • 1.4.1 Un Sistema
          • 1.4.2 Los Niveles
          • 1.4.3 El Mapa
          • 1.4.4 Tres Tipos
          • 1.4.5 Valor
          • 1.4.6 Enlaces
          • 1.4.7 Propietarios
          • 1.4.8 El Sistema
        • ES | 1.5 Núcleo
          • 1.5.1 Un Proceso Central
          • 1.5.2 El Marco
          • 1.5.3 La Dirección (L1)
          • 1.5.4 La Columna Vertebral (L1→L3)
          • 1.5.5 Los Traspasos
          • 1.5.6 La Aprobación
          • 1.5.7 Heredado
          • 1.5.8 El Central
        • ES | 1.6 Sub
          • 1.6.1 Un Subproceso
          • 1.6.2 Sub o Paso
          • 1.6.3 Cortar Limpio
          • 1.6.4 Situar
          • 1.6.5 Función
          • 1.6.6 Las Costuras Internas
          • 1.6.7 Deriva
          • 1.6.8 Subprocesos
        • ES | 1.7 Procedimiento
          • 1.7.1 Un Procedimiento
          • 1.7.2 The Trigger
    • FR | Ici, c'est Comment Construire
      • FR | Conception
        • FR | 1.1 Principes
          • 1.1.1 Le saviez-vous ?
          • 1.1.2 Voir
          • 1.1.3 Concevoir
          • 1.1.4 Signer
          • 1.1.5 Préparer
          • 1.1.6 Exécuter
          • 1.1.7 Soutenir
        • FR | 1.2 Règles
          • 1.2.1 Une Règle
          • 1.2.2 Quoi
          • 1.2.3 Comment
          • 1.2.4 Quand
          • 1.2.5 Pourquoi
          • 1.2.6 Qui
          • 1.2.7 Une Règle Solide
          • 1.2.8 Le Tout
        • FR | 1.3 Exceptions
          • 1.3.1.Une Exception
          • 1.3.2 Le Et Si
          • 1.3.3 Intégrer ou Mettre de Côté
          • 1.3.4 Le Chemin à Suivre
          • 1.3.5 Préapprouvé
          • 1.3.6 Escalader
          • 1.3.7 Replier
          • 1.3.8 Aussi Peu Que Possible
        • FR | 1.4 Système
          • 1.4.1 Un Système
          • 1.4.2 Les Niveaux
          • 1.4.3 La Cartographie
          • 1.4.4 Trois Types
          • 1.4.5 Valeur
          • 1.4.6 Liens
          • 1.4.7 Propriétaires
          • 1.4.8 Le Système
        • FR | 1.5 Noyau
          • 1.5.1 Un Processus Central
          • 1.5.2 Le Cadre
          • 1.5.3 La Direction (L1)
          • 1.5.4 La Colonne Vertébrale (L1→L3)
          • 1.5.5 Les Passations
          • 1.5.6 La Validation
          • 1.5.7 Hérité
          • 1.5.8 Le Central
        • FR | 1.6 Sous
          • 1.6.1 Un Sous-Processus
          • 1.6.2 Sous ou Étape
          • 1.6.3 Découper Proprement
          • 1.6.4 Situer
          • 1.6.5 Fonction
          • 1.6.6 Les Coutures Internes
          • 1.6.7 Dérive
          • 1.6.8 Sous-Processus
        • FR | 1.7 Procédure
          • 1.7.1 Une Procédure
          • 1.7.2 Le Déclencheur
    • PT | Aqui é Como Construir
      • PT | Design
        • PT | 1.1 Princípios
          • 1.1.1 Sabias?
          • 1.1.2 Ver (PT)
          • 1.1.3 Design (PT)
          • 1.1.4 Assinar
          • 1.1.5 Preparar (PT)
          • 1.1.6 Executar
          • 1.1.7 Apoiar
        • PT | 1.2 Regras
          • 1.2.1 Uma Regra
          • 1.2.2 O quê
          • 1.2.3 Como
          • 1.2.4 Quando
          • 1.2.5 Por Que
          • 1.2.6 Quem
          • 1.2.7 Uma Regra Sólida
          • 1.2.8 O Todo
        • PT | 1.3 Exceções
          • 1.3.1.Uma Exceção
          • 1.3.2 O E Se
          • 1.3.3 Incorporar ou Pôr de Lado
          • 1.3.4 O Caminho a Seguir
          • 1.3.5 Pré-Aprovado
          • 1.3.6 Escalonar
          • 1.3.7 Dobrar de Volta
          • 1.3.8 Tão Poucas Quanto Possível
        • PT | 1.4 Sistema
          • 1.4.1 Um Sistema
          • 1.4.2 Os Níveis
          • 1.4.3 O Mapa
          • 1.4.4 Três Tipos
          • 1.4.5 Valor PT
          • 1.4.6 Ligações
          • 1.4.7 Proprietários
          • 1.4.8 O Sistema
        • PT | 1.5 Núcleo
          • 1.5.1 Um Processo Central
          • 1.5.2 O Enquadramento
          • 1.5.3 A Direção (L1)
          • 1.5.4 A Coluna Vertebral (L1→L3)
          • 1.5.5 Transferências
          • 1.5.6 A Aprovação
          • 1.5.7 Herdado
          • 1.5.8 O Central
        • PT | 1.6 Sub
          • 1.6.1 Um Subprocesso
          • 1.6.2 Sub ou Passo
          • 1.6.3 Cortar Limpo
          • 1.6.4 Situar PT
          • 1.6.5 Função
          • 1.6.6 As Costuras Internas
          • 1.6.7 Deriva PT
          • 1.6.8 Subprocessos
        • PT | 1.7 Procedimento
          • 1.7.1 Um Procedimento PT
          • 1.7.2 O Gatilho
    • RU | Вот Как Строить
      • RU | Проектирование
        • RU | 1.1 Принципы
          • 1.1.1 А вы знали?
          • 1.1.2 Видеть
          • 1.1.3 Проектировать
          • 1.1.4 Подписывать
          • 1.1.5 Подготавливать
          • 1.1.6 Запускать
          • 1.1.7 Поддерживать
        • RU | 1.2 Правила
          • 1.2.1 Правило
          • 1.2.2 Что
          • 1.2.3 Как
          • 1.2.4 Когда
          • 1.2.5 Почему
          • 1.2.6 Кто
          • 1.2.7 Прочное Правило
          • 1.2.8 Целое
        • RU | 1.3 Исключения
          • 1.3.1.Исключение
          • 1.3.2 Что Если
          • 1.3.3 Включить или Отложить
          • 1.3.4 Путь Вперёд
          • 1.3.5 Предварительно Одобренное
          • 1.3.6 Эскалировать
          • 1.3.7 Свернуть Обратно
          • 1.3.8 Так Мало, Как Возможно
        • RU | 1.4 Система
          • 1.4.1 Система
          • 1.4.2 Уровни
          • 1.4.3 Карта
          • 1.4.4 Три Вида
          • 1.4.5 Ценность
          • 1.4.6 Связи
          • 1.4.7 Владельцы
          • 1.4.8 Вся Система
        • RU | 1.5 Ядро
          • 1.5.1 Основной Процесс
          • 1.5.2 Рамка
          • 1.5.3 Направление (L1)
          • 1.5.4 Хребет (L1→L3)
          • 1.5.5 Передачи
          • 1.5.6 Утверждение
          • 1.5.7 Унаследованное
          • 1.5.8 Основной
        • RU | 1.6 Суб
          • 1.6.1 Подпроцесс
          • 1.6.2 Суб или Шаг
          • 1.6.3 Резать Чисто
          • 1.6.4 Разместить
          • 1.6.5 Функция
          • 1.6.6 Внутренние Швы
          • 1.6.7 Дрейф
          • 1.6.8 Подпроцессы
        • RU | 1.7 Процедура
          • 1.7.1 Процедура
          • 1.7.2 Запуск
    • EN | Migration
      • CHAPTER 1. Why Processes Drive Transformation
      • CHAPTER 2. From Steps to System by MarvinPro
      • CHAPTER 3. Phases by MarvinPro
      • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
      • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
      • CHAPTER 6. What Makes Migration Successful by MarvinPro
    • EN | Migration S/4HANA Edition
      • 1. Why Processes Drive Transformation by MarvinPro
      • 2. Design Phase — Building for Scale by MarvinPro
      • 3. Core Functional Domains
      • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
      • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
      • 6. What Makes Migration Successful by MarvinPro
    • EN | Exceptions
      • 1. Why Exceptions Define by MarvinPro
      • 2. What Is an Exception
      • 3. Designing for Exceptions
      • 4. Operating Under Pressure
      • 5. Recovery and Stabilisation
      • 6. Learning from Exceptions
      • 7. The Exception-Ready Organisation
      • 8. The Future of Exception Handling by MarvinPro
    • PROCESSES COLLECTION
      • PROCESS Catalog
  • LEADERSHIP
    • EN | Here is How to Think
      • 1 The Individual
        • 1.1 Use Your Moral Compass
        • 1.2 Predict
        • 1.3 Own It
        • 1.4 Aim High
        • 1.5 Work Hard
        • 1.6 Pause and Continue
        • 1.7 Do More With Less
      • 2 The Leader
        • 2.1 Invest
        • 2.2 Earn It
        • 2.3 Be Clear
        • 2.4 Read the Room
        • 2.5 Task Force vs Owner
        • 2.6 Knowledge in the Room
        • 2.7 The Perfectionist
      • 3 The Owner
        • 3.1 Timing
        • 3.2 The Window
        • 3.3 Broaden your Responsibility
        • 3.4 Attrition
        • 3.5 The Long Game
        • 3.6 Pause
