Search this site
Embedded Files
  • LEADERSHIP
    • EN | Here is How to Think
      • 1 The Individual
        • 1.1 Use Your Moral Compass
        • 1.2 Predict
        • 1.3 Own It
        • 1.4 Aim High
        • 1.5 Work Hard
        • 1.6 Pause and Continue
        • 1.7 Do More With Less
      • 2 The Leader
        • 2.1 Invest
        • 2.2 Earn It
        • 2.3 Be Clear
        • 2.4 Read the Room
        • 2.5 Task Force vs Owner
        • 2.6 Knowledge in the Room
        • 2.7 The Perfectionist
      • 3 The Owner
        • 3.1 Timing
        • 3.2 The Window
        • 3.3 Broaden your Responsibility
        • 3.4 Attrition
        • 3.5 The Long Game
        • 3.6 Pause
        • 3.7 Balance
        • 3.8 Diversity (Bonus)
      • 4 The Visionary
        • 4.1 Time moves fast
        • 4.2 The Idea Behind the Idea
        • 4.3 Automate
        • 4.4 Think Big
        • 4.5 Build to Last
        • 4.6 Earn and Compound
        • 4.7 Invest by Acquisition
        • 4.8 Pay it Forward
      • 0 The Candidate
        • 0.1 Decide
        • 0.2 Research
        • 0.3 Prepare
        • 0.4 Be Disciplined
        • 0.5 Apply
        • 0.6 Convince
        • 0.7 Pass
    • ES | Aquí es Cómo Pensar
      • 1 El Individuo
        • 1.1 Usa tu Brújula Moral
        • 1.2 Predice
        • 1.3 Hazlo Tuyo
        • 1.4 Apunta Alto
        • 1.5 Trabaja Duro
        • 1.6 Pausa y Continúa
        • 1.7 Hacer Más Con Menos
      • 2 El Líder
        • 2.1 Invierte
        • 2.2 Gánatelo
        • 2.3 Sé claro
        • 2.4 Lee la Sala
        • 2.5 Fuerza de Tarea vs Propietario
        • 2.6 El Conocimiento en la Sala
        • 2.7 El Perfeccionista
      • 3 El Propietario
        • 3.1 El Momento
        • 3.2 La Ventana
        • 3.3 Amplía tu Responsabilidad
        • 3.4 Deserción
        • 3.5 El Juego Largo
        • 3.6 Pausa
        • 3.7 Equilibrio
        • 3.8 Diversidad
      • 4 El Visionario
        • 4.1 El Tiempo Avanza Rápido
        • 4.2 La Idea Detrás de la Idea
        • 4.3 Automatiza
        • 4.4 Piensa en Grande
        • 4.5 Construye para Durar
        • 4.6 Gana y Multiplica
        • 4.7 Invierte por Adquisición
        • 4.8 Devuelve el Favor
      • 0 El Candidato
        • 0.1 Decidir
        • 0.2 Investigar
        • 0.3 Preparar
        • 0.4 Sé Disciplinado
        • 0.5 Aplica
        • 0.6 Convence
        • 0.7 Supera
    • FR | Voici Comment Penser
      • 1 L’Individu
        • 1.1 Utilise ta Boussole Morale
        • 1.2 Prédire
        • 1.3 Prends-en la Responsabilité
        • 1.4 Vise Haut
        • 1.5 Travaille Dur
        • 1.6 Pause et Continue
        • 1.7 Faire Plus Avec Moins
      • 2 Le Leader
        • 2.1 Investis
        • 2.2 Mérite-le
        • 2.3 Sois Clair
        • 2.4 Lis la Salle
        • 2.5 Force de Travail vs Propriétaire
        • 2.6 La Connaissance dans la Salle
        • 2.7 Le Perfectionniste
      • 3 Le Propriétaire
        • 3.1 Le Moment
        • 3.2 La Fenêtre
        • 3.3 Élargis ta Responsabilité
        • 3.4 Attrition (FR)
        • 3.5 Le Jeu Long
