Search this site
Embedded Files
  • MarvinPro
  • PROCESS
    • EN | Here is How to Build
      • EN | Design
        • EN | 1.1 Principles
          • 1.1.1 Did you Know?
          • 1.1.2 See
          • 1.1.3 Design
          • 1.1.4 Sign
          • 1.1.5 Prepare
          • 1.1.6 Run
          • 1.1.7 Support
        • EN | 1.2 Rules
          • 1.2.1.A Rule
          • 1.2.2 What
          • 1.2.3 How
          • 1.2.4 When
          • 1.2.5 Why
          • 1.2.6 Who
          • 1.2.7 A Sound Rule
          • 1.2.8 The Whole
        • EN | 1.3 Exceptions
          • 1.3.1.An Exception
          • 1.3.2 The What-If
          • 1.3.3 Scope In or Park
          • 1.3.4 The Way Forward
          • 1.3.5 Pre-Approved
          • 1.3.6 Escalate
          • 1.3.7 Fold It Back
          • 1.3.8 As Few As Possible
        • EN | 1.4 System
          • 1.4.1 A System
          • 1.4.2 The Levels
          • 1.4.3 The Map
          • 1.4.4 Three Kinds
          • 1.4.5 Value
          • 1.4.6 Links
          • 1.4.7 Owners
          • 1.4.8 The System
        • EN | 1.5 Core
          • 1.5.1 A Core Process
          • 1.5.2 The Frame
          • 1.5.3 The Direction (L1)
          • 1.5.4 The Backbone (L1→L3)
          • 1.5.5 The Handoffs
          • 1.5.6 Sign-Off
          • 1.5.7 Inherited
          • 1.5.8 The Core
        • EN | 1.6 Sub
          • 1.6.1 A Sub-Process
          • 1.6.2 Sub or Step
          • 1.6.3 Cutting Clean
          • 1.6.4 Place
          • 1.6.5 Function
          • 1.6.6 The Seams Within
          • 1.6.7 Drift
          • 1.6.8 Sub-Processes
        • EN | 1.7 Procedure
          • 1.7.1 A Procedure
          • 1.7.2 The Trigger
      • EN | Operate
      • EN | Change
      • EN | Control
      • EN | Govern
      • EN | Diagnose
      • EN | Master
    • ES | Aquí es Cómo Construir
      • ES | Diseño
        • ES | 1.1 Principios
          • 1.1.1 ¿Sabías Que?
          • 1.1.2 Ver
          • 1.1.3 Diseñar
          • 1.1.4 Firmar
          • 1.1.5 Preparar
          • 1.1.6 Ejecutar
          • 1.1.7 Apoyar
        • ES | 1.2 Reglas
          • 1.2.1 Una Regla
          • 1.2.2 Qué
          • 1.2.3 Cómo
          • 1.2.4 Cuándo
          • 1.2.5 Por Qué
          • 1.2.6 Quién
          • 1.2.7 Una Regla Sólida
          • 1.2.8 El Todo
        • ES | 1.3 Excepciones
          • 1.3.1.Una Excepción
          • 1.3.2 El Qué Pasaría Si
          • 1.3.3 Incorporar o Aparcar
          • 1.3.4 El Camino a Seguir
          • 1.3.5 Preaprobado
          • 1.3.6 Escalar
          • 1.3.7 Reincorporar
          • 1.3.8 Tan Pocas Como Sea Posible
        • ES | 1.4 Sistema
          • 1.4.1 Un Sistema
          • 1.4.2 Los Niveles
          • 1.4.3 El Mapa
          • 1.4.4 Tres Tipos
          • 1.4.5 Valor
          • 1.4.6 Enlaces
          • 1.4.7 Propietarios
          • 1.4.8 El Sistema
        • ES | 1.5 Núcleo
          • 1.5.1 Un Proceso Central
          • 1.5.2 El Marco
          • 1.5.3 La Dirección (L1)
          • 1.5.4 La Columna Vertebral (L1→L3)
          • 1.5.5 Los Traspasos
          • 1.5.6 La Aprobación
          • 1.5.7 Heredado
          • 1.5.8 El Central
        • ES | 1.6 Sub
          • 1.6.1 Un Subproceso
          • 1.6.2 Sub o Paso
          • 1.6.3 Cortar Limpio
          • 1.6.4 Situar
          • 1.6.5 Función
          • 1.6.6 Las Costuras Internas
          • 1.6.7 Deriva
          • 1.6.8 Subprocesos
        • ES | 1.7 Procedimiento
          • 1.7.1 Un Procedimiento
          • 1.7.2 The Trigger
    • FR | Ici, c'est Comment Construire
      • FR | Conception
        • FR | 1.1 Principes
          • 1.1.1 Le saviez-vous ?
          • 1.1.2 Voir
          • 1.1.3 Concevoir
          • 1.1.4 Signer
          • 1.1.5 Préparer
          • 1.1.6 Exécuter
          • 1.1.7 Soutenir
        • FR | 1.2 Règles
          • 1.2.1 Une Règle
          • 1.2.2 Quoi
          • 1.2.3 Comment
          • 1.2.4 Quand
          • 1.2.5 Pourquoi
          • 1.2.6 Qui
          • 1.2.7 Une Règle Solide
          • 1.2.8 Le Tout
        • FR | 1.3 Exceptions
          • 1.3.1.Une Exception
          • 1.3.2 Le Et Si
          • 1.3.3 Intégrer ou Mettre de Côté
          • 1.3.4 Le Chemin à Suivre
          • 1.3.5 Préapprouvé
          • 1.3.6 Escalader
          • 1.3.7 Replier
          • 1.3.8 Aussi Peu Que Possible
        • FR | 1.4 Système
          • 1.4.1 Un Système
          • 1.4.2 Les Niveaux
          • 1.4.3 La Cartographie
          • 1.4.4 Trois Types
          • 1.4.5 Valeur
          • 1.4.6 Liens
          • 1.4.7 Propriétaires
          • 1.4.8 Le Système
        • FR | 1.5 Noyau
          • 1.5.1 Un Processus Central
          • 1.5.2 Le Cadre
          • 1.5.3 La Direction (L1)
          • 1.5.4 La Colonne Vertébrale (L1→L3)
          • 1.5.5 Les Passations
          • 1.5.6 La Validation
          • 1.5.7 Hérité
          • 1.5.8 Le Central
        • FR | 1.6 Sous
          • 1.6.1 Un Sous-Processus
          • 1.6.2 Sous ou Étape
          • 1.6.3 Découper Proprement
          • 1.6.4 Situer
          • 1.6.5 Fonction
          • 1.6.6 Les Coutures Internes
          • 1.6.7 Dérive
          • 1.6.8 Sous-Processus
        • FR | 1.7 Procédure
          • 1.7.1 Une Procédure
          • 1.7.2 Le Déclencheur
    • PT | Aqui é Como Construir
      • PT | Design
        • PT | 1.1 Princípios
          • 1.1.1 Sabias?
          • 1.1.2 Ver (PT)
          • 1.1.3 Design (PT)
          • 1.1.4 Assinar
          • 1.1.5 Preparar (PT)
          • 1.1.6 Executar
          • 1.1.7 Apoiar
        • PT | 1.2 Regras
          • 1.2.1 Uma Regra
          • 1.2.2 O quê
          • 1.2.3 Como
          • 1.2.4 Quando
          • 1.2.5 Por Que
          • 1.2.6 Quem
          • 1.2.7 Uma Regra Sólida
          • 1.2.8 O Todo
        • PT | 1.3 Exceções
          • 1.3.1.Uma Exceção
          • 1.3.2 O E Se
          • 1.3.3 Incorporar ou Pôr de Lado
          • 1.3.4 O Caminho a Seguir
          • 1.3.5 Pré-Aprovado
          • 1.3.6 Escalonar
          • 1.3.7 Dobrar de Volta
          • 1.3.8 Tão Poucas Quanto Possível
        • PT | 1.4 Sistema
          • 1.4.1 Um Sistema
          • 1.4.2 Os Níveis
          • 1.4.3 O Mapa
          • 1.4.4 Três Tipos
          • 1.4.5 Valor PT
          • 1.4.6 Ligações
          • 1.4.7 Proprietários
          • 1.4.8 O Sistema
        • PT | 1.5 Núcleo
          • 1.5.1 Um Processo Central
          • 1.5.2 O Enquadramento
          • 1.5.3 A Direção (L1)
          • 1.5.4 A Coluna Vertebral (L1→L3)
          • 1.5.5 Transferências
          • 1.5.6 A Aprovação
          • 1.5.7 Herdado
          • 1.5.8 O Central
        • PT | 1.6 Sub
          • 1.6.1 Um Subprocesso
          • 1.6.2 Sub ou Passo
          • 1.6.3 Cortar Limpo
          • 1.6.4 Situar PT
          • 1.6.5 Função
          • 1.6.6 As Costuras Internas
          • 1.6.7 Deriva PT
          • 1.6.8 Subprocessos
        • PT | 1.7 Procedimento
          • 1.7.1 Um Procedimento PT
          • 1.7.2 O Gatilho
    • RU | Вот Как Строить
      • RU | Проектирование
        • RU | 1.1 Принципы
          • 1.1.1 А вы знали?
          • 1.1.2 Видеть
          • 1.1.3 Проектировать
          • 1.1.4 Подписывать
          • 1.1.5 Подготавливать
          • 1.1.6 Запускать
          • 1.1.7 Поддерживать
        • RU | 1.2 Правила
          • 1.2.1 Правило
          • 1.2.2 Что
          • 1.2.3 Как
          • 1.2.4 Когда
          • 1.2.5 Почему
          • 1.2.6 Кто
          • 1.2.7 Прочное Правило
          • 1.2.8 Целое
        • RU | 1.3 Исключения
          • 1.3.1.Исключение
          • 1.3.2 Что Если
          • 1.3.3 Включить или Отложить
          • 1.3.4 Путь Вперёд
          • 1.3.5 Предварительно Одобренное
          • 1.3.6 Эскалировать
          • 1.3.7 Свернуть Обратно
          • 1.3.8 Так Мало, Как Возможно
        • RU | 1.4 Система
          • 1.4.1 Система
          • 1.4.2 Уровни
          • 1.4.3 Карта
          • 1.4.4 Три Вида
          • 1.4.5 Ценность
          • 1.4.6 Связи
          • 1.4.7 Владельцы
          • 1.4.8 Вся Система
        • RU | 1.5 Ядро
          • 1.5.1 Основной Процесс
          • 1.5.2 Рамка
          • 1.5.3 Направление (L1)
          • 1.5.4 Хребет (L1→L3)
          • 1.5.5 Передачи
          • 1.5.6 Утверждение
          • 1.5.7 Унаследованное
          • 1.5.8 Основной
        • RU | 1.6 Суб
          • 1.6.1 Подпроцесс
          • 1.6.2 Суб или Шаг
          • 1.6.3 Резать Чисто
          • 1.6.4 Разместить
          • 1.6.5 Функция
          • 1.6.6 Внутренние Швы
          • 1.6.7 Дрейф
          • 1.6.8 Подпроцессы
        • RU | 1.7 Процедура
          • 1.7.1 Процедура
          • 1.7.2 Запуск
    • EN | Migration
      • CHAPTER 1. Why Processes Drive Transformation
      • CHAPTER 2. From Steps to System by MarvinPro
      • CHAPTER 3. Phases by MarvinPro
      • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
      • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
      • CHAPTER 6. What Makes Migration Successful by MarvinPro
    • EN | Migration S/4HANA Edition
      • 1. Why Processes Drive Transformation by MarvinPro