        • 3.7 Balance
        • 3.8 Diversity (Bonus)
      • 4 The Visionary
        • 4.1 Time moves fast
        • 4.2 The Idea Behind the Idea
        • 4.3 Automate
        • 4.4 Think Big
        • 4.5 Build to Last
        • 4.6 Earn and Compound
        • 4.7 Invest by Acquisition
        • 4.8 Pay it Forward
      • 0 The Candidate
        • 0.1 Decide
        • 0.2 Research
        • 0.3 Prepare
        • 0.4 Be Disciplined
        • 0.5 Apply
        • 0.6 Convince
        • 0.7 Pass
    • ES | Aquí es Cómo Pensar
      • 1 El Individuo
        • 1.1 Usa tu Brújula Moral
        • 1.2 Predice
        • 1.3 Hazlo Tuyo
        • 1.4 Apunta Alto
        • 1.5 Trabaja Duro
        • 1.6 Pausa y Continúa
        • 1.7 Hacer Más Con Menos
      • 2 El Líder
        • 2.1 Invierte
        • 2.2 Gánatelo
        • 2.3 Sé claro
        • 2.4 Lee la Sala
        • 2.5 Fuerza de Tarea vs Propietario
        • 2.6 El Conocimiento en la Sala
        • 2.7 El Perfeccionista
      • 3 El Propietario
        • 3.1 El Momento
        • 3.2 La Ventana
        • 3.3 Amplía tu Responsabilidad
        • 3.4 Deserción
        • 3.5 El Juego Largo
        • 3.6 Pausa
        • 3.7 Equilibrio
        • 3.8 Diversidad
      • 4 El Visionario
        • 4.1 El Tiempo Avanza Rápido
        • 4.2 La Idea Detrás de la Idea
        • 4.3 Automatiza
        • 4.4 Piensa en Grande
        • 4.5 Construye para Durar
        • 4.6 Gana y Multiplica
        • 4.7 Invierte por Adquisición
        • 4.8 Devuelve el Favor
      • 0 El Candidato
        • 0.1 Decidir
        • 0.2 Investigar
        • 0.3 Preparar
        • 0.4 Sé Disciplinado
        • 0.5 Aplica
        • 0.6 Convence
        • 0.7 Supera
    • FR | Voici Comment Penser
      • 1 L’Individu
        • 1.1 Utilise ta Boussole Morale
        • 1.2 Prédire
        • 1.3 Prends-en la Responsabilité
        • 1.4 Vise Haut
        • 1.5 Travaille Dur
        • 1.6 Pause et Continue
        • 1.7 Faire Plus Avec Moins
      • 2 Le Leader
        • 2.1 Investis
        • 2.2 Mérite-le
        • 2.3 Sois Clair
        • 2.4 Lis la Salle
        • 2.5 Force de Travail vs Propriétaire
        • 2.6 La Connaissance dans la Salle
        • 2.7 Le Perfectionniste
      • 3 Le Propriétaire
        • 3.1 Le Moment
        • 3.2 La Fenêtre
        • 3.3 Élargis ta Responsabilité
        • 3.4 Attrition (FR)
        • 3.5 Le Jeu Long
        • 3.6 Pause (FR)
        • 3.7 Équilibre
        • 3.8 Diversité
      • 4 Le Visionnaire
        • 4.1 Le Temps Avance Vite
        • 4.2 L'Idée Derrière l'Idée
        • 4.3 Automatise
        • 4.4 Pense Grand
        • 4.5 Construire pour Durer
        • 4.6 Gagne et Compose
        • 4.7 Investis par Acquisition
        • 4.8 Rends la Pareille
      • 0 Le Candidat
        • 0.1 Décider
        • 0.2 Rechercher
        • 0.3 Préparer
        • 0.4 Soyez Discipliné
        • 0.5 Postulez
        • 0.6 Convainquez
        • 0.7 Passez
    • PT | Aqui é Como Pensar
      • 1 O Indivíduo
        • 1.1 Usa a Tua Bússola Moral
        • 1.2 Prevê
        • 1.3 Torna-o Teu
        • 1.4 Aponta Alto
        • 1.5 Trabalha Arduamente
        • 1.6 Pausa e Continua
        • 1.7 Faz Mais Com Menos
      • 2 O Líder
        • 2.1 Investe
        • 2.2 Mereça-o
        • 2.3 Sê Claro
        • 2.4 Lê a Sala
        • 2.5 Força-Tarefa vs Proprietário
        • 2.6 O Conhecimento na Sala
        • 2.7 O Perfeccionista
      • 3 O Proprietário
        • 3.1 O Momento
        • 3.2 A Janela
        • 3.3 Alarga a tua Responsabilidade
        • 3.4 Atrito
        • 3.5 O Jogo Longo
        • 3.6 Pausa (PT)
        • 3.7 Equilíbrio (PT)
        • 3.8 Diversidade
      • 4 O Visionário
        • 4.1 O Tempo Avança Rápido
        • 4.2 A Ideia por Trás da Ideia
        • 4.3 Automatiza (PT)
        • 4.4 Pensa Grande
        • 4.5 Construir para Durar
        • 4.6 Ganha e Multiplica
        • 4.7 Investe por Aquisição
        • 4.8 Retribui
      • 0 O Candidato
        • 0.1 Decidir (PT)
        • 0.2 Pesquisar
        • 0.3 Preparar (PT)
        • 0.4 Sê Disciplinado
        • 0.5 Candidate-se
        • 0.6 Convença
        • 0.7 Passa
    • RU | Вот как думать
      • 1 Индивидуум
        • 1.1 Используй свой Моральный Компас
        • 1.2 Предсказывай
        • 1.3 Возьми на Себя
        • 1.4 Целься Выше
        • 1.5 Работай Усердно
        • 1.6 Пауза и Продолжение
        • 1.7 Делай Больше С Меньшим
      • 2 Лидер
        • 2.1 Инвестируй
        • 2.2 Заслужи это
        • 2.3 Будь Ясным
        • 2.4 Читай Зал
        • 2.5 Рабочая Группа vs Владелец
        • 2.6 Знание в Зале
        • 2.7 Перфекционист
      • 3 Владелец
        • 3.1 Момент
        • 3.2 Окно
        • 3.3 Расширь свою Ответственность
        • 3.4 Текучесть Kадров
        • 3.5 Долгая Игра
        • 3.6 Пауза
        • 3.7 Баланс
        • 3.8 Разнообразие
      • 4 Визионер
        • 4.1 Время Движется Быстро
        • 4.2 Идея за Идеей
        • 4.3 Автоматизируй
        • 4.4 Думай Масштабно
        • 4.5 Строй на Долгое Время
        • 4.6 Зарабатывай и Умножай
        • 4.7 Инвестируй через Приобретение
        • 4.8 Передай Дальше
      • 0 Кандидат
        • 0.1 Решить
        • 0.2 Исследовать
        • 0.3 Подготовиться
        • 0.4 Будь Дисциплинированным
        • 0.5 Откликайтесь
        • 0.6 Убеждайте
        • 0.7 Пройдите
  • STORIES
    • EN | The CEO
      • CHAPTER 0. Prologue
      • CHAPTER 1. Day One
      • CHAPTER 2. The Room
      • CHAPTER 3. The Pressure
      • CHAPTER 4. The Presentation
      • CHAPTER 5. The Contract
      • CHAPTER 6. The Transfer
      • CHAPTER 7. The Script
      • CHAPTER 8. The Distance
      • CHAPTER 9. The Customer Who Knows More
      • CHAPTER 10. The Knowledge That Left
      • CHAPTER 11. The Culture Nobody Transferred
      • CHAPTER 12. The Friend
      • CHAPTER 13. The Invisible Wall
      • CHAPTER 14. The Manager Who Performs Upward
      • Coming Soon
    • ES | El CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. El Primer Día
      • CAPÍTULO 2. La Sala
      • CAPÍTULO 3. La Presión
      • CAPÍTULO 4. La Presentación
      • CAPÍTULO 5. El Contrato
      • CAPÍTULO 6. La Transferencia
      • CAPÍTULO 7. El Guión
      • CAPÍTULO 8. La Distancia
      • CAPÍTULO 9. La Clienta Que Sabe Más
      • CAPÍTULO 10. El Conocimiento Que Se Fue
      • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
      • Próximamente
    • FR | Le CEO
      • CHAPITRE 0. Prologue
      • CHAPITRE 1. Jour Un
      • CHAPITRE 2. La Salle
      • CHAPITRE 3. La Pression
      • CHAPITRE 4. La Présentation
      • CHAPITRE 5. Le Contrat
      • CHAPITRE 6. Le Transfert
      • CHAPITRE 7. Le Script
      • CHAPITRE 8. La Distance
      • CHAPITRE 9. La Cliente Qui En Sait Plus
      • CHAPITRE 10. Le Savoir Qui Est Parti
      • CHAPITRE 11. La Culture Que Personne N'a Transférée
      • Bientôt Disponible
    • PT | O CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. Dia Um
      • CAPÍTULO 2. A Sala
      • CAPÍTULO 3. A Pressão
      • CAPÍTULO 4. A Apresentação
      • CAPÍTULO 5. O Contrato
      • CAPÍTULO 6. A Transferência
      • CAPÍTULO 7. O Guião
      • CAPÍTULO 8. A Distância
      • CAPÍTULO 9. A Cliente Que Sabe Mais
      • CAPÍTULO 10. O Conhecimento Que Partiu
      • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
      • Em Breve
    • RU | ГД
      • ГЛАВА 0. ПРОЛОГ
      • ГЛАВА 1. День первый
      • ГЛАВА 2. Комната
      • ГЛАВА 3. Давление
      • ГЛАВА 4. Презентация
      • ГЛАВА 5. Контракт
      • ГЛАВА 6. Перевод
      • ГЛАВА 7. Сценарий
      • ГЛАВА 8. Дистанция
      • ГЛАВА 9. Клиент, который знает больше
      • ГЛАВА 10. Знание, которое ушло
      • ГЛАВА 11. Культура, которую никто не передал
      • Скоро будет доступно
 