        • 3.6 Pause (FR)
        • 3.7 Équilibre
        • 3.8 Diversité
      • 4 Le Visionnaire
        • 4.1 Le Temps Avance Vite
        • 4.2 L'Idée Derrière l'Idée
        • 4.3 Automatise
        • 4.4 Pense Grand
        • 4.5 Construire pour Durer
        • 4.6 Gagne et Compose
        • 4.7 Investis par Acquisition
        • 4.8 Rends la Pareille
      • 0 Le Candidat
        • 0.1 Décider
        • 0.2 Rechercher
        • 0.3 Préparer
        • 0.4 Soyez Discipliné
        • 0.5 Postulez
        • 0.6 Convainquez
        • 0.7 Passez
    • PT | Aqui é Como Pensar
      • 1 O Indivíduo
        • 1.1 Usa a Tua Bússola Moral
        • 1.2 Prevê
        • 1.3 Torna-o Teu
        • 1.4 Aponta Alto
        • 1.5 Trabalha Arduamente
        • 1.6 Pausa e Continua
        • 1.7 Faz Mais Com Menos
      • 2 O Líder
        • 2.1 Investe
        • 2.2 Mereça-o
        • 2.3 Sê Claro
        • 2.4 Lê a Sala
        • 2.5 Força-Tarefa vs Proprietário
        • 2.6 O Conhecimento na Sala
        • 2.7 O Perfeccionista
      • 3 O Proprietário
        • 3.1 O Momento
        • 3.2 A Janela
        • 3.3 Alarga a tua Responsabilidade
        • 3.4 Atrito
        • 3.5 O Jogo Longo
        • 3.6 Pausa (PT)
        • 3.7 Equilíbrio (PT)
        • 3.8 Diversidade
      • 4 O Visionário
        • 4.1 O Tempo Avança Rápido
        • 4.2 A Ideia por Trás da Ideia
        • 4.3 Automatiza (PT)
        • 4.4 Pensa Grande
        • 4.5 Construir para Durar
        • 4.6 Ganha e Multiplica
        • 4.7 Investe por Aquisição
        • 4.8 Retribui
      • 0 O Candidato
        • 0.1 Decidir (PT)
        • 0.2 Pesquisar
        • 0.3 Preparar (PT)
        • 0.4 Sê Disciplinado
        • 0.5 Candidate-se
        • 0.6 Convença
        • 0.7 Passa
    • RU | Вот как думать
      • 1 Индивидуум
        • 1.1 Используй свой Моральный Компас
        • 1.2 Предсказывай
        • 1.3 Возьми на Себя
        • 1.4 Целься Выше
        • 1.5 Работай Усердно
        • 1.6 Пауза и Продолжение
        • 1.7 Делай Больше С Меньшим
      • 2 Лидер
        • 2.1 Инвестируй
        • 2.2 Заслужи это
        • 2.3 Будь Ясным
        • 2.4 Читай Зал
        • 2.5 Рабочая Группа vs Владелец
        • 2.6 Знание в Зале
        • 2.7 Перфекционист
      • 3 Владелец
        • 3.1 Момент
        • 3.2 Окно
        • 3.3 Расширь свою Ответственность
        • 3.4 Текучесть Kадров
        • 3.5 Долгая Игра
        • 3.6 Пауза
        • 3.7 Баланс
        • 3.8 Разнообразие
      • 4 Визионер
        • 4.1 Время Движется Быстро
        • 4.2 Идея за Идеей
        • 4.3 Автоматизируй
        • 4.4 Думай Масштабно
        • 4.5 Строй на Долгое Время
        • 4.6 Зарабатывай и Умножай
        • 4.7 Инвестируй через Приобретение
        • 4.8 Передай Дальше
      • 0 Кандидат
        • 0.1 Решить
        • 0.2 Исследовать
        • 0.3 Подготовиться
        • 0.4 Будь Дисциплинированным
        • 0.5 Откликайтесь
        • 0.6 Убеждайте
        • 0.7 Пройдите
  • PROCESS
    • EN | Here is How to Build
      • EN | Design
        • EN | 1.1 Principles
          • 1.1.1 Did you Know?