      • 2. Design Phase — Building for Scale by MarvinPro
      • 3. Core Functional Domains
      • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
      • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
      • 6. What Makes Migration Successful by MarvinPro
    • EN | Exceptions
      • 1. Why Exceptions Define by MarvinPro
      • 2. What Is an Exception
      • 3. Designing for Exceptions
      • 4. Operating Under Pressure
      • 5. Recovery and Stabilisation
      • 6. Learning from Exceptions
      • 7. The Exception-Ready Organisation
      • 8. The Future of Exception Handling by MarvinPro
    • PROCESSES COLLECTION
      • PROCESS Catalog
  • LEADERSHIP
    • EN | Here is How to Think
      • 1 The Individual
        • 1.1 Use Your Moral Compass
        • 1.2 Predict
        • 1.3 Own It
        • 1.4 Aim High
        • 1.5 Work Hard
        • 1.6 Pause and Continue
        • 1.7 Do More With Less
      • 2 The Leader
        • 2.1 Invest
        • 2.2 Earn It
        • 2.3 Be Clear
        • 2.4 Read the Room
        • 2.5 Task Force vs Owner
        • 2.6 Knowledge in the Room
        • 2.7 The Perfectionist
      • 3 The Owner
        • 3.1 Timing
        • 3.2 The Window
        • 3.3 Broaden your Responsibility
        • 3.4 Attrition
        • 3.5 The Long Game
        • 3.6 Pause
        • 3.7 Balance
        • 3.8 Diversity (Bonus)
      • 4 The Visionary
        • 4.1 Time moves fast
        • 4.2 The Idea Behind the Idea
        • 4.3 Automate
        • 4.4 Think Big
        • 4.5 Build to Last
        • 4.6 Earn and Compound
        • 4.7 Invest by Acquisition
        • 4.8 Pay it Forward
      • 0 The Candidate
        • 0.1 Decide
        • 0.2 Research
        • 0.3 Prepare
        • 0.4 Be Disciplined
        • 0.5 Apply
        • 0.6 Convince
        • 0.7 Pass
    • ES | Aquí es Cómo Pensar
      • 1 El Individuo
        • 1.1 Usa tu Brújula Moral
        • 1.2 Predice
        • 1.3 Hazlo Tuyo
        • 1.4 Apunta Alto
        • 1.5 Trabaja Duro
        • 1.6 Pausa y Continúa
        • 1.7 Hacer Más Con Menos
      • 2 El Líder
        • 2.1 Invierte
        • 2.2 Gánatelo
        • 2.3 Sé claro
        • 2.4 Lee la Sala
        • 2.5 Fuerza de Tarea vs Propietario
        • 2.6 El Conocimiento en la Sala
        • 2.7 El Perfeccionista
      • 3 El Propietario
        • 3.1 El Momento
        • 3.2 La Ventana
        • 3.3 Amplía tu Responsabilidad
        • 3.4 Deserción
        • 3.5 El Juego Largo
        • 3.6 Pausa
        • 3.7 Equilibrio
        • 3.8 Diversidad
      • 4 El Visionario
        • 4.1 El Tiempo Avanza Rápido
        • 4.2 La Idea Detrás de la Idea
        • 4.3 Automatiza
        • 4.4 Piensa en Grande
        • 4.5 Construye para Durar
        • 4.6 Gana y Multiplica
        • 4.7 Invierte por Adquisición
        • 4.8 Devuelve el Favor
      • 0 El Candidato
        • 0.1 Decidir
        • 0.2 Investigar
        • 0.3 Preparar
        • 0.4 Sé Disciplinado
        • 0.5 Aplica
        • 0.6 Convence
        • 0.7 Supera
    • FR | Voici Comment Penser
      • 1 L’Individu
        • 1.1 Utilise ta Boussole Morale
        • 1.2 Prédire
        • 1.3 Prends-en la Responsabilité
        • 1.4 Vise Haut
        • 1.5 Travaille Dur
        • 1.6 Pause et Continue
        • 1.7 Faire Plus Avec Moins
      • 2 Le Leader
        • 2.1 Investis
        • 2.2 Mérite-le
        • 2.3 Sois Clair
        • 2.4 Lis la Salle
        • 2.5 Force de Travail vs Propriétaire
        • 2.6 La Connaissance dans la Salle
        • 2.7 Le Perfectionniste
      • 3 Le Propriétaire
        • 3.1 Le Moment
        • 3.2 La Fenêtre
        • 3.3 Élargis ta Responsabilité
        • 3.4 Attrition (FR)
        • 3.5 Le Jeu Long
        • 3.6 Pause (FR)
        • 3.7 Équilibre
        • 3.8 Diversité
      • 4 Le Visionnaire
        • 4.1 Le Temps Avance Vite
        • 4.2 L'Idée Derrière l'Idée
        • 4.3 Automatise
        • 4.4 Pense Grand
        • 4.5 Construire pour Durer
        • 4.6 Gagne et Compose
        • 4.7 Investis par Acquisition
        • 4.8 Rends la Pareille
      • 0 Le Candidat
        • 0.1 Décider
        • 0.2 Rechercher
        • 0.3 Préparer
        • 0.4 Soyez Discipliné
        • 0.5 Postulez
        • 0.6 Convainquez
        • 0.7 Passez
    • PT | Aqui é Como Pensar
      • 1 O Indivíduo
        • 1.1 Usa a Tua Bússola Moral
        • 1.2 Prevê
        • 1.3 Torna-o Teu
        • 1.4 Aponta Alto
        • 1.5 Trabalha Arduamente
        • 1.6 Pausa e Continua
        • 1.7 Faz Mais Com Menos
      • 2 O Líder
        • 2.1 Investe
        • 2.2 Mereça-o
        • 2.3 Sê Claro
        • 2.4 Lê a Sala
        • 2.5 Força-Tarefa vs Proprietário
        • 2.6 O Conhecimento na Sala
        • 2.7 O Perfeccionista
      • 3 O Proprietário
        • 3.1 O Momento
        • 3.2 A Janela
        • 3.3 Alarga a tua Responsabilidade
        • 3.4 Atrito
        • 3.5 O Jogo Longo
        • 3.6 Pausa (PT)
        • 3.7 Equilíbrio (PT)
        • 3.8 Diversidade
      • 4 O Visionário
        • 4.1 O Tempo Avança Rápido
        • 4.2 A Ideia por Trás da Ideia
        • 4.3 Automatiza (PT)
        • 4.4 Pensa Grande
        • 4.5 Construir para Durar
        • 4.6 Ganha e Multiplica
        • 4.7 Investe por Aquisição
        • 4.8 Retribui
      • 0 O Candidato
        • 0.1 Decidir (PT)
        • 0.2 Pesquisar
        • 0.3 Preparar (PT)
        • 0.4 Sê Disciplinado
        • 0.5 Candidate-se
        • 0.6 Convença
        • 0.7 Passa
    • RU | Вот как думать
      • 1 Индивидуум
        • 1.1 Используй свой Моральный Компас
        • 1.2 Предсказывай
        • 1.3 Возьми на Себя
        • 1.4 Целься Выше
        • 1.5 Работай Усердно
        • 1.6 Пауза и Продолжение
        • 1.7 Делай Больше С Меньшим
      • 2 Лидер
        • 2.1 Инвестируй
        • 2.2 Заслужи это
        • 2.3 Будь Ясным
        • 2.4 Читай Зал
        • 2.5 Рабочая Группа vs Владелец
        • 2.6 Знание в Зале
        • 2.7 Перфекционист
      • 3 Владелец
        • 3.1 Момент
        • 3.2 Окно
        • 3.3 Расширь свою Ответственность
        • 3.4 Текучесть Kадров
        • 3.5 Долгая Игра
        • 3.6 Пауза
        • 3.7 Баланс
        • 3.8 Разнообразие
      • 4 Визионер
        • 4.1 Время Движется Быстро
        • 4.2 Идея за Идеей
        • 4.3 Автоматизируй
        • 4.4 Думай Масштабно
        • 4.5 Строй на Долгое Время
        • 4.6 Зарабатывай и Умножай
        • 4.7 Инвестируй через Приобретение
        • 4.8 Передай Дальше
      • 0 Кандидат
        • 0.1 Решить
        • 0.2 Исследовать
        • 0.3 Подготовиться
        • 0.4 Будь Дисциплинированным
        • 0.5 Откликайтесь
        • 0.6 Убеждайте
        • 0.7 Пройдите
  • STORIES
    • EN | The CEO
      • CHAPTER 0. Prologue
      • CHAPTER 1. Day One
      • CHAPTER 2. The Room
      • CHAPTER 3. The Pressure
      • CHAPTER 4. The Presentation
      • CHAPTER 5. The Contract
      • CHAPTER 6. The Transfer
      • CHAPTER 7. The Script
      • CHAPTER 8. The Distance
      • CHAPTER 9. The Customer Who Knows More
      • CHAPTER 10. The Knowledge That Left
      • CHAPTER 11. The Culture Nobody Transferred
      • CHAPTER 12. The Friend
      • CHAPTER 13. The Invisible Wall
      • CHAPTER 14. The Manager Who Performs Upward
      • Coming Soon
    • ES | El CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. El Primer Día
      • CAPÍTULO 2. La Sala
      • CAPÍTULO 3. La Presión
      • CAPÍTULO 4. La Presentación
      • CAPÍTULO 5. El Contrato
      • CAPÍTULO 6. La Transferencia
      • CAPÍTULO 7. El Guión
      • CAPÍTULO 8. La Distancia
      • CAPÍTULO 9. La Clienta Que Sabe Más
      • CAPÍTULO 10. El Conocimiento Que Se Fue
      • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
      • Próximamente
    • FR | Le CEO
      • CHAPITRE 0. Prologue
      • CHAPITRE 1. Jour Un
      • CHAPITRE 2. La Salle
      • CHAPITRE 3. La Pression
      • CHAPITRE 4. La Présentation
      • CHAPITRE 5. Le Contrat
      • CHAPITRE 6. Le Transfert
      • CHAPITRE 7. Le Script
      • CHAPITRE 8. La Distance
      • CHAPITRE 9. La Cliente Qui En Sait Plus
      • CHAPITRE 10. Le Savoir Qui Est Parti
      • CHAPITRE 11. La Culture Que Personne N'a Transférée
      • Bientôt Disponible
    • PT | O CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. Dia Um
      • CAPÍTULO 2. A Sala
      • CAPÍTULO 3. A Pressão
      • CAPÍTULO 4. A Apresentação
      • CAPÍTULO 5. O Contrato
      • CAPÍTULO 6. A Transferência
      • CAPÍTULO 7. O Guião
      • CAPÍTULO 8. A Distância
      • CAPÍTULO 9. A Cliente Que Sabe Mais
      • CAPÍTULO 10. O Conhecimento Que Partiu
      • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
      • Em Breve
    • RU | ГД
      • ГЛАВА 0. ПРОЛОГ
      • ГЛАВА 1. День первый
      • ГЛАВА 2. Комната
      • ГЛАВА 3. Давление
      • ГЛАВА 4. Презентация
      • ГЛАВА 5. Контракт
      • ГЛАВА 6. Перевод
      • ГЛАВА 7. Сценарий
      • ГЛАВА 8. Дистанция
      • ГЛАВА 9. Клиент, который знает больше
      • ГЛАВА 10. Знание, которое ушло
      • ГЛАВА 11. Культура, которую никто не передал
      • Скоро будет доступно
 