  • MarvinPro
  • PROCESS
    • EN | Here is How to Build
      • EN | Design
        • EN | 1.1 Principles
          • 1.1.1 Did you Know?
          • 1.1.2 See
          • 1.1.3 Design
          • 1.1.4 Sign
          • 1.1.5 Prepare
          • 1.1.6 Run
          • 1.1.7 Support
        • EN | 1.2 Rules
          • 1.2.1.A Rule
          • 1.2.2 What
          • 1.2.3 How
          • 1.2.4 When
          • 1.2.5 Why
          • 1.2.6 Who
          • 1.2.7 A Sound Rule
          • 1.2.8 The Whole
        • EN | 1.3 Exceptions
          • 1.3.1.An Exception
          • 1.3.2 The What-If
          • 1.3.3 Scope In or Park
          • 1.3.4 The Way Forward
          • 1.3.5 Pre-Approved
          • 1.3.6 Escalate
          • 1.3.7 Fold It Back
          • 1.3.8 As Few As Possible
        • EN | 1.4 System
          • 1.4.1 A System
          • 1.4.2 The Levels
          • 1.4.3 The Map
          • 1.4.4 Three Kinds
          • 1.4.5 Value
          • 1.4.6 Links
          • 1.4.7 Owners
          • 1.4.8 The System
        • EN | 1.5 Core
          • 1.5.1 A Core Process
          • 1.5.2 The Frame
          • 1.5.3 The Direction (L1)
          • 1.5.4 The Backbone (L1→L3)
          • 1.5.5 The Handoffs
          • 1.5.6 Sign-Off
          • 1.5.7 Inherited
          • 1.5.8 The Core
        • EN | 1.6 Sub
          • 1.6.1 A Sub-Process
          • 1.6.2 Sub or Step
          • 1.6.3 Cutting Clean
          • 1.6.4 Place
          • 1.6.5 Function
          • 1.6.6 The Seams Within
          • 1.6.7 Drift
          • 1.6.8 Sub-Processes
        • EN | 1.7 Procedure
          • 1.7.1 A Procedure
          • 1.7.2 The Trigger
      • EN | Operate
      • EN | Change
      • EN | Control
      • EN | Govern
      • EN | Diagnose
      • EN | Master
    • ES | Aquí es Cómo Construir
      • ES | Diseño
        • ES | 1.1 Principios
          • 1.1.1 ¿Sabías Que?
          • 1.1.2 Ver
          • 1.1.3 Diseñar
          • 1.1.4 Firmar
          • 1.1.5 Preparar
          • 1.1.6 Ejecutar
          • 1.1.7 Apoyar
        • ES | 1.2 Reglas
          • 1.2.1 Una Regla
          • 1.2.2 Qué
          • 1.2.3 Cómo
          • 1.2.4 Cuándo
          • 1.2.5 Por Qué
          • 1.2.6 Quién
          • 1.2.7 Una Regla Sólida
          • 1.2.8 El Todo
        • ES | 1.3 Excepciones
          • 1.3.1.Una Excepción
          • 1.3.2 El Qué Pasaría Si
          • 1.3.3 Incorporar o Aparcar
          • 1.3.4 El Camino a Seguir
          • 1.3.5 Preaprobado
          • 1.3.6 Escalar
          • 1.3.7 Reincorporar
          • 1.3.8 Tan Pocas Como Sea Posible
        • ES | 1.4 Sistema
          • 1.4.1 Un Sistema
          • 1.4.2 Los Niveles
          • 1.4.3 El Mapa
          • 1.4.4 Tres Tipos
          • 1.4.5 Valor
          • 1.4.6 Enlaces
          • 1.4.7 Propietarios
          • 1.4.8 El Sistema
        • ES | 1.5 Núcleo
          • 1.5.1 Un Proceso Central
          • 1.5.2 El Marco
          • 1.5.3 La Dirección (L1)
          • 1.5.4 La Columna Vertebral (L1→L3)
          • 1.5.5 Los Traspasos
          • 1.5.6 La Aprobación
          • 1.5.7 Heredado
          • 1.5.8 El Central
        • ES | 1.6 Sub
          • 1.6.1 Un Subproceso
          • 1.6.2 Sub o Paso
          • 1.6.3 Cortar Limpio
          • 1.6.4 Situar
          • 1.6.5 Función
          • 1.6.6 Las Costuras Internas
          • 1.6.7 Deriva
          • 1.6.8 Subprocesos
        • ES | 1.7 Procedimiento
          • 1.7.1 Un Procedimiento
          • 1.7.2 The Trigger
    • FR | Ici, c'est Comment Construire
      • FR | Conception
        • FR | 1.1 Principes
          • 1.1.1 Le saviez-vous ?
          • 1.1.2 Voir
          • 1.1.3 Concevoir
          • 1.1.4 Signer
          • 1.1.5 Préparer
          • 1.1.6 Exécuter
          • 1.1.7 Soutenir
        • FR | 1.2 Règles
          • 1.2.1 Une Règle
          • 1.2.2 Quoi
          • 1.2.3 Comment
          • 1.2.4 Quand
          • 1.2.5 Pourquoi
          • 1.2.6 Qui
          • 1.2.7 Une Règle Solide
          • 1.2.8 Le Tout
        • FR | 1.3 Exceptions
          • 1.3.1.Une Exception
          • 1.3.2 Le Et Si
          • 1.3.3 Intégrer ou Mettre de Côté
          • 1.3.4 Le Chemin à Suivre
          • 1.3.5 Préapprouvé
          • 1.3.6 Escalader
          • 1.3.7 Replier
          • 1.3.8 Aussi Peu Que Possible
        • FR | 1.4 Système
          • 1.4.1 Un Système
          • 1.4.2 Les Niveaux
          • 1.4.3 La Cartographie
          • 1.4.4 Trois Types
          • 1.4.5 Valeur
          • 1.4.6 Liens
          • 1.4.7 Propriétaires
          • 1.4.8 Le Système
        • FR | 1.5 Noyau
          • 1.5.1 Un Processus Central
          • 1.5.2 Le Cadre
          • 1.5.3 La Direction (L1)
          • 1.5.4 La Colonne Vertébrale (L1→L3)
          • 1.5.5 Les Passations
          • 1.5.6 La Validation
          • 1.5.7 Hérité
          • 1.5.8 Le Central
        • FR | 1.6 Sous
          • 1.6.1 Un Sous-Processus
          • 1.6.2 Sous ou Étape
          • 1.6.3 Découper Proprement
          • 1.6.4 Situer
          • 1.6.5 Fonction
          • 1.6.6 Les Coutures Internes
          • 1.6.7 Dérive
          • 1.6.8 Sous-Processus
        • FR | 1.7 Procédure
          • 1.7.1 Une Procédure
          • 1.7.2 Le Déclencheur
    • PT | Aqui é Como Construir
      • PT | Design
        • PT | 1.1 Princípios
          • 1.1.1 Sabias?
          • 1.1.2 Ver (PT)
          • 1.1.3 Design (PT)
          • 1.1.4 Assinar
          • 1.1.5 Preparar (PT)
          • 1.1.6 Executar
          • 1.1.7 Apoiar
        • PT | 1.2 Regras
          • 1.2.1 Uma Regra
          • 1.2.2 O quê
          • 1.2.3 Como
          • 1.2.4 Quando
          • 1.2.5 Por Que
          • 1.2.6 Quem
          • 1.2.7 Uma Regra Sólida
          • 1.2.8 O Todo
        • PT | 1.3 Exceções
          • 1.3.1.Uma Exceção
          • 1.3.2 O E Se
          • 1.3.3 Incorporar ou Pôr de Lado
          • 1.3.4 O Caminho a Seguir
          • 1.3.5 Pré-Aprovado
          • 1.3.6 Escalonar
          • 1.3.7 Dobrar de Volta
          • 1.3.8 Tão Poucas Quanto Possível
        • PT | 1.4 Sistema
          • 1.4.1 Um Sistema
          • 1.4.2 Os Níveis
          • 1.4.3 O Mapa
          • 1.4.4 Três Tipos
          • 1.4.5 Valor PT
          • 1.4.6 Ligações
          • 1.4.7 Proprietários
          • 1.4.8 O Sistema
        • PT | 1.5 Núcleo
          • 1.5.1 Um Processo Central
          • 1.5.2 O Enquadramento
          • 1.5.3 A Direção (L1)
          • 1.5.4 A Coluna Vertebral (L1→L3)
          • 1.5.5 Transferências
          • 1.5.6 A Aprovação
          • 1.5.7 Herdado
          • 1.5.8 O Central
        • PT | 1.6 Sub
          • 1.6.1 Um Subprocesso
          • 1.6.2 Sub ou Passo
          • 1.6.3 Cortar Limpo
          • 1.6.4 Situar PT
          • 1.6.5 Função
          • 1.6.6 As Costuras Internas
          • 1.6.7 Deriva PT
          • 1.6.8 Subprocessos
        • PT | 1.7 Procedimento
          • 1.7.1 Um Procedimento PT
          • 1.7.2 O Gatilho
    • RU | Вот Как Строить
      • RU | Проектирование
        • RU | 1.1 Принципы
          • 1.1.1 А вы знали?
          • 1.1.2 Видеть
          • 1.1.3 Проектировать
          • 1.1.4 Подписывать
          • 1.1.5 Подготавливать
          • 1.1.6 Запускать
          • 1.1.7 Поддерживать
        • RU | 1.2 Правила
          • 1.2.1 Правило
          • 1.2.2 Что
          • 1.2.3 Как
          • 1.2.4 Когда
          • 1.2.5 Почему
          • 1.2.6 Кто
          • 1.2.7 Прочное Правило
          • 1.2.8 Целое
        • RU | 1.3 Исключения
          • 1.3.1.Исключение
          • 1.3.2 Что Если
          • 1.3.3 Включить или Отложить
          • 1.3.4 Путь Вперёд
          • 1.3.5 Предварительно Одобренное
          • 1.3.6 Эскалировать
          • 1.3.7 Свернуть Обратно
          • 1.3.8 Так Мало, Как Возможно
        • RU | 1.4 Система
          • 1.4.1 Система
          • 1.4.2 Уровни
          • 1.4.3 Карта
          • 1.4.4 Три Вида
          • 1.4.5 Ценность
          • 1.4.6 Связи
          • 1.4.7 Владельцы
          • 1.4.8 Вся Система
        • RU | 1.5 Ядро
          • 1.5.1 Основной Процесс
          • 1.5.2 Рамка
          • 1.5.3 Направление (L1)
          • 1.5.4 Хребет (L1→L3)
          • 1.5.5 Передачи
          • 1.5.6 Утверждение
          • 1.5.7 Унаследованное
          • 1.5.8 Основной
        • RU | 1.6 Суб
          • 1.6.1 Подпроцесс
          • 1.6.2 Суб или Шаг
          • 1.6.3 Резать Чисто
          • 1.6.4 Разместить
          • 1.6.5 Функция
          • 1.6.6 Внутренние Швы
          • 1.6.7 Дрейф
          • 1.6.8 Подпроцессы
        • RU | 1.7 Процедура
          • 1.7.1 Процедура
          • 1.7.2 Запуск
    • EN | Migration
      • CHAPTER 1. Why Processes Drive Transformation
      • CHAPTER 2. From Steps to System by MarvinPro
      • CHAPTER 3. Phases by MarvinPro
      • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
      • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
      • CHAPTER 6. What Makes Migration Successful by MarvinPro
    • EN | Migration S/4HANA Edition
      • 1. Why Processes Drive Transformation by MarvinPro
      • 2. Design Phase — Building for Scale by MarvinPro
      • 3. Core Functional Domains
      • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
      • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
      • 6. What Makes Migration Successful by MarvinPro
    • EN | Exceptions
      • 1. Why Exceptions Define by MarvinPro