          • 1.1.2 See
          • 1.1.3 Design
          • 1.1.4 Sign
          • 1.1.5 Prepare
          • 1.1.6 Run
          • 1.1.7 Support
        • EN | 1.2 Rules
          • 1.2.1.A Rule
          • 1.2.2 What
          • 1.2.3 How
          • 1.2.4 When
          • 1.2.5 Why
          • 1.2.6 Who
          • 1.2.7 A Sound Rule
          • 1.2.8 The Whole
      • EN | Operate
      • EN | Change
      • EN | Control
      • EN | Govern
      • EN | Diagnose
      • EN | Master
    • ES | Aquí es Cómo Construir
      • ES | Diseño
        • ES | 1.1 Principios
          • 1.1.1 ¿Sabías Que?
          • 1.1.2 Ver
          • 1.1.3 Diseñar
          • 1.1.4 Firmar
          • 1.1.5 Preparar
          • 1.1.6 Ejecutar
          • 1.1.7 Apoyar
        • ES | 1.2 Reglas
          • 1.2.1 Una Regla
          • 1.2.2 Qué
          • 1.2.3 Cómo
          • 1.2.4 Cuándo
          • 1.2.5 Por Qué
          • 1.2.6 Quién
          • 1.2.7 Una Regla Sólida
          • 1.2.8 El Todo
    • FR | Ici, c'est Comment Construire
      • FR | Conception
        • FR | 1.1 Principes
          • 1.1.1 Le saviez-vous ?
          • 1.1.2 Voir
          • 1.1.3 Concevoir
          • 1.1.4 Signer
          • 1.1.5 Préparer
          • 1.1.6 Exécuter
          • 1.1.7 Soutenir
        • FR | 1.2 Règles
          • 1.2.1 Une Règle
          • 1.2.2 Quoi
          • 1.2.3 Comment
          • 1.2.4 Quand
          • 1.2.5 Pourquoi
          • 1.2.6 Qui
          • 1.2.7 Une Règle Solide
    • PT | Aqui é Como Construir
      • PT | Design
        • PT | 1.1 Princípios
          • 1.1.1 Sabias?
          • 1.1.2 Ver (PT)
          • 1.1.3 Design (PT)
          • 1.1.4 Assinar
          • 1.1.5 Preparar (PT)
          • 1.1.6 Executar
          • 1.1.7 Apoiar
        • PT | 1.2 Regras
          • 1.2.1 Uma Regra
          • 1.2.2 O quê
          • 1.2.3 Como
          • 1.2.4 Quando
          • 1.2.5 Por Que
          • 1.2.6 Quem
          • 1.2.7 Uma Regra Sólida
    • RU | Вот Как Строить
      • RU | Проектирование
        • RU | 1.1 Принципы
          • 1.1.1 А вы знали?
          • 1.1.2 Видеть
          • 1.1.3 Проектировать
          • 1.1.4 Подписывать
          • 1.1.5 Подготавливать
          • 1.1.6 Запускать
          • 1.1.7 Поддерживать
        • RU | 1.2 Правила
          • 1.2.1 Правило
          • 1.2.2 Что
          • 1.2.3 Как
          • 1.2.4 Когда
          • 1.2.5 Почему
          • 1.2.6 Кто
          • 1.2.7 Прочное Правило
    • EN | Migration
      • CHAPTER 1. Why Processes Drive Transformation
      • CHAPTER 2. From Steps to System by MarvinPro
      • CHAPTER 3. Phases by MarvinPro
      • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
      • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
      • CHAPTER 6. What Makes Migration Successful by MarvinPro
    • EN | Migration S/4HANA Edition
      • 1. Why Processes Drive Transformation by MarvinPro
      • 2. Design Phase — Building for Scale by MarvinPro
      • 3. Core Functional Domains
      • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
      • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
      • 6. What Makes Migration Successful by MarvinPro
    • EN | Exceptions
      • 1. Why Exceptions Define by MarvinPro
      • 2. What Is an Exception
      • 3. Designing for Exceptions
      • 4. Operating Under Pressure
      • 5. Recovery and Stabilisation
      • 6. Learning from Exceptions
      • 7. The Exception-Ready Organisation