  • MarvinPro
  • PROCESS
    • EN | Here is How to Build
      • EN | Design
        • EN | 1.1 Principles
          • 1.1.1 Did you Know?
          • 1.1.2 See
          • 1.1.3 Design
          • 1.1.4 Sign
          • 1.1.5 Prepare
          • 1.1.6 Run
          • 1.1.7 Support
        • EN | 1.2 Rules
          • 1.2.1.A Rule
          • 1.2.2 What
          • 1.2.3 How
          • 1.2.4 When
          • 1.2.5 Why
          • 1.2.6 Who
          • 1.2.7 A Sound Rule
          • 1.2.8 The Whole
        • EN | 1.3 Exceptions
          • 1.3.1.An Exception
          • 1.3.2 The What-If
          • 1.3.3 Scope In or Park
          • 1.3.4 The Way Forward
          • 1.3.5 Pre-Approved
          • 1.3.6 Escalate
          • 1.3.7 Fold It Back
          • 1.3.8 As Few As Possible
        • EN | 1.4 System
          • 1.4.1 A System
          • 1.4.2 The Levels
          • 1.4.3 The Map
          • 1.4.4 Three Kinds
          • 1.4.5 Value
          • 1.4.6 Links
          • 1.4.7 Owners
          • 1.4.8 The System
        • EN | 1.5 Core
          • 1.5.1 A Core Process
          • 1.5.2 The Frame
          • 1.5.3 The Direction (L1)
          • 1.5.4 The Backbone (L1→L3)
          • 1.5.5 The Handoffs
          • 1.5.6 Sign-Off
          • 1.5.7 Inherited
          • 1.5.8 The Core
        • EN | 1.6 Sub
          • 1.6.1 A Sub-Process
          • 1.6.2 Sub or Step
          • 1.6.3 Cutting Clean
          • 1.6.4 Place
          • 1.6.5 Function
          • 1.6.6 The Seams Within
          • 1.6.7 Drift
          • 1.6.8 Sub-Processes
        • EN | 1.7 Procedure
          • 1.7.1 A Procedure
          • 1.7.2 The Trigger
      • EN | Operate
      • EN | Change
      • EN | Control
      • EN | Govern
      • EN | Diagnose
      • EN | Master
    • ES | Aquí es Cómo Construir
      • ES | Diseño
        • ES | 1.1 Principios
          • 1.1.1 ¿Sabías Que?
          • 1.1.2 Ver
          • 1.1.3 Diseñar
          • 1.1.4 Firmar
          • 1.1.5 Preparar
          • 1.1.6 Ejecutar
          • 1.1.7 Apoyar
        • ES | 1.2 Reglas
          • 1.2.1 Una Regla
          • 1.2.2 Qué
          • 1.2.3 Cómo
          • 1.2.4 Cuándo
          • 1.2.5 Por Qué
          • 1.2.6 Quién
          • 1.2.7 Una Regla Sólida
          • 1.2.8 El Todo
        • ES | 1.3 Excepciones
          • 1.3.1.Una Excepción
          • 1.3.2 El Qué Pasaría Si
          • 1.3.3 Incorporar o Aparcar
          • 1.3.4 El Camino a Seguir
          • 1.3.5 Preaprobado
          • 1.3.6 Escalar
          • 1.3.7 Reincorporar
          • 1.3.8 Tan Pocas Como Sea Posible
        • ES | 1.4 Sistema
          • 1.4.1 Un Sistema
          • 1.4.2 Los Niveles
          • 1.4.3 El Mapa
          • 1.4.4 Tres Tipos
          • 1.4.5 Valor
          • 1.4.6 Enlaces
          • 1.4.7 Propietarios
          • 1.4.8 El Sistema
        • ES | 1.5 Núcleo
          • 1.5.1 Un Proceso Central
          • 1.5.2 El Marco
          • 1.5.3 La Dirección (L1)
          • 1.5.4 La Columna Vertebral (L1→L3)
          • 1.5.5 Los Traspasos
          • 1.5.6 La Aprobación
          • 1.5.7 Heredado
          • 1.5.8 El Central
        • ES | 1.6 Sub
          • 1.6.1 Un Subproceso
          • 1.6.2 Sub o Paso
          • 1.6.3 Cortar Limpio
          • 1.6.4 Situar
          • 1.6.5 Función
          • 1.6.6 Las Costuras Internas
          • 1.6.7 Deriva
          • 1.6.8 Subprocesos
        • ES | 1.7 Procedimiento
          • 1.7.1 Un Procedimiento
          • 1.7.2 The Trigger
    • FR | Ici, c'est Comment Construire
      • FR | Conception
        • FR | 1.1 Principes
          • 1.1.1 Le saviez-vous ?
          • 1.1.2 Voir
          • 1.1.3 Concevoir
          • 1.1.4 Signer
          • 1.1.5 Préparer
          • 1.1.6 Exécuter
          • 1.1.7 Soutenir
        • FR | 1.2 Règles
          • 1.2.1 Une Règle
          • 1.2.2 Quoi
          • 1.2.3 Comment
          • 1.2.4 Quand
          • 1.2.5 Pourquoi
          • 1.2.6 Qui
          • 1.2.7 Une Règle Solide
          • 1.2.8 Le Tout
        • FR | 1.3 Exceptions
          • 1.3.1.Une Exception
          • 1.3.2 Le Et Si
          • 1.3.3 Intégrer ou Mettre de Côté
          • 1.3.4 Le Chemin à Suivre
          • 1.3.5 Préapprouvé
          • 1.3.6 Escalader
          • 1.3.7 Replier
          • 1.3.8 Aussi Peu Que Possible
        • FR | 1.4 Système
          • 1.4.1 Un Système
          • 1.4.2 Les Niveaux
          • 1.4.3 La Cartographie
          • 1.4.4 Trois Types
          • 1.4.5 Valeur
          • 1.4.6 Liens
          • 1.4.7 Propriétaires
          • 1.4.8 Le Système
        • FR | 1.5 Noyau
          • 1.5.1 Un Processus Central
          • 1.5.2 Le Cadre
          • 1.5.3 La Direction (L1)
          • 1.5.4 La Colonne Vertébrale (L1→L3)
          • 1.5.5 Les Passations
          • 1.5.6 La Validation
          • 1.5.7 Hérité
          • 1.5.8 Le Central
        • FR | 1.6 Sous
          • 1.6.1 Un Sous-Processus
          • 1.6.2 Sous ou Étape
          • 1.6.3 Découper Proprement
          • 1.6.4 Situer
          • 1.6.5 Fonction
          • 1.6.6 Les Coutures Internes
          • 1.6.7 Dérive
          • 1.6.8 Sous-Processus
        • FR | 1.7 Procédure
          • 1.7.1 Une Procédure
          • 1.7.2 Le Déclencheur
    • PT | Aqui é Como Construir
      • PT | Design
        • PT | 1.1 Princípios
          • 1.1.1 Sabias?
          • 1.1.2 Ver (PT)
          • 1.1.3 Design (PT)
          • 1.1.4 Assinar
          • 1.1.5 Preparar (PT)
          • 1.1.6 Executar
          • 1.1.7 Apoiar
        • PT | 1.2 Regras
          • 1.2.1 Uma Regra
          • 1.2.2 O quê
          • 1.2.3 Como
          • 1.2.4 Quando
          • 1.2.5 Por Que
          • 1.2.6 Quem
          • 1.2.7 Uma Regra Sólida
          • 1.2.8 O Todo
        • PT | 1.3 Exceções
          • 1.3.1.Uma Exceção
          • 1.3.2 O E Se
          • 1.3.3 Incorporar ou Pôr de Lado
          • 1.3.4 O Caminho a Seguir
          • 1.3.5 Pré-Aprovado
          • 1.3.6 Escalonar
          • 1.3.7 Dobrar de Volta
          • 1.3.8 Tão Poucas Quanto Possível
        • PT | 1.4 Sistema
          • 1.4.1 Um Sistema
          • 1.4.2 Os Níveis
          • 1.4.3 O Mapa
          • 1.4.4 Três Tipos
          • 1.4.5 Valor PT
          • 1.4.6 Ligações
          • 1.4.7 Proprietários
          • 1.4.8 O Sistema
        • PT | 1.5 Núcleo
          • 1.5.1 Um Processo Central
          • 1.5.2 O Enquadramento
          • 1.5.3 A Direção (L1)
          • 1.5.4 A Coluna Vertebral (L1→L3)
          • 1.5.5 Transferências
          • 1.5.6 A Aprovação
          • 1.5.7 Herdado
          • 1.5.8 O Central
        • PT | 1.6 Sub
          • 1.6.1 Um Subprocesso
          • 1.6.2 Sub ou Passo
          • 1.6.3 Cortar Limpo
          • 1.6.4 Situar PT
          • 1.6.5 Função
          • 1.6.6 As Costuras Internas
          • 1.6.7 Deriva PT
          • 1.6.8 Subprocessos
        • PT | 1.7 Procedimento
          • 1.7.1 Um Procedimento PT
          • 1.7.2 O Gatilho
    • RU | Вот Как Строить
      • RU | Проектирование
        • RU | 1.1 Принципы
          • 1.1.1 А вы знали?
          • 1.1.2 Видеть
          • 1.1.3 Проектировать
          • 1.1.4 Подписывать
          • 1.1.5 Подготавливать
          • 1.1.6 Запускать
          • 1.1.7 Поддерживать
        • RU | 1.2 Правила
          • 1.2.1 Правило
          • 1.2.2 Что
          • 1.2.3 Как
          • 1.2.4 Когда
          • 1.2.5 Почему
          • 1.2.6 Кто
          • 1.2.7 Прочное Правило
          • 1.2.8 Целое
        • RU | 1.3 Исключения
          • 1.3.1.Исключение
          • 1.3.2 Что Если
          • 1.3.3 Включить или Отложить
          • 1.3.4 Путь Вперёд
          • 1.3.5 Предварительно Одобренное
          • 1.3.6 Эскалировать
          • 1.3.7 Свернуть Обратно
          • 1.3.8 Так Мало, Как Возможно
        • RU | 1.4 Система
          • 1.4.1 Система
          • 1.4.2 Уровни
          • 1.4.3 Карта
          • 1.4.4 Три Вида
          • 1.4.5 Ценность
          • 1.4.6 Связи
          • 1.4.7 Владельцы
          • 1.4.8 Вся Система
        • RU | 1.5 Ядро
          • 1.5.1 Основной Процесс
          • 1.5.2 Рамка
          • 1.5.3 Направление (L1)
          • 1.5.4 Хребет (L1→L3)
          • 1.5.5 Передачи
          • 1.5.6 Утверждение
          • 1.5.7 Унаследованное
          • 1.5.8 Основной
        • RU | 1.6 Суб
          • 1.6.1 Подпроцесс
          • 1.6.2 Суб или Шаг
          • 1.6.3 Резать Чисто
          • 1.6.4 Разместить
          • 1.6.5 Функция
          • 1.6.6 Внутренние Швы
          • 1.6.7 Дрейф
          • 1.6.8 Подпроцессы
        • RU | 1.7 Процедура
          • 1.7.1 Процедура
          • 1.7.2 Запуск
    • EN | Migration
      • CHAPTER 1. Why Processes Drive Transformation
      • CHAPTER 2. From Steps to System by MarvinPro
      • CHAPTER 3. Phases by MarvinPro
      • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
      • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
      • CHAPTER 6. What Makes Migration Successful by MarvinPro
    • EN | Migration S/4HANA Edition
      • 1. Why Processes Drive Transformation by MarvinPro
      • 2. Design Phase — Building for Scale by MarvinPro
      • 3. Core Functional Domains
      • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
      • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
      • 6. What Makes Migration Successful by MarvinPro
    • EN | Exceptions
      • 1. Why Exceptions Define by MarvinPro