      • 2. What Is an Exception
      • 3. Designing for Exceptions
      • 4. Operating Under Pressure
      • 5. Recovery and Stabilisation
      • 6. Learning from Exceptions
      • 7. The Exception-Ready Organisation
      • 8. The Future of Exception Handling by MarvinPro
    • PROCESSES COLLECTION
      • PROCESS Catalog
  • LEADERSHIP
    • EN | Here is How to Think
      • 1 The Individual
        • 1.1 Use Your Moral Compass
        • 1.2 Predict
        • 1.3 Own It
        • 1.4 Aim High
        • 1.5 Work Hard
        • 1.6 Pause and Continue
        • 1.7 Do More With Less
      • 2 The Leader
        • 2.1 Invest
        • 2.2 Earn It
        • 2.3 Be Clear
        • 2.4 Read the Room
        • 2.5 Task Force vs Owner
        • 2.6 Knowledge in the Room
        • 2.7 The Perfectionist
      • 3 The Owner
        • 3.1 Timing
        • 3.2 The Window
        • 3.3 Broaden your Responsibility
        • 3.4 Attrition
        • 3.5 The Long Game
        • 3.6 Pause
        • 3.7 Balance
        • 3.8 Diversity (Bonus)
      • 4 The Visionary
        • 4.1 Time moves fast
        • 4.2 The Idea Behind the Idea
        • 4.3 Automate
        • 4.4 Think Big
        • 4.5 Build to Last
        • 4.6 Earn and Compound
        • 4.7 Invest by Acquisition
        • 4.8 Pay it Forward
      • 0 The Candidate
        • 0.1 Decide
        • 0.2 Research
        • 0.3 Prepare
        • 0.4 Be Disciplined
        • 0.5 Apply
        • 0.6 Convince
        • 0.7 Pass
    • ES | Aquí es Cómo Pensar
      • 1 El Individuo
        • 1.1 Usa tu Brújula Moral
        • 1.2 Predice
        • 1.3 Hazlo Tuyo
        • 1.4 Apunta Alto
        • 1.5 Trabaja Duro
        • 1.6 Pausa y Continúa
        • 1.7 Hacer Más Con Menos
      • 2 El Líder
        • 2.1 Invierte
        • 2.2 Gánatelo
        • 2.3 Sé claro
        • 2.4 Lee la Sala
        • 2.5 Fuerza de Tarea vs Propietario
        • 2.6 El Conocimiento en la Sala
        • 2.7 El Perfeccionista
      • 3 El Propietario
        • 3.1 El Momento
        • 3.2 La Ventana
        • 3.3 Amplía tu Responsabilidad
        • 3.4 Deserción
        • 3.5 El Juego Largo
        • 3.6 Pausa
        • 3.7 Equilibrio
        • 3.8 Diversidad
      • 4 El Visionario
        • 4.1 El Tiempo Avanza Rápido
        • 4.2 La Idea Detrás de la Idea
        • 4.3 Automatiza
        • 4.4 Piensa en Grande
        • 4.5 Construye para Durar
        • 4.6 Gana y Multiplica
        • 4.7 Invierte por Adquisición
        • 4.8 Devuelve el Favor
      • 0 El Candidato
        • 0.1 Decidir
        • 0.2 Investigar
        • 0.3 Preparar
        • 0.4 Sé Disciplinado
        • 0.5 Aplica
        • 0.6 Convence
        • 0.7 Supera
    • FR | Voici Comment Penser
      • 1 L’Individu
        • 1.1 Utilise ta Boussole Morale
        • 1.2 Prédire
        • 1.3 Prends-en la Responsabilité
        • 1.4 Vise Haut
        • 1.5 Travaille Dur
        • 1.6 Pause et Continue
        • 1.7 Faire Plus Avec Moins
      • 2 Le Leader
        • 2.1 Investis
        • 2.2 Mérite-le
        • 2.3 Sois Clair
        • 2.4 Lis la Salle
        • 2.5 Force de Travail vs Propriétaire
        • 2.6 La Connaissance dans la Salle
        • 2.7 Le Perfectionniste
      • 3 Le Propriétaire
        • 3.1 Le Moment
        • 3.2 La Fenêtre
        • 3.3 Élargis ta Responsabilité
        • 3.4 Attrition (FR)
        • 3.5 Le Jeu Long
        • 3.6 Pause (FR)
        • 3.7 Équilibre
        • 3.8 Diversité
      • 4 Le Visionnaire
        • 4.1 Le Temps Avance Vite
        • 4.2 L'Idée Derrière l'Idée
        • 4.3 Automatise
        • 4.4 Pense Grand
        • 4.5 Construire pour Durer
        • 4.6 Gagne et Compose
        • 4.7 Investis par Acquisition
        • 4.8 Rends la Pareille
      • 0 Le Candidat
        • 0.1 Décider
        • 0.2 Rechercher
        • 0.3 Préparer
        • 0.4 Soyez Discipliné
        • 0.5 Postulez
        • 0.6 Convainquez
        • 0.7 Passez
    • PT | Aqui é Como Pensar
      • 1 O Indivíduo
        • 1.1 Usa a Tua Bússola Moral
        • 1.2 Prevê
        • 1.3 Torna-o Teu
        • 1.4 Aponta Alto
        • 1.5 Trabalha Arduamente
        • 1.6 Pausa e Continua
        • 1.7 Faz Mais Com Menos
      • 2 O Líder
        • 2.1 Investe
        • 2.2 Mereça-o
        • 2.3 Sê Claro
        • 2.4 Lê a Sala
        • 2.5 Força-Tarefa vs Proprietário
        • 2.6 O Conhecimento na Sala
        • 2.7 O Perfeccionista
      • 3 O Proprietário
        • 3.1 O Momento
        • 3.2 A Janela
        • 3.3 Alarga a tua Responsabilidade
        • 3.4 Atrito
        • 3.5 O Jogo Longo
        • 3.6 Pausa (PT)
        • 3.7 Equilíbrio (PT)
        • 3.8 Diversidade
      • 4 O Visionário
        • 4.1 O Tempo Avança Rápido
        • 4.2 A Ideia por Trás da Ideia
        • 4.3 Automatiza (PT)
        • 4.4 Pensa Grande
        • 4.5 Construir para Durar
        • 4.6 Ganha e Multiplica
        • 4.7 Investe por Aquisição
        • 4.8 Retribui
      • 0 O Candidato
        • 0.1 Decidir (PT)
        • 0.2 Pesquisar
        • 0.3 Preparar (PT)
        • 0.4 Sê Disciplinado
        • 0.5 Candidate-se
        • 0.6 Convença
        • 0.7 Passa
    • RU | Вот как думать
      • 1 Индивидуум
        • 1.1 Используй свой Моральный Компас
        • 1.2 Предсказывай
        • 1.3 Возьми на Себя
        • 1.4 Целься Выше
        • 1.5 Работай Усердно
        • 1.6 Пауза и Продолжение
        • 1.7 Делай Больше С Меньшим
      • 2 Лидер
        • 2.1 Инвестируй
        • 2.2 Заслужи это
        • 2.3 Будь Ясным
        • 2.4 Читай Зал
        • 2.5 Рабочая Группа vs Владелец
        • 2.6 Знание в Зале
        • 2.7 Перфекционист
      • 3 Владелец
        • 3.1 Момент
        • 3.2 Окно
        • 3.3 Расширь свою Ответственность
        • 3.4 Текучесть Kадров
        • 3.5 Долгая Игра
        • 3.6 Пауза
        • 3.7 Баланс
        • 3.8 Разнообразие
      • 4 Визионер
        • 4.1 Время Движется Быстро
        • 4.2 Идея за Идеей
        • 4.3 Автоматизируй
        • 4.4 Думай Масштабно
        • 4.5 Строй на Долгое Время
        • 4.6 Зарабатывай и Умножай
        • 4.7 Инвестируй через Приобретение
        • 4.8 Передай Дальше
      • 0 Кандидат
        • 0.1 Решить
        • 0.2 Исследовать
        • 0.3 Подготовиться
        • 0.4 Будь Дисциплинированным
        • 0.5 Откликайтесь
        • 0.6 Убеждайте
        • 0.7 Пройдите
  • STORIES
    • EN | The CEO
      • CHAPTER 0. Prologue
      • CHAPTER 1. Day One
      • CHAPTER 2. The Room
      • CHAPTER 3. The Pressure
      • CHAPTER 4. The Presentation
      • CHAPTER 5. The Contract
      • CHAPTER 6. The Transfer
      • CHAPTER 7. The Script
      • CHAPTER 8. The Distance
      • CHAPTER 9. The Customer Who Knows More
      • CHAPTER 10. The Knowledge That Left
      • CHAPTER 11. The Culture Nobody Transferred
      • CHAPTER 12. The Friend
      • CHAPTER 13. The Invisible Wall
      • CHAPTER 14. The Manager Who Performs Upward
      • Coming Soon
    • ES | El CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. El Primer Día
      • CAPÍTULO 2. La Sala
      • CAPÍTULO 3. La Presión
      • CAPÍTULO 4. La Presentación
      • CAPÍTULO 5. El Contrato
      • CAPÍTULO 6. La Transferencia
      • CAPÍTULO 7. El Guión
      • CAPÍTULO 8. La Distancia
      • CAPÍTULO 9. La Clienta Que Sabe Más
      • CAPÍTULO 10. El Conocimiento Que Se Fue
      • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
      • Próximamente
    • FR | Le CEO
      • CHAPITRE 0. Prologue
      • CHAPITRE 1. Jour Un
      • CHAPITRE 2. La Salle
      • CHAPITRE 3. La Pression
      • CHAPITRE 4. La Présentation
      • CHAPITRE 5. Le Contrat
      • CHAPITRE 6. Le Transfert
      • CHAPITRE 7. Le Script
      • CHAPITRE 8. La Distance
      • CHAPITRE 9. La Cliente Qui En Sait Plus
      • CHAPITRE 10. Le Savoir Qui Est Parti
      • CHAPITRE 11. La Culture Que Personne N'a Transférée
      • Bientôt Disponible
    • PT | O CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. Dia Um
      • CAPÍTULO 2. A Sala
      • CAPÍTULO 3. A Pressão
      • CAPÍTULO 4. A Apresentação
      • CAPÍTULO 5. O Contrato
      • CAPÍTULO 6. A Transferência
      • CAPÍTULO 7. O Guião
      • CAPÍTULO 8. A Distância
      • CAPÍTULO 9. A Cliente Que Sabe Mais
      • CAPÍTULO 10. O Conhecimento Que Partiu
      • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
      • Em Breve
    • RU | ГД
      • ГЛАВА 0. ПРОЛОГ
      • ГЛАВА 1. День первый
      • ГЛАВА 2. Комната
      • ГЛАВА 3. Давление
      • ГЛАВА 4. Презентация
      • ГЛАВА 5. Контракт
      • ГЛАВА 6. Перевод
      • ГЛАВА 7. Сценарий
      • ГЛАВА 8. Дистанция
      • ГЛАВА 9. Клиент, который знает больше
      • ГЛАВА 10. Знание, которое ушло
      • ГЛАВА 11. Культура, которую никто не передал
      • Скоро будет доступно
  • More
    • MarvinPro
    • PROCESS
      • EN | Here is How to Build
        • EN | Design
          • EN | 1.1 Principles
            • 1.1.1 Did you Know?
            • 1.1.2 See
            • 1.1.3 Design
            • 1.1.4 Sign
            • 1.1.5 Prepare
            • 1.1.6 Run
            • 1.1.7 Support
          • EN | 1.2 Rules
            • 1.2.1.A Rule
            • 1.2.2 What
            • 1.2.3 How
            • 1.2.4 When
            • 1.2.5 Why
            • 1.2.6 Who
            • 1.2.7 A Sound Rule
            • 1.2.8 The Whole
          • EN | 1.3 Exceptions
            • 1.3.1.An Exception
            • 1.3.2 The What-If
            • 1.3.3 Scope In or Park
            • 1.3.4 The Way Forward
            • 1.3.5 Pre-Approved
            • 1.3.6 Escalate
            • 1.3.7 Fold It Back
            • 1.3.8 As Few As Possible
          • EN | 1.4 System
            • 1.4.1 A System
            • 1.4.2 The Levels
            • 1.4.3 The Map
            • 1.4.4 Three Kinds
            • 1.4.5 Value
            • 1.4.6 Links
            • 1.4.7 Owners
            • 1.4.8 The System
          • EN | 1.5 Core
            • 1.5.1 A Core Process
            • 1.5.2 The Frame
            • 1.5.3 The Direction (L1)
            • 1.5.4 The Backbone (L1→L3)
            • 1.5.5 The Handoffs
            • 1.5.6 Sign-Off
            • 1.5.7 Inherited
            • 1.5.8 The Core
          • EN | 1.6 Sub
            • 1.6.1 A Sub-Process
            • 1.6.2 Sub or Step
            • 1.6.3 Cutting Clean
            • 1.6.4 Place
            • 1.6.5 Function
            • 1.6.6 The Seams Within
            • 1.6.7 Drift
            • 1.6.8 Sub-Processes
          • EN | 1.7 Procedure
            • 1.7.1 A Procedure
            • 1.7.2 The Trigger
        • EN | Operate
        • EN | Change
        • EN | Control
        • EN | Govern
        • EN | Diagnose
        • EN | Master
      • ES | Aquí es Cómo Construir
        • ES | Diseño
          • ES | 1.1 Principios
            • 1.1.1 ¿Sabías Que?
            • 1.1.2 Ver
            • 1.1.3 Diseñar
            • 1.1.4 Firmar
            • 1.1.5 Preparar
            • 1.1.6 Ejecutar
            • 1.1.7 Apoyar
          • ES | 1.2 Reglas
            • 1.2.1 Una Regla
            • 1.2.2 Qué
            • 1.2.3 Cómo
            • 1.2.4 Cuándo
            • 1.2.5 Por Qué
            • 1.2.6 Quién
            • 1.2.7 Una Regla Sólida
            • 1.2.8 El Todo
          • ES | 1.3 Excepciones
            • 1.3.1.Una Excepción
            • 1.3.2 El Qué Pasaría Si
            • 1.3.3 Incorporar o Aparcar
            • 1.3.4 El Camino a Seguir
            • 1.3.5 Preaprobado
            • 1.3.6 Escalar
            • 1.3.7 Reincorporar
            • 1.3.8 Tan Pocas Como Sea Posible
          • ES | 1.4 Sistema
            • 1.4.1 Un Sistema
            • 1.4.2 Los Niveles
            • 1.4.3 El Mapa
            • 1.4.4 Tres Tipos
            • 1.4.5 Valor
            • 1.4.6 Enlaces
            • 1.4.7 Propietarios
            • 1.4.8 El Sistema
          • ES | 1.5 Núcleo
            • 1.5.1 Un Proceso Central
            • 1.5.2 El Marco
            • 1.5.3 La Dirección (L1)
            • 1.5.4 La Columna Vertebral (L1→L3)
            • 1.5.5 Los Traspasos
            • 1.5.6 La Aprobación
            • 1.5.7 Heredado
            • 1.5.8 El Central
          • ES | 1.6 Sub
            • 1.6.1 Un Subproceso
            • 1.6.2 Sub o Paso
            • 1.6.3 Cortar Limpio
            • 1.6.4 Situar
            • 1.6.5 Función
            • 1.6.6 Las Costuras Internas
            • 1.6.7 Deriva
            • 1.6.8 Subprocesos
          • ES | 1.7 Procedimiento
            • 1.7.1 Un Procedimiento
            • 1.7.2 The Trigger
      • FR | Ici, c'est Comment Construire
        • FR | Conception
          • FR | 1.1 Principes
            • 1.1.1 Le saviez-vous ?
            • 1.1.2 Voir
            • 1.1.3 Concevoir
            • 1.1.4 Signer
            • 1.1.5 Préparer
            • 1.1.6 Exécuter
            • 1.1.7 Soutenir
          • FR | 1.2 Règles
            • 1.2.1 Une Règle
            • 1.2.2 Quoi
            • 1.2.3 Comment
            • 1.2.4 Quand
            • 1.2.5 Pourquoi
            • 1.2.6 Qui
            • 1.2.7 Une Règle Solide
            • 1.2.8 Le Tout
          • FR | 1.3 Exceptions
            • 1.3.1.Une Exception
            • 1.3.2 Le Et Si
            • 1.3.3 Intégrer ou Mettre de Côté
            • 1.3.4 Le Chemin à Suivre
            • 1.3.5 Préapprouvé
            • 1.3.6 Escalader
            • 1.3.7 Replier
            • 1.3.8 Aussi Peu Que Possible
          • FR | 1.4 Système
            • 1.4.1 Un Système
            • 1.4.2 Les Niveaux
            • 1.4.3 La Cartographie
            • 1.4.4 Trois Types
            • 1.4.5 Valeur
            • 1.4.6 Liens
            • 1.4.7 Propriétaires
            • 1.4.8 Le Système
          • FR | 1.5 Noyau
            • 1.5.1 Un Processus Central
            • 1.5.2 Le Cadre
            • 1.5.3 La Direction (L1)
            • 1.5.4 La Colonne Vertébrale (L1→L3)
            • 1.5.5 Les Passations
            • 1.5.6 La Validation
            • 1.5.7 Hérité
            • 1.5.8 Le Central
          • FR | 1.6 Sous
            • 1.6.1 Un Sous-Processus
            • 1.6.2 Sous ou Étape
            • 1.6.3 Découper Proprement
            • 1.6.4 Situer
            • 1.6.5 Fonction
            • 1.6.6 Les Coutures Internes
            • 1.6.7 Dérive
            • 1.6.8 Sous-Processus
          • FR | 1.7 Procédure
            • 1.7.1 Une Procédure
            • 1.7.2 Le Déclencheur
      • PT | Aqui é Como Construir
        • PT | Design
          • PT | 1.1 Princípios
            • 1.1.1 Sabias?
            • 1.1.2 Ver (PT)
            • 1.1.3 Design (PT)
            • 1.1.4 Assinar
            • 1.1.5 Preparar (PT)
            • 1.1.6 Executar
            • 1.1.7 Apoiar
          • PT | 1.2 Regras
            • 1.2.1 Uma Regra
            • 1.2.2 O quê
            • 1.2.3 Como
            • 1.2.4 Quando
            • 1.2.5 Por Que
            • 1.2.6 Quem
            • 1.2.7 Uma Regra Sólida
            • 1.2.8 O Todo
          • PT | 1.3 Exceções
            • 1.3.1.Uma Exceção
            • 1.3.2 O E Se
            • 1.3.3 Incorporar ou Pôr de Lado
            • 1.3.4 O Caminho a Seguir
            • 1.3.5 Pré-Aprovado
            • 1.3.6 Escalonar
            • 1.3.7 Dobrar de Volta
            • 1.3.8 Tão Poucas Quanto Possível
          • PT | 1.4 Sistema
            • 1.4.1 Um Sistema
            • 1.4.2 Os Níveis
            • 1.4.3 O Mapa
            • 1.4.4 Três Tipos
            • 1.4.5 Valor PT
            • 1.4.6 Ligações
            • 1.4.7 Proprietários
            • 1.4.8 O Sistema
          • PT | 1.5 Núcleo
            • 1.5.1 Um Processo Central
            • 1.5.2 O Enquadramento
            • 1.5.3 A Direção (L1)
            • 1.5.4 A Coluna Vertebral (L1→L3)
            • 1.5.5 Transferências
            • 1.5.6 A Aprovação
            • 1.5.7 Herdado
            • 1.5.8 O Central
          • PT | 1.6 Sub
            • 1.6.1 Um Subprocesso
            • 1.6.2 Sub ou Passo
            • 1.6.3 Cortar Limpo
            • 1.6.4 Situar PT
            • 1.6.5 Função
            • 1.6.6 As Costuras Internas
            • 1.6.7 Deriva PT
            • 1.6.8 Subprocessos
          • PT | 1.7 Procedimento
            • 1.7.1 Um Procedimento PT
            • 1.7.2 O Gatilho
      • RU | Вот Как Строить
        • RU | Проектирование
          • RU | 1.1 Принципы
            • 1.1.1 А вы знали?
            • 1.1.2 Видеть
            • 1.1.3 Проектировать
            • 1.1.4 Подписывать
            • 1.1.5 Подготавливать
            • 1.1.6 Запускать
            • 1.1.7 Поддерживать
          • RU | 1.2 Правила
            • 1.2.1 Правило
            • 1.2.2 Что
            • 1.2.3 Как
            • 1.2.4 Когда
            • 1.2.5 Почему
            • 1.2.6 Кто
            • 1.2.7 Прочное Правило
            • 1.2.8 Целое
          • RU | 1.3 Исключения
            • 1.3.1.Исключение
            • 1.3.2 Что Если
            • 1.3.3 Включить или Отложить
            • 1.3.4 Путь Вперёд
            • 1.3.5 Предварительно Одобренное
            • 1.3.6 Эскалировать
            • 1.3.7 Свернуть Обратно
            • 1.3.8 Так Мало, Как Возможно
          • RU | 1.4 Система
            • 1.4.1 Система
            • 1.4.2 Уровни
            • 1.4.3 Карта
            • 1.4.4 Три Вида
            • 1.4.5 Ценность
            • 1.4.6 Связи
            • 1.4.7 Владельцы
            • 1.4.8 Вся Система
          • RU | 1.5 Ядро
            • 1.5.1 Основной Процесс
            • 1.5.2 Рамка
            • 1.5.3 Направление (L1)
            • 1.5.4 Хребет (L1→L3)
            • 1.5.5 Передачи
            • 1.5.6 Утверждение
            • 1.5.7 Унаследованное
            • 1.5.8 Основной
          • RU | 1.6 Суб
            • 1.6.1 Подпроцесс
            • 1.6.2 Суб или Шаг
            • 1.6.3 Резать Чисто
            • 1.6.4 Разместить
            • 1.6.5 Функция
            • 1.6.6 Внутренние Швы
            • 1.6.7 Дрейф
            • 1.6.8 Подпроцессы
          • RU | 1.7 Процедура
            • 1.7.1 Процедура
            • 1.7.2 Запуск
      • EN | Migration
        • CHAPTER 1. Why Processes Drive Transformation
        • CHAPTER 2. From Steps to System by MarvinPro
        • CHAPTER 3. Phases by MarvinPro
        • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
        • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
        • CHAPTER 6. What Makes Migration Successful by MarvinPro
      • EN | Migration S/4HANA Edition
        • 1. Why Processes Drive Transformation by MarvinPro
        • 2. Design Phase — Building for Scale by MarvinPro
        • 3. Core Functional Domains
        • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
        • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
        • 6. What Makes Migration Successful by MarvinPro
      • EN | Exceptions