      • 2. What Is an Exception
      • 3. Designing for Exceptions
      • 4. Operating Under Pressure
      • 5. Recovery and Stabilisation
      • 6. Learning from Exceptions
      • 7. The Exception-Ready Organisation
      • 8. The Future of Exception Handling by MarvinPro
    • PROCESSES COLLECTION
      • PROCESS Catalog
  • LEADERSHIP
    • EN | Here is How to Think
      • 1 The Individual
        • 1.1 Use Your Moral Compass
        • 1.2 Predict
        • 1.3 Own It
        • 1.4 Aim High
        • 1.5 Work Hard
        • 1.6 Pause and Continue
        • 1.7 Do More With Less
      • 2 The Leader
        • 2.1 Invest
        • 2.2 Earn It
        • 2.3 Be Clear
        • 2.4 Read the Room
        • 2.5 Task Force vs Owner
        • 2.6 Knowledge in the Room
        • 2.7 The Perfectionist
      • 3 The Owner
        • 3.1 Timing
        • 3.2 The Window
        • 3.3 Broaden your Responsibility
        • 3.4 Attrition
        • 3.5 The Long Game
        • 3.6 Pause
        • 3.7 Balance
        • 3.8 Diversity (Bonus)
      • 4 The Visionary
        • 4.1 Time moves fast
        • 4.2 The Idea Behind the Idea
        • 4.3 Automate
        • 4.4 Think Big
        • 4.5 Build to Last
        • 4.6 Earn and Compound
        • 4.7 Invest by Acquisition
        • 4.8 Pay it Forward
      • 0 The Candidate
        • 0.1 Decide
        • 0.2 Research
        • 0.3 Prepare
        • 0.4 Be Disciplined
        • 0.5 Apply
        • 0.6 Convince
        • 0.7 Pass
    • ES | Aquí es Cómo Pensar
      • 1 El Individuo
        • 1.1 Usa tu Brújula Moral
        • 1.2 Predice
        • 1.3 Hazlo Tuyo
        • 1.4 Apunta Alto
        • 1.5 Trabaja Duro
        • 1.6 Pausa y Continúa
        • 1.7 Hacer Más Con Menos
      • 2 El Líder
        • 2.1 Invierte
        • 2.2 Gánatelo
        • 2.3 Sé claro
        • 2.4 Lee la Sala
        • 2.5 Fuerza de Tarea vs Propietario
        • 2.6 El Conocimiento en la Sala
        • 2.7 El Perfeccionista
      • 3 El Propietario
        • 3.1 El Momento
        • 3.2 La Ventana
        • 3.3 Amplía tu Responsabilidad
        • 3.4 Deserción
        • 3.5 El Juego Largo
        • 3.6 Pausa
        • 3.7 Equilibrio
        • 3.8 Diversidad
      • 4 El Visionario
        • 4.1 El Tiempo Avanza Rápido
        • 4.2 La Idea Detrás de la Idea
        • 4.3 Automatiza
        • 4.4 Piensa en Grande
        • 4.5 Construye para Durar
        • 4.6 Gana y Multiplica
        • 4.7 Invierte por Adquisición
        • 4.8 Devuelve el Favor
      • 0 El Candidato
        • 0.1 Decidir
        • 0.2 Investigar
        • 0.3 Preparar
        • 0.4 Sé Disciplinado
        • 0.5 Aplica
        • 0.6 Convence
        • 0.7 Supera
    • FR | Voici Comment Penser
      • 1 L’Individu
        • 1.1 Utilise ta Boussole Morale
        • 1.2 Prédire
        • 1.3 Prends-en la Responsabilité
        • 1.4 Vise Haut
        • 1.5 Travaille Dur
        • 1.6 Pause et Continue
        • 1.7 Faire Plus Avec Moins
      • 2 Le Leader
        • 2.1 Investis
        • 2.2 Mérite-le
        • 2.3 Sois Clair
        • 2.4 Lis la Salle
        • 2.5 Force de Travail vs Propriétaire
        • 2.6 La Connaissance dans la Salle
        • 2.7 Le Perfectionniste
      • 3 Le Propriétaire
        • 3.1 Le Moment
        • 3.2 La Fenêtre
        • 3.3 Élargis ta Responsabilité
        • 3.4 Attrition (FR)
        • 3.5 Le Jeu Long
        • 3.6 Pause (FR)
        • 3.7 Équilibre
        • 3.8 Diversité
      • 4 Le Visionnaire
        • 4.1 Le Temps Avance Vite
        • 4.2 L'Idée Derrière l'Idée
        • 4.3 Automatise
        • 4.4 Pense Grand
        • 4.5 Construire pour Durer
        • 4.6 Gagne et Compose
        • 4.7 Investis par Acquisition
        • 4.8 Rends la Pareille
      • 0 Le Candidat
        • 0.1 Décider
        • 0.2 Rechercher
        • 0.3 Préparer
        • 0.4 Soyez Discipliné
        • 0.5 Postulez
        • 0.6 Convainquez
        • 0.7 Passez
    • PT | Aqui é Como Pensar
      • 1 O Indivíduo
        • 1.1 Usa a Tua Bússola Moral
        • 1.2 Prevê
        • 1.3 Torna-o Teu
        • 1.4 Aponta Alto
        • 1.5 Trabalha Arduamente
        • 1.6 Pausa e Continua
        • 1.7 Faz Mais Com Menos
      • 2 O Líder
        • 2.1 Investe
        • 2.2 Mereça-o
        • 2.3 Sê Claro
        • 2.4 Lê a Sala
        • 2.5 Força-Tarefa vs Proprietário
        • 2.6 O Conhecimento na Sala
        • 2.7 O Perfeccionista
      • 3 O Proprietário
        • 3.1 O Momento
        • 3.2 A Janela
        • 3.3 Alarga a tua Responsabilidade
        • 3.4 Atrito
        • 3.5 O Jogo Longo
        • 3.6 Pausa (PT)
        • 3.7 Equilíbrio (PT)
        • 3.8 Diversidade
      • 4 O Visionário
        • 4.1 O Tempo Avança Rápido
        • 4.2 A Ideia por Trás da Ideia
        • 4.3 Automatiza (PT)
        • 4.4 Pensa Grande
        • 4.5 Construir para Durar
        • 4.6 Ganha e Multiplica
        • 4.7 Investe por Aquisição
        • 4.8 Retribui
      • 0 O Candidato
        • 0.1 Decidir (PT)
        • 0.2 Pesquisar
        • 0.3 Preparar (PT)
        • 0.4 Sê Disciplinado
        • 0.5 Candidate-se
        • 0.6 Convença
        • 0.7 Passa
    • RU | Вот как думать
      • 1 Индивидуум
        • 1.1 Используй свой Моральный Компас
        • 1.2 Предсказывай
        • 1.3 Возьми на Себя
        • 1.4 Целься Выше
        • 1.5 Работай Усердно
        • 1.6 Пауза и Продолжение
        • 1.7 Делай Больше С Меньшим
      • 2 Лидер
        • 2.1 Инвестируй
        • 2.2 Заслужи это
        • 2.3 Будь Ясным
        • 2.4 Читай Зал
        • 2.5 Рабочая Группа vs Владелец
        • 2.6 Знание в Зале
        • 2.7 Перфекционист
      • 3 Владелец
        • 3.1 Момент
        • 3.2 Окно
        • 3.3 Расширь свою Ответственность
        • 3.4 Текучесть Kадров
        • 3.5 Долгая Игра
        • 3.6 Пауза
        • 3.7 Баланс
        • 3.8 Разнообразие
      • 4 Визионер
        • 4.1 Время Движется Быстро
        • 4.2 Идея за Идеей
        • 4.3 Автоматизируй
        • 4.4 Думай Масштабно
        • 4.5 Строй на Долгое Время
        • 4.6 Зарабатывай и Умножай
        • 4.7 Инвестируй через Приобретение
        • 4.8 Передай Дальше
      • 0 Кандидат
        • 0.1 Решить
        • 0.2 Исследовать
        • 0.3 Подготовиться
        • 0.4 Будь Дисциплинированным
        • 0.5 Откликайтесь
        • 0.6 Убеждайте
        • 0.7 Пройдите
  • STORIES
    • EN | The CEO
      • CHAPTER 0. Prologue
      • CHAPTER 1. Day One
      • CHAPTER 2. The Room
      • CHAPTER 3. The Pressure
      • CHAPTER 4. The Presentation
      • CHAPTER 5. The Contract
      • CHAPTER 6. The Transfer
      • CHAPTER 7. The Script
      • CHAPTER 8. The Distance
      • CHAPTER 9. The Customer Who Knows More
      • CHAPTER 10. The Knowledge That Left
      • CHAPTER 11. The Culture Nobody Transferred
      • CHAPTER 12. The Friend
      • CHAPTER 13. The Invisible Wall
      • CHAPTER 14. The Manager Who Performs Upward
      • Coming Soon
    • ES | El CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. El Primer Día
      • CAPÍTULO 2. La Sala
      • CAPÍTULO 3. La Presión
      • CAPÍTULO 4. La Presentación
      • CAPÍTULO 5. El Contrato
      • CAPÍTULO 6. La Transferencia
      • CAPÍTULO 7. El Guión
      • CAPÍTULO 8. La Distancia
      • CAPÍTULO 9. La Clienta Que Sabe Más
      • CAPÍTULO 10. El Conocimiento Que Se Fue
      • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
      • Próximamente
    • FR | Le CEO
      • CHAPITRE 0. Prologue
      • CHAPITRE 1. Jour Un
      • CHAPITRE 2. La Salle
      • CHAPITRE 3. La Pression
      • CHAPITRE 4. La Présentation
      • CHAPITRE 5. Le Contrat
      • CHAPITRE 6. Le Transfert
      • CHAPITRE 7. Le Script
      • CHAPITRE 8. La Distance
      • CHAPITRE 9. La Cliente Qui En Sait Plus
      • CHAPITRE 10. Le Savoir Qui Est Parti
      • CHAPITRE 11. La Culture Que Personne N'a Transférée
      • Bientôt Disponible
    • PT | O CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. Dia Um
      • CAPÍTULO 2. A Sala
      • CAPÍTULO 3. A Pressão
      • CAPÍTULO 4. A Apresentação
      • CAPÍTULO 5. O Contrato
      • CAPÍTULO 6. A Transferência
      • CAPÍTULO 7. O Guião
      • CAPÍTULO 8. A Distância
      • CAPÍTULO 9. A Cliente Que Sabe Mais
      • CAPÍTULO 10. O Conhecimento Que Partiu
      • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
      • Em Breve
    • RU | ГД
      • ГЛАВА 0. ПРОЛОГ
      • ГЛАВА 1. День первый
      • ГЛАВА 2. Комната
      • ГЛАВА 3. Давление
      • ГЛАВА 4. Презентация
      • ГЛАВА 5. Контракт
      • ГЛАВА 6. Перевод
      • ГЛАВА 7. Сценарий
      • ГЛАВА 8. Дистанция
      • ГЛАВА 9. Клиент, который знает больше
      • ГЛАВА 10. Знание, которое ушло
      • ГЛАВА 11. Культура, которую никто не передал
      • Скоро будет доступно
  • More
    • MarvinPro
    • PROCESS
      • EN | Here is How to Build
        • EN | Design
          • EN | 1.1 Principles
            • 1.1.1 Did you Know?
            • 1.1.2 See
            • 1.1.3 Design
            • 1.1.4 Sign
            • 1.1.5 Prepare
            • 1.1.6 Run
            • 1.1.7 Support
          • EN | 1.2 Rules
            • 1.2.1.A Rule
            • 1.2.2 What
            • 1.2.3 How
            • 1.2.4 When
            • 1.2.5 Why
            • 1.2.6 Who
            • 1.2.7 A Sound Rule
            • 1.2.8 The Whole
          • EN | 1.3 Exceptions
            • 1.3.1.An Exception