        • 1. Why Exceptions Define by MarvinPro
        • 2. What Is an Exception
        • 3. Designing for Exceptions
        • 4. Operating Under Pressure
        • 5. Recovery and Stabilisation
        • 6. Learning from Exceptions
        • 7. The Exception-Ready Organisation
        • 8. The Future of Exception Handling by MarvinPro
      • PROCESSES COLLECTION
        • PROCESS Catalog
    • LEADERSHIP
      • EN | Here is How to Think
        • 1 The Individual
          • 1.1 Use Your Moral Compass
          • 1.2 Predict
          • 1.3 Own It
          • 1.4 Aim High
          • 1.5 Work Hard
          • 1.6 Pause and Continue
          • 1.7 Do More With Less
        • 2 The Leader
          • 2.1 Invest
          • 2.2 Earn It
          • 2.3 Be Clear
          • 2.4 Read the Room
          • 2.5 Task Force vs Owner
          • 2.6 Knowledge in the Room
          • 2.7 The Perfectionist
        • 3 The Owner
          • 3.1 Timing
          • 3.2 The Window
          • 3.3 Broaden your Responsibility
          • 3.4 Attrition
          • 3.5 The Long Game
          • 3.6 Pause
          • 3.7 Balance
          • 3.8 Diversity (Bonus)
        • 4 The Visionary
          • 4.1 Time moves fast
          • 4.2 The Idea Behind the Idea
          • 4.3 Automate
          • 4.4 Think Big
          • 4.5 Build to Last
          • 4.6 Earn and Compound
          • 4.7 Invest by Acquisition
          • 4.8 Pay it Forward
        • 0 The Candidate
          • 0.1 Decide
          • 0.2 Research
          • 0.3 Prepare
          • 0.4 Be Disciplined
          • 0.5 Apply
          • 0.6 Convince
          • 0.7 Pass
      • ES | Aquí es Cómo Pensar
        • 1 El Individuo
          • 1.1 Usa tu Brújula Moral
          • 1.2 Predice
          • 1.3 Hazlo Tuyo
          • 1.4 Apunta Alto
          • 1.5 Trabaja Duro
          • 1.6 Pausa y Continúa
          • 1.7 Hacer Más Con Menos
        • 2 El Líder
          • 2.1 Invierte
          • 2.2 Gánatelo
          • 2.3 Sé claro
          • 2.4 Lee la Sala
          • 2.5 Fuerza de Tarea vs Propietario
          • 2.6 El Conocimiento en la Sala
          • 2.7 El Perfeccionista
        • 3 El Propietario
          • 3.1 El Momento
          • 3.2 La Ventana
          • 3.3 Amplía tu Responsabilidad
          • 3.4 Deserción
          • 3.5 El Juego Largo
          • 3.6 Pausa
          • 3.7 Equilibrio
          • 3.8 Diversidad
        • 4 El Visionario
          • 4.1 El Tiempo Avanza Rápido
          • 4.2 La Idea Detrás de la Idea
          • 4.3 Automatiza
          • 4.4 Piensa en Grande
          • 4.5 Construye para Durar
          • 4.6 Gana y Multiplica
          • 4.7 Invierte por Adquisición
          • 4.8 Devuelve el Favor
        • 0 El Candidato
          • 0.1 Decidir
          • 0.2 Investigar
          • 0.3 Preparar
          • 0.4 Sé Disciplinado
          • 0.5 Aplica
          • 0.6 Convence
          • 0.7 Supera
      • FR | Voici Comment Penser
        • 1 L’Individu
          • 1.1 Utilise ta Boussole Morale
          • 1.2 Prédire
          • 1.3 Prends-en la Responsabilité
          • 1.4 Vise Haut
          • 1.5 Travaille Dur
          • 1.6 Pause et Continue
          • 1.7 Faire Plus Avec Moins
        • 2 Le Leader
          • 2.1 Investis
          • 2.2 Mérite-le
          • 2.3 Sois Clair
          • 2.4 Lis la Salle
          • 2.5 Force de Travail vs Propriétaire
          • 2.6 La Connaissance dans la Salle
          • 2.7 Le Perfectionniste
        • 3 Le Propriétaire
          • 3.1 Le Moment
          • 3.2 La Fenêtre
          • 3.3 Élargis ta Responsabilité
          • 3.4 Attrition (FR)
          • 3.5 Le Jeu Long
          • 3.6 Pause (FR)
          • 3.7 Équilibre
          • 3.8 Diversité
        • 4 Le Visionnaire
          • 4.1 Le Temps Avance Vite
          • 4.2 L'Idée Derrière l'Idée
          • 4.3 Automatise
          • 4.4 Pense Grand
          • 4.5 Construire pour Durer
          • 4.6 Gagne et Compose
          • 4.7 Investis par Acquisition
          • 4.8 Rends la Pareille
        • 0 Le Candidat
          • 0.1 Décider
          • 0.2 Rechercher
          • 0.3 Préparer
          • 0.4 Soyez Discipliné
          • 0.5 Postulez
          • 0.6 Convainquez
          • 0.7 Passez
      • PT | Aqui é Como Pensar
        • 1 O Indivíduo
          • 1.1 Usa a Tua Bússola Moral
          • 1.2 Prevê
          • 1.3 Torna-o Teu
          • 1.4 Aponta Alto
          • 1.5 Trabalha Arduamente
          • 1.6 Pausa e Continua
          • 1.7 Faz Mais Com Menos
        • 2 O Líder
          • 2.1 Investe
          • 2.2 Mereça-o
          • 2.3 Sê Claro
          • 2.4 Lê a Sala
          • 2.5 Força-Tarefa vs Proprietário
          • 2.6 O Conhecimento na Sala
          • 2.7 O Perfeccionista
        • 3 O Proprietário
          • 3.1 O Momento
          • 3.2 A Janela
          • 3.3 Alarga a tua Responsabilidade
          • 3.4 Atrito
          • 3.5 O Jogo Longo
          • 3.6 Pausa (PT)
          • 3.7 Equilíbrio (PT)
          • 3.8 Diversidade
        • 4 O Visionário
          • 4.1 O Tempo Avança Rápido
          • 4.2 A Ideia por Trás da Ideia
          • 4.3 Automatiza (PT)
          • 4.4 Pensa Grande
          • 4.5 Construir para Durar
          • 4.6 Ganha e Multiplica
          • 4.7 Investe por Aquisição
          • 4.8 Retribui
        • 0 O Candidato
          • 0.1 Decidir (PT)
          • 0.2 Pesquisar
          • 0.3 Preparar (PT)
          • 0.4 Sê Disciplinado
          • 0.5 Candidate-se
          • 0.6 Convença
          • 0.7 Passa
      • RU | Вот как думать
        • 1 Индивидуум
          • 1.1 Используй свой Моральный Компас
          • 1.2 Предсказывай
          • 1.3 Возьми на Себя
          • 1.4 Целься Выше
          • 1.5 Работай Усердно
          • 1.6 Пауза и Продолжение
          • 1.7 Делай Больше С Меньшим
        • 2 Лидер
          • 2.1 Инвестируй
          • 2.2 Заслужи это
          • 2.3 Будь Ясным
          • 2.4 Читай Зал
          • 2.5 Рабочая Группа vs Владелец
          • 2.6 Знание в Зале
          • 2.7 Перфекционист
        • 3 Владелец
          • 3.1 Момент
          • 3.2 Окно
          • 3.3 Расширь свою Ответственность
          • 3.4 Текучесть Kадров
          • 3.5 Долгая Игра
          • 3.6 Пауза
          • 3.7 Баланс
          • 3.8 Разнообразие
        • 4 Визионер
          • 4.1 Время Движется Быстро
          • 4.2 Идея за Идеей
          • 4.3 Автоматизируй
          • 4.4 Думай Масштабно
          • 4.5 Строй на Долгое Время
          • 4.6 Зарабатывай и Умножай
          • 4.7 Инвестируй через Приобретение
          • 4.8 Передай Дальше
        • 0 Кандидат
          • 0.1 Решить
          • 0.2 Исследовать
          • 0.3 Подготовиться
          • 0.4 Будь Дисциплинированным
          • 0.5 Откликайтесь
          • 0.6 Убеждайте
          • 0.7 Пройдите
    • STORIES
      • EN | The CEO
        • CHAPTER 0. Prologue
        • CHAPTER 1. Day One
        • CHAPTER 2. The Room
        • CHAPTER 3. The Pressure
        • CHAPTER 4. The Presentation
        • CHAPTER 5. The Contract
        • CHAPTER 6. The Transfer
        • CHAPTER 7. The Script
        • CHAPTER 8. The Distance
        • CHAPTER 9. The Customer Who Knows More
        • CHAPTER 10. The Knowledge That Left
        • CHAPTER 11. The Culture Nobody Transferred
        • CHAPTER 12. The Friend
        • CHAPTER 13. The Invisible Wall
        • CHAPTER 14. The Manager Who Performs Upward
        • Coming Soon
      • ES | El CEO
        • CAPÍTULO 0. Prólogo
        • CAPÍTULO 1. El Primer Día
        • CAPÍTULO 2. La Sala
        • CAPÍTULO 3. La Presión
        • CAPÍTULO 4. La Presentación
        • CAPÍTULO 5. El Contrato
        • CAPÍTULO 6. La Transferencia
        • CAPÍTULO 7. El Guión
        • CAPÍTULO 8. La Distancia
        • CAPÍTULO 9. La Clienta Que Sabe Más
        • CAPÍTULO 10. El Conocimiento Que Se Fue
        • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
        • Próximamente
      • FR | Le CEO
        • CHAPITRE 0. Prologue
        • CHAPITRE 1. Jour Un
        • CHAPITRE 2. La Salle
        • CHAPITRE 3. La Pression
        • CHAPITRE 4. La Présentation
        • CHAPITRE 5. Le Contrat
        • CHAPITRE 6. Le Transfert
        • CHAPITRE 7. Le Script
        • CHAPITRE 8. La Distance
        • CHAPITRE 9. La Cliente Qui En Sait Plus
        • CHAPITRE 10. Le Savoir Qui Est Parti
        • CHAPITRE 11. La Culture Que Personne N'a Transférée
        • Bientôt Disponible
      • PT | O CEO
        • CAPÍTULO 0. Prólogo
        • CAPÍTULO 1. Dia Um
        • CAPÍTULO 2. A Sala
        • CAPÍTULO 3. A Pressão
        • CAPÍTULO 4. A Apresentação
        • CAPÍTULO 5. O Contrato
        • CAPÍTULO 6. A Transferência
        • CAPÍTULO 7. O Guião
        • CAPÍTULO 8. A Distância
        • CAPÍTULO 9. A Cliente Que Sabe Mais
        • CAPÍTULO 10. O Conhecimento Que Partiu
        • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
        • Em Breve
      • RU | ГД
        • ГЛАВА 0. ПРОЛОГ
        • ГЛАВА 1. День первый
        • ГЛАВА 2. Комната
        • ГЛАВА 3. Давление
        • ГЛАВА 4. Презентация
        • ГЛАВА 5. Контракт
        • ГЛАВА 6. Перевод
        • ГЛАВА 7. Сценарий
        • ГЛАВА 8. Дистанция
        • ГЛАВА 9. Клиент, который знает больше
        • ГЛАВА 10. Знание, которое ушло
        • ГЛАВА 11. Культура, которую никто не передал
        • Скоро будет доступно

PROCESS

Вот Как Строить

Проектирование

Суб

ДИСЦИПЛИНА 8
Подпроцессы

Разрезать | Разместить | Функция | Соединить

Разрезать
Как можно меньше подпроцессов, и каждый заслуживает своё место

Разместить
Каждый на том месте, где он нужен целому

Функция
Каждый отвечает за свой кусок результата целого

Соединить
Чисто соединённые и сохранённые чистыми, подпроцессы и есть процесс


ДИСЦИПЛИНА 8
Подпроцессы

Части составляют целое
Не больше подпроцессов, чем нужно работе
Каждый подпроцесс — чьё-то целое
Реальный пример
Подпроцессы

←

→

Части составляют целое

Этот том начался с утверждения: большой процесс построен из подпроцессов, и работа проектировщика — разрезать его на правильные части, каждую цельную, каждую на своём месте, каждую делающую свою долю, и снова соединить их в процесс, который держится. Дисциплины с тех пор разобрали это утверждение и по очереди рассмотрели каждую его часть. Что такое подпроцесс. Когда кусок должен быть им, а когда остаться шагом. Как разрезать его чисто. Где его разместить. За какой результат он отвечает. Как соединить его с соседями. И как сохранять его чистым, пока работа дрейфует. Здесь, в конце, они снова сходятся вместе.

Если смотреть на них вместе, это не семь отдельных навыков. Это грани одного действия: создавать части, которые в сумме дают процесс, который держится. Части — это подпроцессы, о которых говорит этот том, вместе с шагами, которые по праву остаются шагами. Чистый разрез важен, потому что часть с рваными краями нельзя ни разместить, ни передать владельцу, ни соединить. Верное место важно, потому что чистая часть в неправильной позиции всё равно ломает поток. Ясный результат важен, потому что именно на него полагаются соседи и именно из него состоит целое. Тонкий шов важен, потому что он оставляет каждую часть свободной, а целое — соединённым. А следить за дрейфом важно, потому что всё это было верно для работы такой, какой она была, а работа не перестаёт двигаться.

Поэтому ни одна часть не хороша сама по себе. Подпроцесс хорош для целого, которому служит: он разрезан там, где целое естественно делится, размещён там, где он нужен целому, отвечает за кусок результата целого и соединён так, чтобы целое держалось. Суди о части по ней самой, и хорошо нарисованный подпроцесс всё равно может оказаться не тем. Суди о ней по тому, что она делает для целого, и каждая дисциплина этого тома становится вопросом, который можно ей задать: чиста ли она, на своём ли месте, подходит ли её результат, проходит ли через её шов только этот результат, верна ли она ещё работе?

Наивысший возможный стандарт — видеть все дисциплины этого тома как одно действие, создание частей, которые соединяются в процесс, который держится, и судить о каждом подпроцессе не по нему самому, а по тому, что он делает для целого: чисто разрезан, размещён по потребности, отвечает за свой кусок результата, соединён тонким швом и остаётся верным работе по мере того, как она движется.

Ключевой вывод: Дисциплины тома (что такое подпроцесс, суб или шаг, резать чисто, разместить, функция, внутренние швы, дрейф) — не отдельные навыки, а грани одного действия: создавать части, которые в сумме дают процесс, который держится. Части — это подпроцессы вместе с шагами, которые по праву остаются шагами. Каждая дисциплина важна ради целого: чисто разрезанную часть можно разместить и передать владельцу, верное место сохраняет поток, на ясный результат полагаются соседи, тонкий шов оставляет части свободными, а целое соединённым, а наблюдение за дрейфом сохраняет всё это верным. Ни одна часть не хороша сама по себе; суди о каждой по тому, что она делает для целого.

Каждая дисциплина этого тома — одно действие: создавать части, которые соединяются в процесс, который держится; суди о каждом подпроцессе по тому, что он делает для целого.

MarvinPro · PROCESS · Вот Как Строить · Проектирование · Суб · Дисциплина 8: Подпроцессы · Раздел: Части составляют целое

MarvinPro | Октябрь 2026

marvinpro.com

Не больше подпроцессов, чем нужно работе

Если части существуют ради целого, то важно и то, сколько их. И по умолчанию — меньше. У каждого подпроцесса, который ты называешь, есть цена: название, которое нужно держать верным, результат, который нужно сформулировать, владелец, которого нужно ему дать, швы, которые нужно спроектировать с обеих сторон, место на карте, которую каждый, кто ведёт процесс, держит в голове. Процесс, в котором подпроцессов больше, чем нужно его работе, платит эту цену впустую, и хуже того, лишние части хоронят настоящую форму работы под делениями, которые ничего не значат.

Поэтому начинай с как можно меньшего числа подпроцессов и добавляй новый, только когда кусок его заслуживает. Признаки — те же, что во второй дисциплине: у куска есть настоящий поток из нескольких актов; он может дать сбой на полпути, и важно, как этот сбой обрабатывается; им владеет или его выполняет отдельная команда внутри процесса; он используется повторно более чем в одном месте; или над ним стоит работать, владеть им или отгородить его обособленно. Если у куска нет ни одного из этих признаков, он остаётся шагом, каким бы важным он ни казался. Бремя доказательства лежит на добавлении части, а не на её отсутствии.

Это не делает слишком малое число добродетелью. Настоящий поток, оставленный внутри одного шага, — это всё равно скрытая структура, сбои которой никто не спроектировал и которая ждёт, чтобы проявиться как то, чего никто не предвидел. Цель — не наименьшее возможное число, а честное: все подпроцессы, которые действительно есть в работе, и ни одним больше. А поскольку работа движется, движется и это число. Дрейф тихо добавляет части, и конструкция, у которой когда-то было верное число частей, через годы может нести несколько таких, которые больше не заслуживают своего места. Поэтому число частей проверяют, как и всё остальное, и объединение и вывод из работы — такая же часть хорошего проектирования, как и разделение.

Наивысший возможный стандарт — держать число подпроцессов таким низким, как позволяет работа, начиная с как можно меньшего числа и добавляя часть, только когда кусок заслуживает её по признакам (настоящий поток, сбой, который важен, отдельный владелец, повторное использование или необходимость работать над ним обособленно), никогда не оставляя настоящий поток скрытым в шаге и проверяя число частей по мере того, как движется работа, чтобы объединять или выводить из работы части, которые больше не заслуживают своего места.

Ключевой вывод: У каждого подпроцесса есть цена: название, результат, владелец, швы с обеих сторон, место на карте у каждого. Лишние части платят эту цену впустую и хоронят настоящую форму работы. Поэтому по умолчанию — меньше: начинай с как можно меньшего числа подпроцессов и добавляй новый, только когда кусок заслуживает его по признакам второй дисциплины (настоящий поток, сбой, который важен, отдельный владелец, повторное использование, необходимость работать над ним обособленно). Бремя доказательства лежит на добавлении части. Слишком малое число — всё равно ошибка (настоящий поток, скрытый в шаге), поэтому цель — честное число, которое снова проверяют по мере того, как работа дрейфует.

Начинай с как можно меньшего числа подпроцессов и добавляй новый, только когда кусок заслуживает своё место; бремя доказательства лежит на добавлении части.