            • 1.3.2 The What-If
            • 1.3.3 Scope In or Park
            • 1.3.4 The Way Forward
            • 1.3.5 Pre-Approved
            • 1.3.6 Escalate
            • 1.3.7 Fold It Back
            • 1.3.8 As Few As Possible
          • EN | 1.4 System
            • 1.4.1 A System
            • 1.4.2 The Levels
            • 1.4.3 The Map
            • 1.4.4 Three Kinds
            • 1.4.5 Value
            • 1.4.6 Links
            • 1.4.7 Owners
            • 1.4.8 The System
          • EN | 1.5 Core
            • 1.5.1 A Core Process
            • 1.5.2 The Frame
            • 1.5.3 The Direction (L1)
            • 1.5.4 The Backbone (L1→L3)
            • 1.5.5 The Handoffs
            • 1.5.6 Sign-Off
            • 1.5.7 Inherited
            • 1.5.8 The Core
          • EN | 1.6 Sub
            • 1.6.1 A Sub-Process
            • 1.6.2 Sub or Step
            • 1.6.3 Cutting Clean
            • 1.6.4 Place
            • 1.6.5 Function
            • 1.6.6 The Seams Within
            • 1.6.7 Drift
            • 1.6.8 Sub-Processes
          • EN | 1.7 Procedure
            • 1.7.1 A Procedure
            • 1.7.2 The Trigger
        • EN | Operate
        • EN | Change
        • EN | Control
        • EN | Govern
        • EN | Diagnose
        • EN | Master
      • ES | Aquí es Cómo Construir
        • ES | Diseño
          • ES | 1.1 Principios
            • 1.1.1 ¿Sabías Que?
            • 1.1.2 Ver
            • 1.1.3 Diseñar
            • 1.1.4 Firmar
            • 1.1.5 Preparar
            • 1.1.6 Ejecutar
            • 1.1.7 Apoyar
          • ES | 1.2 Reglas
            • 1.2.1 Una Regla
            • 1.2.2 Qué
            • 1.2.3 Cómo
            • 1.2.4 Cuándo
            • 1.2.5 Por Qué
            • 1.2.6 Quién
            • 1.2.7 Una Regla Sólida
            • 1.2.8 El Todo
          • ES | 1.3 Excepciones
            • 1.3.1.Una Excepción
            • 1.3.2 El Qué Pasaría Si
            • 1.3.3 Incorporar o Aparcar
            • 1.3.4 El Camino a Seguir
            • 1.3.5 Preaprobado
            • 1.3.6 Escalar
            • 1.3.7 Reincorporar
            • 1.3.8 Tan Pocas Como Sea Posible
          • ES | 1.4 Sistema
            • 1.4.1 Un Sistema
            • 1.4.2 Los Niveles
            • 1.4.3 El Mapa
            • 1.4.4 Tres Tipos
            • 1.4.5 Valor
            • 1.4.6 Enlaces
            • 1.4.7 Propietarios
            • 1.4.8 El Sistema
          • ES | 1.5 Núcleo
            • 1.5.1 Un Proceso Central
            • 1.5.2 El Marco
            • 1.5.3 La Dirección (L1)
            • 1.5.4 La Columna Vertebral (L1→L3)
            • 1.5.5 Los Traspasos
            • 1.5.6 La Aprobación
            • 1.5.7 Heredado
            • 1.5.8 El Central
          • ES | 1.6 Sub
            • 1.6.1 Un Subproceso
            • 1.6.2 Sub o Paso
            • 1.6.3 Cortar Limpio
            • 1.6.4 Situar
            • 1.6.5 Función
            • 1.6.6 Las Costuras Internas
            • 1.6.7 Deriva
            • 1.6.8 Subprocesos
          • ES | 1.7 Procedimiento
            • 1.7.1 Un Procedimiento
            • 1.7.2 The Trigger
      • FR | Ici, c'est Comment Construire
        • FR | Conception
          • FR | 1.1 Principes
            • 1.1.1 Le saviez-vous ?
            • 1.1.2 Voir
            • 1.1.3 Concevoir
            • 1.1.4 Signer
            • 1.1.5 Préparer
            • 1.1.6 Exécuter
            • 1.1.7 Soutenir
          • FR | 1.2 Règles
            • 1.2.1 Une Règle
            • 1.2.2 Quoi
            • 1.2.3 Comment
            • 1.2.4 Quand
            • 1.2.5 Pourquoi
            • 1.2.6 Qui
            • 1.2.7 Une Règle Solide
            • 1.2.8 Le Tout
          • FR | 1.3 Exceptions
            • 1.3.1.Une Exception
            • 1.3.2 Le Et Si
            • 1.3.3 Intégrer ou Mettre de Côté
            • 1.3.4 Le Chemin à Suivre
            • 1.3.5 Préapprouvé
            • 1.3.6 Escalader
            • 1.3.7 Replier
            • 1.3.8 Aussi Peu Que Possible
          • FR | 1.4 Système
            • 1.4.1 Un Système
            • 1.4.2 Les Niveaux
            • 1.4.3 La Cartographie
            • 1.4.4 Trois Types
            • 1.4.5 Valeur
            • 1.4.6 Liens
            • 1.4.7 Propriétaires
            • 1.4.8 Le Système
          • FR | 1.5 Noyau
            • 1.5.1 Un Processus Central
            • 1.5.2 Le Cadre
            • 1.5.3 La Direction (L1)
            • 1.5.4 La Colonne Vertébrale (L1→L3)
            • 1.5.5 Les Passations
            • 1.5.6 La Validation
            • 1.5.7 Hérité
            • 1.5.8 Le Central
          • FR | 1.6 Sous
            • 1.6.1 Un Sous-Processus
            • 1.6.2 Sous ou Étape
            • 1.6.3 Découper Proprement
            • 1.6.4 Situer
            • 1.6.5 Fonction
            • 1.6.6 Les Coutures Internes
            • 1.6.7 Dérive
            • 1.6.8 Sous-Processus
          • FR | 1.7 Procédure
            • 1.7.1 Une Procédure
            • 1.7.2 Le Déclencheur
      • PT | Aqui é Como Construir
        • PT | Design
          • PT | 1.1 Princípios
            • 1.1.1 Sabias?
            • 1.1.2 Ver (PT)
            • 1.1.3 Design (PT)
            • 1.1.4 Assinar
            • 1.1.5 Preparar (PT)
            • 1.1.6 Executar
            • 1.1.7 Apoiar
          • PT | 1.2 Regras
            • 1.2.1 Uma Regra
            • 1.2.2 O quê
            • 1.2.3 Como
            • 1.2.4 Quando
            • 1.2.5 Por Que
            • 1.2.6 Quem
            • 1.2.7 Uma Regra Sólida
            • 1.2.8 O Todo
          • PT | 1.3 Exceções
            • 1.3.1.Uma Exceção
            • 1.3.2 O E Se
            • 1.3.3 Incorporar ou Pôr de Lado
            • 1.3.4 O Caminho a Seguir
            • 1.3.5 Pré-Aprovado
            • 1.3.6 Escalonar
            • 1.3.7 Dobrar de Volta
            • 1.3.8 Tão Poucas Quanto Possível
          • PT | 1.4 Sistema
            • 1.4.1 Um Sistema
            • 1.4.2 Os Níveis
            • 1.4.3 O Mapa
            • 1.4.4 Três Tipos
            • 1.4.5 Valor PT
            • 1.4.6 Ligações
            • 1.4.7 Proprietários
            • 1.4.8 O Sistema
          • PT | 1.5 Núcleo
            • 1.5.1 Um Processo Central
            • 1.5.2 O Enquadramento
            • 1.5.3 A Direção (L1)
            • 1.5.4 A Coluna Vertebral (L1→L3)
            • 1.5.5 Transferências
            • 1.5.6 A Aprovação
            • 1.5.7 Herdado
            • 1.5.8 O Central
          • PT | 1.6 Sub
            • 1.6.1 Um Subprocesso
            • 1.6.2 Sub ou Passo
            • 1.6.3 Cortar Limpo
            • 1.6.4 Situar PT
            • 1.6.5 Função
            • 1.6.6 As Costuras Internas
            • 1.6.7 Deriva PT
            • 1.6.8 Subprocessos
          • PT | 1.7 Procedimento
            • 1.7.1 Um Procedimento PT
            • 1.7.2 O Gatilho
      • RU | Вот Как Строить
        • RU | Проектирование
          • RU | 1.1 Принципы
            • 1.1.1 А вы знали?
            • 1.1.2 Видеть
            • 1.1.3 Проектировать
            • 1.1.4 Подписывать
            • 1.1.5 Подготавливать
            • 1.1.6 Запускать
            • 1.1.7 Поддерживать
          • RU | 1.2 Правила
            • 1.2.1 Правило
            • 1.2.2 Что
            • 1.2.3 Как
            • 1.2.4 Когда
            • 1.2.5 Почему
            • 1.2.6 Кто
            • 1.2.7 Прочное Правило
            • 1.2.8 Целое
          • RU | 1.3 Исключения
            • 1.3.1.Исключение
            • 1.3.2 Что Если
            • 1.3.3 Включить или Отложить
            • 1.3.4 Путь Вперёд
            • 1.3.5 Предварительно Одобренное
            • 1.3.6 Эскалировать
            • 1.3.7 Свернуть Обратно
            • 1.3.8 Так Мало, Как Возможно
          • RU | 1.4 Система
            • 1.4.1 Система
            • 1.4.2 Уровни
            • 1.4.3 Карта
            • 1.4.4 Три Вида
            • 1.4.5 Ценность
            • 1.4.6 Связи
            • 1.4.7 Владельцы
            • 1.4.8 Вся Система
          • RU | 1.5 Ядро
            • 1.5.1 Основной Процесс
            • 1.5.2 Рамка
            • 1.5.3 Направление (L1)
            • 1.5.4 Хребет (L1→L3)
            • 1.5.5 Передачи
            • 1.5.6 Утверждение
            • 1.5.7 Унаследованное
            • 1.5.8 Основной
          • RU | 1.6 Суб
            • 1.6.1 Подпроцесс
            • 1.6.2 Суб или Шаг
            • 1.6.3 Резать Чисто
            • 1.6.4 Разместить
            • 1.6.5 Функция
            • 1.6.6 Внутренние Швы
            • 1.6.7 Дрейф
            • 1.6.8 Подпроцессы
          • RU | 1.7 Процедура
            • 1.7.1 Процедура
            • 1.7.2 Запуск
      • EN | Migration
        • CHAPTER 1. Why Processes Drive Transformation
        • CHAPTER 2. From Steps to System by MarvinPro
        • CHAPTER 3. Phases by MarvinPro
        • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
        • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
        • CHAPTER 6. What Makes Migration Successful by MarvinPro
      • EN | Migration S/4HANA Edition
        • 1. Why Processes Drive Transformation by MarvinPro
        • 2. Design Phase — Building for Scale by MarvinPro
        • 3. Core Functional Domains
        • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
        • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
        • 6. What Makes Migration Successful by MarvinPro
      • EN | Exceptions