MarvinPro · PROCESS · Вот Как Строить · Проектирование · Суб · Дисциплина 8: Подпроцессы · Раздел: Не больше подпроцессов, чем нужно работе

MarvinPro | Октябрь 2026

marvinpro.com

Каждый подпроцесс — чьё-то целое

Есть ещё один способ посмотреть на подпроцесс, и именно с него этот том начался. Для того, кто проектирует больший процесс, подпроцесс — это одна часть: название, место, результат, два шва. Но у подпроцесса обычно есть владелец: команда или отдел, которые выполняют эту работу каждый день. И с их места это вовсе не часть. Это вся их работа, от начала до конца. У неё своё начало, где работа приходит из предыдущей части; свой конец, где её результат уходит в следующую часть; свой результат, за который нужно отвечать; и очень часто свои части внутри. Для команды, которая им владеет, подпроцесс — это её работа от начала до конца.

Это та же относительность, которую эта книга встречала снова и снова: основной процесс компании оказался, с более широкой рамки, процессом поддержки, а основной процесс отдела — субом основного процесса компании. То же верно и дальше, до самого низа. Поэтому владелец подпроцесса проектирует его как целое, со всем, чему учит этот том: разрезает его на собственные части, размещает их, даёт каждой результат, соединяет их чистыми швами и следит за их дрейфом. Тем временем тот, кто проектирует больший процесс, видит одну часть и полагается только на одно: на её результат. Оба взгляда верны, и ни один не полон без другого.

Процесс держится, когда сохраняются оба. Владелец гарантирует результат, от которого зависит больший процесс, и может свободно менять внутри что угодно, пока этот результат сохраняется: это та свобода, которую описывала пятая дисциплина. Тот, кто проектирует сверху, держит швы чистыми и оставляет внутреннее устройство владельцу, и именно это делает эту свободу настоящей. Когда владелец забывает о целом вокруг себя, его часть начинает уходить от того, что нужно соседям. Когда тот, кто проектирует сверху, забывает, что каждая часть — чьё-то целое, он начинает лезть внутрь частей, которые следовало бы оставить в покое. Сохраняй оба взгляда, и одни и те же дисциплины работают на каждом уровне, внутри каждой части и вокруг каждого целого, вплоть до самих шагов, с которых начинается следующий том этой книги.

Наивысший возможный стандарт — видеть каждый подпроцесс одновременно как часть большего процесса и как целое для команды, которая им владеет, позволяя владельцу проектировать его со всеми дисциплинами этого тома и отвечать за его результат, тогда как тот, кто проектирует сверху, полагается только на этот результат и держит швы чистыми, чтобы одни и те же дисциплины работали на каждом уровне процесса.

Ключевой вывод: Для того, кто проектирует сверху, подпроцесс — одна часть; для команды, которая им владеет, это вся её работа, от начала до конца, со своим началом, концом, результатом и часто своими частями. Это снова относительность книги: основной процесс компании оказался, с более широкой рамки, процессом поддержки, а основной процесс отдела — субом основного процесса компании. Поэтому владелец проектирует подпроцесс как целое, со всеми дисциплинами этого тома, и отвечает за его результат; тот, кто проектирует сверху, полагается только на этот результат и держит швы чистыми. Оба взгляда верны, и процесс держится, когда сохраняются оба.

Каждый подпроцесс — часть для того, кто проектирует сверху, и целое для команды, которая им владеет; процесс держится, когда сохраняются оба взгляда.

MarvinPro · PROCESS · Вот Как Строить · Проектирование · Суб · Дисциплина 8: Подпроцессы · Раздел: Каждый подпроцесс — чьё-то целое

MarvinPro | Октябрь 2026

marvinpro.com

Реальный пример

Вернись к активации в последний раз и посмотри на проведение платежа с обеих сторон. С точки зрения активации это одна часть. У неё одно название и один результат: платёж проведён или отклонён, и клиенту сообщено. Она идёт первой, потому что ничто другое в активации не может начаться без неё. Её шов с открытием учётной записи (после седьмой дисциплины это одна часть вместе с записью права) пропускает только этот результат вместе с данными клиента и тарифа, которые нужны учётной записи, и у него есть определённый обратный путь на случай, если учётную запись открыть нельзя. Это всё, что активации нужно знать о проведении платежа, и всё, что ей следует знать.

Теперь встань на место платёжной команды. Для неё проведение платежа — не часть, а её целое. Оно начинается, когда активация передаёт ей подписку для оплаты, и заканчивается, когда команда возвращает тот самый единственный результат. Внутри у него свои части: после разделения в седьмой дисциплине это оплата картой и через кошелёк, банковские переводы и оплата в рассрочку, у каждой свой результат, все соединены собственными швами, а для списания они обращаются к процессу финансов как к связи, а не как к части. Команда проектирует эти части ровно с теми же дисциплинами, которым этот том учил на примере активации. И она держит число частей честным: оплата картой и через кошелёк остаётся вместе, потому что проходит и даёт сбой одинаково, а их разделение добавило бы часть, которая не заслуживает своего места.

Оба взгляда держатся одновременно. Платёжная команда может изменить работу повторных попыток, добавить новый способ оплаты в нужном сочленении или объединить две свои части, не спрашивая активацию, потому что активация полагается только на результат. А активацию можно перепроектировать вокруг проведения платежа, не трогая его внутреннее устройство. Отступи ещё на уровень выше, и это снова верно: активация сама — одна из четырёх частей основного процесса подписки, а основной процесс подписки — одна часть компании. На каждом уровне части — чьё-то целое, а целое состоит из частей. Именно это и значит, что процесс построен из подпроцессов.

Проведение платежа — одна часть активации, отвечающая за один результат, и одновременно целое платёжной команды, со своими частями, швами и дрейфом; оба взгляда держатся на каждом уровне процесса.

MarvinPro · PROCESS · Вот Как Строить · Проектирование · Суб · Дисциплина 8: Подпроцессы · Реальный пример

MarvinPro | Октябрь 2026

marvinpro.com

Подпроцессы

Дисциплины этого тома — грани одного действия: создавать части, которые соединяются в процесс, который держится. Что такое подпроцесс, суб или шаг, резать чисто, разместить, функция, внутренние швы и дрейф — каждая отвечает на один вопрос о части, и каждый ответ судят по целому. Части — это подпроцессы вместе с шагами, которые по праву остаются шагами, и ни одна часть не хороша сама по себе: она хороша для целого, которому служит.

Число частей тоже важно, и по умолчанию — меньше. У каждого подпроцесса есть цена: название, результат, владелец, швы, место на карте у каждого. Поэтому начинай с как можно меньшего числа и добавляй новый, только когда кусок заслуживает его по признакам (настоящий поток, сбой, который важен, отдельный владелец, повторное использование, необходимость работать над ним обособленно). Бремя доказательства лежит на добавлении части. Слишком малое число — всё равно ошибка, но цель — честное число: все подпроцессы, которые действительно есть в работе, и ни одним больше, и это число снова проверяют по мере того, как работа дрейфует.

И каждый подпроцесс — чьё-то целое. Для того, кто проектирует сверху, это одна часть с одним результатом; для команды, которая им владеет, это вся её работа, от начала до конца, со своими частями внутри. Владелец проектирует его со всеми дисциплинами этого тома и отвечает за его результат; тот, кто проектирует сверху, полагается только на этот результат и держит швы чистыми. Оба взгляда верны, и процесс держится, когда сохраняются оба, на каждом уровне, от компании до шагов.

Итак, дисциплина этого тома, взятая целиком, такова: строй большой процесс из подпроцессов, их должно быть так мало, как позволяет работа, и каждый должен заслуживать своё место; разрезай каждый чисто, размещай по потребности, давай ему один результат, за который он отвечает, и соединяй швами, через которые проходит только этот результат; следи за частями по мере того, как движется работа, и разрезай заново, когда признаки ясны; и помни, что каждая часть — чьё-то целое. Если сделать так, процесс, слишком большой, чтобы охватить его одним куском, становится набором частей, которые любой может найти, которыми можно владеть, которые можно менять и которым можно доверять, и которые вместе держатся как один процесс.

Большой процесс построен из подпроцессов: их так мало, как позволяет работа, каждый чисто разрезан, размещён, отвечает за свой результат и соединён чистыми швами, и каждый — чьё-то целое.

MarvinPro · PROCESS · Вот Как Строить · Проектирование · Суб · Дисциплина 8: Подпроцессы · Результат Главы

MarvinPro | Октябрь 2026

marvinpro.com

←

→

Думай Просто.

info@marvinpro.com | feedback@marvinpro.com | support@marvinpro.com | mpac@marvinpro.com | collab@marvinpro.com | artwork@marvinpro.com 

© COPYRIGHT 1990-2026 MarvinPro  All rights reserved. Content is free to read. You are welcome to share quotes or the writer's thoughts from MarvinPro, as long as you post the complete attribution exactly as it appears in the text, including the quote, author name, year and marvinpro.com. Copying or reproducing other parts, full sections or chapters without permission is not permitted.

© COPYRIGHT 1990-2026 MarvinPro  Todos los derechos reservados. El contenido es libre de leer. Eres bienvenido a compartir citas o las reflexiones del autor de MarvinPro, siempre que publiques la atribución completa exactamente como aparece en el texto, incluyendo la cita, el nombre del autor, el año y marvinpro.com. No está permitido copiar ni reproducir otras partes, secciones completas o capítulos sin permiso.

© COPYRIGHT 1990-2026 MarvinPro  Tous droits réservés. Le contenu est libre de lecture. Vous êtes invité à partager des citations ou les réflexions de l'auteur de MarvinPro, à condition de publier l'attribution complète exactement telle qu'elle apparaît dans le texte, y compris la citation, le nom de l'auteur, l'année et marvinpro.com. Copier ou reproduire d'autres parties, des sections entières ou des chapitres sans autorisation n'est pas permis.

© COPYRIGHT 1990-2026 MarvinPro  Todos os direitos reservados. O conteúdo é livre de ler. És bem-vindo a partilhar citações ou as reflexões do autor de MarvinPro, desde que publiques a atribuição completa exatamente como aparece no texto, incluindo a citação, o nome do autor, o ano e marvinpro.com. Copiar ou reproduzir outras partes, secções completas ou capítulos sem permissão não é permitido.

© COPYRIGHT 1990-2026 MarvinPro  Все права защищены. Содержание можно свободно читать. Вы можете делиться цитатами или размышлениями автора из MarvinPro при условии, что вы публикуете полную атрибуцию точно так, как она появляется в тексте, включая цитату, имя автора, год и marvinpro.com. Копирование или воспроизведение других частей, целых разделов или глав без разрешения не допускается.

Report abuse
Page details
Page updated
Report abuse