        • 1. Why Exceptions Define by MarvinPro
        • 2. What Is an Exception
        • 3. Designing for Exceptions
        • 4. Operating Under Pressure
        • 5. Recovery and Stabilisation
        • 6. Learning from Exceptions
        • 7. The Exception-Ready Organisation
        • 8. The Future of Exception Handling by MarvinPro
      • PROCESSES COLLECTION
        • PROCESS Catalog
    • LEADERSHIP
      • EN | Here is How to Think
        • 1 The Individual
          • 1.1 Use Your Moral Compass
          • 1.2 Predict
          • 1.3 Own It
          • 1.4 Aim High
          • 1.5 Work Hard
          • 1.6 Pause and Continue
          • 1.7 Do More With Less
        • 2 The Leader
          • 2.1 Invest
          • 2.2 Earn It
          • 2.3 Be Clear
          • 2.4 Read the Room
          • 2.5 Task Force vs Owner
          • 2.6 Knowledge in the Room
          • 2.7 The Perfectionist
        • 3 The Owner
          • 3.1 Timing
          • 3.2 The Window
          • 3.3 Broaden your Responsibility
          • 3.4 Attrition
          • 3.5 The Long Game
          • 3.6 Pause
          • 3.7 Balance
          • 3.8 Diversity (Bonus)
        • 4 The Visionary
          • 4.1 Time moves fast
          • 4.2 The Idea Behind the Idea
          • 4.3 Automate
          • 4.4 Think Big
          • 4.5 Build to Last
          • 4.6 Earn and Compound
          • 4.7 Invest by Acquisition
          • 4.8 Pay it Forward
        • 0 The Candidate
          • 0.1 Decide
          • 0.2 Research
          • 0.3 Prepare
          • 0.4 Be Disciplined
          • 0.5 Apply
          • 0.6 Convince
          • 0.7 Pass
      • ES | Aquí es Cómo Pensar
        • 1 El Individuo
          • 1.1 Usa tu Brújula Moral
          • 1.2 Predice
          • 1.3 Hazlo Tuyo
          • 1.4 Apunta Alto
          • 1.5 Trabaja Duro
          • 1.6 Pausa y Continúa
          • 1.7 Hacer Más Con Menos
        • 2 El Líder
          • 2.1 Invierte
          • 2.2 Gánatelo
          • 2.3 Sé claro
          • 2.4 Lee la Sala
          • 2.5 Fuerza de Tarea vs Propietario
          • 2.6 El Conocimiento en la Sala
          • 2.7 El Perfeccionista
        • 3 El Propietario
          • 3.1 El Momento
          • 3.2 La Ventana
          • 3.3 Amplía tu Responsabilidad
          • 3.4 Deserción
          • 3.5 El Juego Largo
          • 3.6 Pausa
          • 3.7 Equilibrio
          • 3.8 Diversidad
        • 4 El Visionario
          • 4.1 El Tiempo Avanza Rápido
          • 4.2 La Idea Detrás de la Idea
          • 4.3 Automatiza
          • 4.4 Piensa en Grande
          • 4.5 Construye para Durar
          • 4.6 Gana y Multiplica
          • 4.7 Invierte por Adquisición
          • 4.8 Devuelve el Favor
        • 0 El Candidato
          • 0.1 Decidir
          • 0.2 Investigar
          • 0.3 Preparar
          • 0.4 Sé Disciplinado
          • 0.5 Aplica
          • 0.6 Convence
          • 0.7 Supera
      • FR | Voici Comment Penser
        • 1 L’Individu
          • 1.1 Utilise ta Boussole Morale
          • 1.2 Prédire
          • 1.3 Prends-en la Responsabilité
          • 1.4 Vise Haut
          • 1.5 Travaille Dur
          • 1.6 Pause et Continue
          • 1.7 Faire Plus Avec Moins
        • 2 Le Leader
          • 2.1 Investis
          • 2.2 Mérite-le
          • 2.3 Sois Clair
          • 2.4 Lis la Salle
          • 2.5 Force de Travail vs Propriétaire
          • 2.6 La Connaissance dans la Salle
          • 2.7 Le Perfectionniste
        • 3 Le Propriétaire
          • 3.1 Le Moment
          • 3.2 La Fenêtre
          • 3.3 Élargis ta Responsabilité
          • 3.4 Attrition (FR)
          • 3.5 Le Jeu Long
          • 3.6 Pause (FR)
          • 3.7 Équilibre
          • 3.8 Diversité
        • 4 Le Visionnaire
          • 4.1 Le Temps Avance Vite
          • 4.2 L'Idée Derrière l'Idée
          • 4.3 Automatise
          • 4.4 Pense Grand
          • 4.5 Construire pour Durer
          • 4.6 Gagne et Compose
          • 4.7 Investis par Acquisition
          • 4.8 Rends la Pareille
        • 0 Le Candidat
          • 0.1 Décider
          • 0.2 Rechercher
          • 0.3 Préparer
          • 0.4 Soyez Discipliné
          • 0.5 Postulez
          • 0.6 Convainquez
          • 0.7 Passez
      • PT | Aqui é Como Pensar
        • 1 O Indivíduo
          • 1.1 Usa a Tua Bússola Moral
          • 1.2 Prevê
          • 1.3 Torna-o Teu
          • 1.4 Aponta Alto
          • 1.5 Trabalha Arduamente
          • 1.6 Pausa e Continua
          • 1.7 Faz Mais Com Menos
        • 2 O Líder
          • 2.1 Investe
          • 2.2 Mereça-o
          • 2.3 Sê Claro
          • 2.4 Lê a Sala
          • 2.5 Força-Tarefa vs Proprietário
          • 2.6 O Conhecimento na Sala
          • 2.7 O Perfeccionista
        • 3 O Proprietário
          • 3.1 O Momento
          • 3.2 A Janela
          • 3.3 Alarga a tua Responsabilidade
          • 3.4 Atrito
          • 3.5 O Jogo Longo
          • 3.6 Pausa (PT)
          • 3.7 Equilíbrio (PT)
          • 3.8 Diversidade
        • 4 O Visionário
          • 4.1 O Tempo Avança Rápido
          • 4.2 A Ideia por Trás da Ideia
          • 4.3 Automatiza (PT)
          • 4.4 Pensa Grande
          • 4.5 Construir para Durar
          • 4.6 Ganha e Multiplica
          • 4.7 Investe por Aquisição
          • 4.8 Retribui
        • 0 O Candidato
          • 0.1 Decidir (PT)
          • 0.2 Pesquisar
          • 0.3 Preparar (PT)
          • 0.4 Sê Disciplinado
          • 0.5 Candidate-se
          • 0.6 Convença
          • 0.7 Passa
      • RU | Вот как думать
        • 1 Индивидуум
          • 1.1 Используй свой Моральный Компас
          • 1.2 Предсказывай
          • 1.3 Возьми на Себя
          • 1.4 Целься Выше
          • 1.5 Работай Усердно
          • 1.6 Пауза и Продолжение
          • 1.7 Делай Больше С Меньшим
        • 2 Лидер
          • 2.1 Инвестируй
          • 2.2 Заслужи это
          • 2.3 Будь Ясным
          • 2.4 Читай Зал
          • 2.5 Рабочая Группа vs Владелец
          • 2.6 Знание в Зале
          • 2.7 Перфекционист
        • 3 Владелец
          • 3.1 Момент
          • 3.2 Окно
          • 3.3 Расширь свою Ответственность
          • 3.4 Текучесть Kадров
          • 3.5 Долгая Игра
          • 3.6 Пауза
          • 3.7 Баланс
          • 3.8 Разнообразие
        • 4 Визионер
          • 4.1 Время Движется Быстро
          • 4.2 Идея за Идеей
          • 4.3 Автоматизируй
          • 4.4 Думай Масштабно
          • 4.5 Строй на Долгое Время
          • 4.6 Зарабатывай и Умножай
          • 4.7 Инвестируй через Приобретение
          • 4.8 Передай Дальше
        • 0 Кандидат
          • 0.1 Решить
          • 0.2 Исследовать
          • 0.3 Подготовиться
          • 0.4 Будь Дисциплинированным
          • 0.5 Откликайтесь
          • 0.6 Убеждайте
          • 0.7 Пройдите
    • STORIES
      • EN | The CEO
        • CHAPTER 0. Prologue
        • CHAPTER 1. Day One
        • CHAPTER 2. The Room
        • CHAPTER 3. The Pressure
        • CHAPTER 4. The Presentation
        • CHAPTER 5. The Contract
        • CHAPTER 6. The Transfer
        • CHAPTER 7. The Script
        • CHAPTER 8. The Distance
        • CHAPTER 9. The Customer Who Knows More
        • CHAPTER 10. The Knowledge That Left
        • CHAPTER 11. The Culture Nobody Transferred
        • CHAPTER 12. The Friend
        • CHAPTER 13. The Invisible Wall
        • CHAPTER 14. The Manager Who Performs Upward
        • Coming Soon
      • ES | El CEO
        • CAPÍTULO 0. Prólogo
        • CAPÍTULO 1. El Primer Día
        • CAPÍTULO 2. La Sala
        • CAPÍTULO 3. La Presión
        • CAPÍTULO 4. La Presentación
        • CAPÍTULO 5. El Contrato
        • CAPÍTULO 6. La Transferencia
        • CAPÍTULO 7. El Guión
        • CAPÍTULO 8. La Distancia
        • CAPÍTULO 9. La Clienta Que Sabe Más
        • CAPÍTULO 10. El Conocimiento Que Se Fue
        • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
        • Próximamente
      • FR | Le CEO
        • CHAPITRE 0. Prologue
        • CHAPITRE 1. Jour Un
        • CHAPITRE 2. La Salle
        • CHAPITRE 3. La Pression
        • CHAPITRE 4. La Présentation
        • CHAPITRE 5. Le Contrat
        • CHAPITRE 6. Le Transfert
        • CHAPITRE 7. Le Script
        • CHAPITRE 8. La Distance
        • CHAPITRE 9. La Cliente Qui En Sait Plus
        • CHAPITRE 10. Le Savoir Qui Est Parti
        • CHAPITRE 11. La Culture Que Personne N'a Transférée
        • Bientôt Disponible
      • PT | O CEO
        • CAPÍTULO 0. Prólogo
        • CAPÍTULO 1. Dia Um
        • CAPÍTULO 2. A Sala
        • CAPÍTULO 3. A Pressão
        • CAPÍTULO 4. A Apresentação
        • CAPÍTULO 5. O Contrato
        • CAPÍTULO 6. A Transferência
        • CAPÍTULO 7. O Guião
        • CAPÍTULO 8. A Distância
        • CAPÍTULO 9. A Cliente Que Sabe Mais
        • CAPÍTULO 10. O Conhecimento Que Partiu
        • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
        • Em Breve
      • RU | ГД
        • ГЛАВА 0. ПРОЛОГ
        • ГЛАВА 1. День первый
        • ГЛАВА 2. Комната
        • ГЛАВА 3. Давление
        • ГЛАВА 4. Презентация
        • ГЛАВА 5. Контракт
        • ГЛАВА 6. Перевод
        • ГЛАВА 7. Сценарий
        • ГЛАВА 8. Дистанция
        • ГЛАВА 9. Клиент, который знает больше
        • ГЛАВА 10. Знание, которое ушло
        • ГЛАВА 11. Культура, которую никто не передал
        • Скоро будет доступно

PROCESS

Aqui é Como Construir

Design

Sub

DISCIPLINA 8
Subprocessos

Cortar | Situar | Função | Combinar

Cortar
Tão poucos subprocessos quanto possível, cada um a merecer o seu lugar

Situar
Cada um na posição de que o todo precisa

Função
Cada um responde por uma peça do resultado do todo

Combinar
Unidos de forma limpa e mantidos limpos, os subprocessos são o processo


DISCIPLINA 8
Subprocessos

As partes fazem o todo
Não mais subprocessos do que o trabalho exige
Cada subprocesso é o todo de alguém
Um exemplo real
Subprocessos

←

→

As partes fazem o todo

Este volume começou com uma afirmação: um processo grande é feito de subprocessos, e o trabalho do designer é cortá-lo nas partes certas, cada uma inteira, cada uma no seu lugar, cada uma a fazer a sua parte, e voltar a combiná-las num processo que se aguente. As disciplinas desde então desmontaram essa afirmação e examinaram cada peça à vez. O que é um subprocesso. Quando uma peça deve sê-lo e quando deve ficar como passo. Como cortá-lo limpo. Onde situá-lo. Por que resultado responde. Como uni-lo aos seus vizinhos. E como mantê-lo limpo enquanto o trabalho deriva. Aqui, no fim, voltam a juntar-se.

Vistas em conjunto, não são sete competências separadas. São faces de um só ato: fazer partes que somem um processo que se aguente. As partes são os subprocessos de que trata este volume, juntamente com os passos que, com razão, continuam a ser passos. Um corte limpo importa porque uma parte com bordas irregulares não pode ser situada, nem possuída, nem unida. Um bom lugar importa porque uma parte limpa na posição errada continua a interromper o fluxo. Um resultado claro importa porque é nele que os vizinhos confiam e é dele que o todo é feito. Uma costura fina importa porque deixa cada parte livre enquanto o todo continua unido. E vigiar a deriva importa porque tudo isso era verdade para o trabalho tal como era, e o trabalho não para de se mover.

Por isso nenhuma parte é boa por si só. Um subprocesso é bom para o todo que serve: cortado onde o todo se divide naturalmente, situado onde o todo precisa dele, respondendo por uma peça do resultado do todo, unido de modo que o todo se aguente. Julga uma parte por si mesma, e um subprocesso bem desenhado pode continuar a ser o errado. Julga-a pelo que faz pelo todo, e cada disciplina deste volume torna-se uma pergunta que lhe podes fazer: está limpa, está no lugar certo, o seu resultado encaixa, a sua costura leva só esse resultado, continua fiel ao trabalho?

O padrão mais elevado possível é ver todas as disciplinas deste volume como um só ato, fazer partes que se combinem num processo que se aguente, e julgar cada subprocesso não por si mesmo mas pelo que faz pelo todo: cortado limpo, situado pela necessidade, respondendo pela sua peça do resultado, unido por uma costura fina e mantido fiel à medida que o trabalho se move.

Conclusão chave: As disciplinas do volume (o que é um subprocesso, sub ou passo, cortar limpo, situar, a função, as costuras internas, a deriva) não são competências separadas mas faces de um só ato: fazer partes que somem um processo que se aguente. As partes são os subprocessos, juntamente com os passos que, com razão, continuam a ser passos. Cada disciplina importa por causa do todo: um corte limpo pode ser situado e possuído, um bom lugar mantém o fluxo, um resultado claro é aquilo em que os vizinhos confiam, uma costura fina mantém as partes livres e o todo unido, e vigiar a deriva mantém tudo fiel. Nenhuma parte é boa por si só; julga cada uma pelo que faz pelo todo.

Cada disciplina deste volume é um só ato: fazer partes que se combinem num processo que se aguente; julga cada subprocesso pelo que faz pelo todo.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Sub · Disciplina 8: Subprocessos · Secção: As partes fazem o todo

MarvinPro | Outubro 2026

marvinpro.com

Não mais subprocessos do que o trabalho exige

Se as partes existem para o todo, também importa quantas são. E, por defeito, menos. Cada subprocesso que nomeias tem um custo: um nome a manter fiel, um resultado a enunciar, um proprietário a atribuir-lhe, costuras a projetar dos dois lados, um lugar no mapa que todos os que fazem correr o processo têm de trazer na cabeça. Um processo com mais subprocessos do que o seu trabalho exige paga esses custos a troco de nada e, pior, as partes a mais enterram a forma real do trabalho sob divisões que não significam nada.

Por isso começa com tão poucos subprocessos quanto possível, e acrescenta um só quando uma peça o merecer. Os sinais são os da segunda disciplina: a peça tem um fluxo real de vários atos; pode falhar a meio e a forma de tratar essa falha importa; é possuída ou executada por uma equipa distinta dentro do processo; é reutilizada em mais de um sítio; ou vale a pena trabalhar nela, possuí-la ou isolá-la à parte. Se uma peça não mostrar nenhum destes sinais, fica como passo, por mais importante que pareça. O ónus da prova cabe a quem acrescenta uma parte, não a quem a deixa de fora.

Isso não faz de ficar aquém uma virtude. Um fluxo real deixado dentro de um só passo continua a ser uma estrutura escondida, com as suas falhas por projetar, à espera de surgir como algo que ninguém previu. O objetivo não é o menor número possível mas o número honesto: todos os subprocessos que o trabalho realmente tem, e nem um a mais. E como o trabalho se move, esse número também. A deriva acrescenta partes em silêncio, e um design que em tempos tinha o número certo pode, anos depois, carregar várias que já não merecem o seu lugar. Por isso a contagem verifica-se como tudo o resto, e as fusões e as retiradas fazem tanto parte do bom design como as divisões.

O padrão mais elevado possível é manter o número de subprocessos tão baixo quanto o trabalho permitir, começando com tão poucos quanto possível e acrescentando uma parte só quando uma peça a merecer pelos sinais (um fluxo real, uma falha que importa, um proprietário distinto, a reutilização, ou a necessidade de trabalhar nela isoladamente), nunca deixando um fluxo real escondido num passo, e verificando a contagem à medida que o trabalho se move para fundir ou retirar as partes que já não merecem o seu lugar.

Conclusão chave: Cada subprocesso tem um custo: um nome, um resultado, um proprietário, costuras dos dois lados, um lugar no mapa de todos. As partes a mais pagam esse custo a troco de nada e enterram a forma real do trabalho. Por isso, por defeito, menos: começa com tão poucos subprocessos quanto possível, e acrescenta um só quando uma peça o merecer pelos sinais da segunda disciplina (um fluxo real, uma falha que importa, um proprietário distinto, a reutilização, a necessidade de trabalhar nela isoladamente). O ónus da prova cabe a quem acrescenta uma parte. Ficar aquém continua a ser uma falha (um fluxo real escondido num passo), por isso o objetivo é o número honesto, verificado de novo à medida que o trabalho deriva.

Começa com tão poucos subprocessos quanto possível, e acrescenta um só quando uma peça merecer o seu lugar; o ónus da prova cabe a quem acrescenta uma parte.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Sub · Disciplina 8: Subprocessos · Secção: Não mais subprocessos do que o trabalho exige

MarvinPro | Outubro 2026

marvinpro.com

Cada subprocesso é o todo de alguém

Há mais uma maneira de olhar para um subprocesso, e é a mesma com que este volume abriu. Para quem projeta o processo maior, um subprocesso é uma parte: um nome, um lugar, um resultado, duas costuras. Mas um subprocesso tem, quase sempre, um proprietário: uma equipa ou um departamento que faz esse trabalho todos os dias. E de onde eles estão, não é de todo uma parte. É todo o seu trabalho, de ponta a ponta. Tem o seu próprio início, onde o trabalho chega da parte anterior; o seu próprio fim, onde o seu resultado passa à parte seguinte; o seu próprio resultado por que responder; e, muitas vezes, as suas próprias partes lá dentro. Para a equipa que é sua proprietária, um subprocesso é o seu trabalho de ponta a ponta.

É a relatividade que este livro encontrou vezes sem conta: o processo central da empresa revelou-se, de um enquadramento mais amplo, um processo de suporte, e o processo central de um departamento um subprocesso do processo central da empresa. O mesmo vale até ao fundo. Por isso o proprietário de um subprocesso projeta-o como um todo, com tudo o que este volume ensina: corta-o nas suas próprias partes, situa-as, dá a cada uma um resultado, une-as por costuras limpas e vigia a sua deriva. Entretanto, quem projeta o processo maior vê uma parte e confia numa só coisa: o seu resultado. Os dois olhares são verdadeiros, e nenhum está completo sem o outro.

O processo aguenta-se quando os dois se mantêm. O proprietário garante o resultado de que o processo maior depende, e é livre de mudar qualquer coisa lá dentro desde que esse resultado se mantenha: a liberdade que a quinta disciplina descrevia. Quem projeta de cima mantém as costuras limpas e deixa o interior ao seu proprietário, e é isso que torna essa liberdade real. Quando o proprietário esquece o todo à sua volta, a sua parte começa a afastar-se daquilo de que as vizinhas precisam. Quando quem projeta de cima esquece que cada parte é o todo de alguém, começa a meter-se dentro de partes que devia deixar em paz. Mantém os dois, e as mesmas disciplinas funcionam em todos os níveis, dentro de cada parte e à volta de cada todo, até aos próprios passos, onde começa o volume seguinte deste livro.

O padrão mais elevado possível é ver cada subprocesso ao mesmo tempo como uma parte do processo maior e como um todo para a equipa que é sua proprietária, deixando o proprietário projetá-lo com todas as disciplinas deste volume e responder pelo seu resultado, enquanto quem projeta de cima confia só nesse resultado e mantém as costuras limpas, para que as mesmas disciplinas se aguentem em todos os níveis do processo.

Conclusão chave: Para quem projeta de cima, um subprocesso é uma parte; para a equipa que é sua proprietária, é todo o seu trabalho, de ponta a ponta, com o seu próprio início, fim, resultado e, muitas vezes, as suas próprias partes. É de novo a relatividade do livro: o processo central da empresa revelou-se, de um enquadramento mais amplo, um processo de suporte, e o processo central de um departamento um subprocesso do processo central da empresa. Por isso o proprietário projeta-o como um todo, com todas as disciplinas deste volume, e responde pelo seu resultado; quem projeta de cima confia só nesse resultado e mantém as costuras limpas. Os dois olhares são verdadeiros, e o processo aguenta-se quando os dois se mantêm.

Cada subprocesso é uma parte para quem projeta de cima e um todo para a equipa que é sua proprietária; o processo aguenta-se quando os dois olhares se mantêm.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Sub · Disciplina 8: Subprocessos · Secção: Cada subprocesso é o todo de alguém

MarvinPro | Outubro 2026

marvinpro.com

Um exemplo real

Volta a ativar uma última vez, e olha para a liquidação do pagamento dos dois lados. De ativar, é uma parte. Tem um nome e um resultado: um pagamento liquidado, ou recusado e o cliente avisado. Vem primeiro, porque nada mais na ativação pode começar sem ela. A sua costura com a abertura da conta (desde a sétima disciplina, uma só parte com o registo do direito) leva só esse resultado, com o cliente e o plano de que a conta precisa, e tem um caminho de volta definido se a conta não puder ser aberta. É tudo o que ativar precisa de saber sobre ela, e tudo o que deve saber.

Agora põe-te no lugar da equipa de pagamentos. Para ela, a liquidação do pagamento não é uma parte; é o seu todo. Começa quando ativar lhe entrega uma subscrição para liquidar, e termina quando ela devolve esse único resultado. Lá dentro tem as suas próprias partes: desde a divisão da sétima disciplina, os pagamentos com cartão e com carteira, as transferências bancárias e os pagamentos em prestações, cada um com o seu próprio resultado, unidos pelas suas próprias costuras, e recorrendo ao processo de finanças para a cobrança como uma conexão, não como uma parte. A equipa projeta essas partes com exatamente as mesmas disciplinas que este volume ensinou para ativar. E mantém honesta a sua contagem: o cartão e a carteira ficam juntos, porque são liquidados e falham da mesma maneira, e separá-los acrescentaria uma parte que não merece o seu lugar.

Os dois olhares aguentam-se ao mesmo tempo. A equipa de pagamentos pode mudar a forma como funcionam as repetições, acrescentar um novo meio de pagamento na articulação certa ou fundir duas das suas partes sem pedir licença a ativar, porque ativar só confia no resultado. E ativar pode ser reprojetado à volta da liquidação sem que ninguém toque no seu interior. Recua mais um nível, e volta a ser verdade: ativar é, por sua vez, uma das quatro partes do processo central da subscrição, e o processo central da subscrição uma parte da empresa. Em cada nível, as partes são o todo de alguém, e o todo é feito de partes. É isso que significa um processo ser feito de subprocessos.

A liquidação do pagamento é uma parte de ativar, que responde por um único resultado, e ao mesmo tempo o todo da equipa de pagamentos, com as suas próprias partes, costuras e deriva; os dois olhares aguentam-se, em cada nível do processo.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Sub · Disciplina 8: Subprocessos · Um exemplo real

MarvinPro | Outubro 2026

marvinpro.com

Subprocessos

As disciplinas deste volume são faces de um só ato: fazer partes que se combinem num processo que se aguente. O que é um subprocesso, sub ou passo, cortar limpo, situar, a função, as costuras internas e a deriva respondem cada uma a uma pergunta sobre uma parte, e cada resposta é julgada pelo todo. As partes são os subprocessos, juntamente com os passos que, com razão, continuam a ser passos, e nenhuma parte é boa por si só: é boa para o todo que serve.

O número de partes também importa, e, por defeito, menos. Cada subprocesso tem um custo: um nome, um resultado, um proprietário, costuras, um lugar no mapa de todos. Por isso começa com tão poucos quanto possível, e acrescenta um só quando uma peça o merecer pelos sinais (um fluxo real, uma falha que importa, um proprietário distinto, a reutilização, a necessidade de trabalhar nela isoladamente). O ónus da prova cabe a quem acrescenta uma parte. Ficar aquém continua a ser uma falha, mas o objetivo é o número honesto: todos os subprocessos que o trabalho realmente tem, e nem um a mais, verificado de novo à medida que o trabalho deriva.

E cada subprocesso é o todo de alguém. Para quem projeta de cima, é uma parte com um resultado; para a equipa que é sua proprietária, é todo o seu trabalho, de ponta a ponta, com as suas próprias partes lá dentro. O proprietário projeta-o com todas as disciplinas deste volume e responde pelo seu resultado; quem projeta de cima confia só nesse resultado e mantém as costuras limpas. Os dois olhares são verdadeiros, e o processo aguenta-se quando os dois se mantêm, em todos os níveis, da empresa até aos passos.

A disciplina deste volume, tomada no seu conjunto, é portanto esta: constrói um processo grande com subprocessos, tão poucos quanto o trabalho permitir e cada um a merecer o seu lugar; corta cada um limpo, situa-o pela necessidade, dá-lhe um resultado por que responder e une-o por costuras que levem só esse resultado; vigia as partes à medida que o trabalho se move, e volta a cortar quando os sinais forem claros; e lembra-te de que cada parte é o todo de alguém. Desta forma, um processo grande demais para abarcar de uma só vez torna-se um conjunto de partes que qualquer pessoa consegue encontrar, possuir, mudar e em que pode confiar, e que juntas se aguentam como um só processo.

Um processo grande é feito de subprocessos: tão poucos quanto o trabalho permitir, cada um cortado limpo, situado, respondendo pelo seu resultado e unido por costuras limpas, e cada um o todo de alguém.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Sub · Disciplina 8: Subprocessos · Resultado do Capítulo

MarvinPro | Outubro 2026

marvinpro.com

←

→

Pensa Simples.

info@marvinpro.com | feedback@marvinpro.com | support@marvinpro.com | mpac@marvinpro.com | collab@marvinpro.com | artwork@marvinpro.com 

© COPYRIGHT 1990-2026 MarvinPro  All rights reserved. Content is free to read. You are welcome to share quotes or the writer's thoughts from MarvinPro, as long as you post the complete attribution exactly as it appears in the text, including the quote, author name, year and marvinpro.com. Copying or reproducing other parts, full sections or chapters without permission is not permitted.

© COPYRIGHT 1990-2026 MarvinPro  Todos los derechos reservados. El contenido es libre de leer. Eres bienvenido a compartir citas o las reflexiones del autor de MarvinPro, siempre que publiques la atribución completa exactamente como aparece en el texto, incluyendo la cita, el nombre del autor, el año y marvinpro.com. No está permitido copiar ni reproducir otras partes, secciones completas o capítulos sin permiso.

© COPYRIGHT 1990-2026 MarvinPro  Tous droits réservés. Le contenu est libre de lecture. Vous êtes invité à partager des citations ou les réflexions de l'auteur de MarvinPro, à condition de publier l'attribution complète exactement telle qu'elle apparaît dans le texte, y compris la citation, le nom de l'auteur, l'année et marvinpro.com. Copier ou reproduire d'autres parties, des sections entières ou des chapitres sans autorisation n'est pas permis.

© COPYRIGHT 1990-2026 MarvinPro  Todos os direitos reservados. O conteúdo é livre de ler. És bem-vindo a partilhar citações ou as reflexões do autor de MarvinPro, desde que publiques a atribuição completa exatamente como aparece no texto, incluindo a citação, o nome do autor, o ano e marvinpro.com. Copiar ou reproduzir outras partes, secções completas ou capítulos sem permissão não é permitido.

© COPYRIGHT 1990-2026 MarvinPro  Все права защищены. Содержание можно свободно читать. Вы можете делиться цитатами или размышлениями автора из MarvinPro при условии, что вы публикуете полную атрибуцию точно так, как она появляется в тексте, включая цитату, имя автора, год и marvinpro.com. Копирование или воспроизведение других частей, целых разделов или глав без разрешения не допускается.

Report abuse
Page details
Page updated
Report abuse