      • 8. The Future of Exception Handling by MarvinPro
    • PROCESSES COLLECTION
      • PROCESS Catalog
  • PROOF
    • 1 MarvinPro Showcase
      • MarvinPro Initiatives
    • 2 GDPRSave Showcase
      • GDPRSave Initiatives
    • 3 Confidential Showcase
      • Confidential Initiatives
    • 4 ArtnPro Showcase
      • ArtnPro Initiatives
  • KNOWLEDGE
  • STORIES
    • EN | The CEO
      • CHAPTER 0. Prologue
      • CHAPTER 1. Day One
      • CHAPTER 2. The Room
      • CHAPTER 3. The Pressure
      • CHAPTER 4. The Presentation
      • CHAPTER 5. The Contract
      • CHAPTER 6. The Transfer
      • CHAPTER 7. The Script
      • CHAPTER 8. The Distance
      • CHAPTER 9. The Customer Who Knows More
      • CHAPTER 10. The Knowledge That Left
      • CHAPTER 11. The Culture Nobody Transferred
      • CHAPTER 12. The Friend
      • CHAPTER 13. The Invisible Wall
      • CHAPTER 14. The Manager Who Performs Upward
      • Coming Soon
    • ES | El CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. El Primer Día
      • CAPÍTULO 2. La Sala
      • CAPÍTULO 3. La Presión
      • CAPÍTULO 4. La Presentación
      • CAPÍTULO 5. El Contrato
      • CAPÍTULO 6. La Transferencia
      • CAPÍTULO 7. El Guión
      • CAPÍTULO 8. La Distancia
      • CAPÍTULO 9. La Clienta Que Sabe Más
      • CAPÍTULO 10. El Conocimiento Que Se Fue
      • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
      • Próximamente
    • FR | Le CEO
      • CHAPITRE 0. Prologue
      • CHAPITRE 1. Jour Un
      • CHAPITRE 2. La Salle
      • CHAPITRE 3. La Pression
      • CHAPITRE 4. La Présentation
      • CHAPITRE 5. Le Contrat
      • CHAPITRE 6. Le Transfert
      • CHAPITRE 7. Le Script
      • CHAPITRE 8. La Distance
      • CHAPITRE 9. La Cliente Qui En Sait Plus
      • CHAPITRE 10. Le Savoir Qui Est Parti
      • CHAPITRE 11. La Culture Que Personne N'a Transférée
      • Bientôt Disponible
    • PT | O CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. Dia Um
      • CAPÍTULO 2. A Sala
      • CAPÍTULO 3. A Pressão
      • CAPÍTULO 4. A Apresentação
      • CAPÍTULO 5. O Contrato
      • CAPÍTULO 6. A Transferência
      • CAPÍTULO 7. O Guião
      • CAPÍTULO 8. A Distância
      • CAPÍTULO 9. A Cliente Que Sabe Mais
      • CAPÍTULO 10. O Conhecimento Que Partiu
      • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
      • Em Breve
    • RU | ГД
      • ГЛАВА 0. ПРОЛОГ
      • ГЛАВА 1. День первый
      • ГЛАВА 2. Комната
      • ГЛАВА 3. Давление
      • ГЛАВА 4. Презентация
      • ГЛАВА 5. Контракт
      • ГЛАВА 6. Перевод
      • ГЛАВА 7. Сценарий
      • ГЛАВА 8. Дистанция
      • ГЛАВА 9. Клиент, который знает больше
      • ГЛАВА 10. Знание, которое ушло
      • ГЛАВА 11. Культура, которую никто не передал
      • Скоро будет доступно
  • MPAC
  • ARTWORK
    • Leadership Art
    • The CEO Art
    • Quotes n Flower Tiles
    • Quotes n Mountain Tiles
 
  • LEADERSHIP
    • EN | Here is How to Think
      • 1 The Individual
        • 1.1 Use Your Moral Compass
        • 1.2 Predict
        • 1.3 Own It
        • 1.4 Aim High
        • 1.5 Work Hard
        • 1.6 Pause and Continue
        • 1.7 Do More With Less
      • 2 The Leader
        • 2.1 Invest
        • 2.2 Earn It
        • 2.3 Be Clear
        • 2.4 Read the Room
        • 2.5 Task Force vs Owner
        • 2.6 Knowledge in the Room
        • 2.7 The Perfectionist
      • 3 The Owner
        • 3.1 Timing
        • 3.2 The Window
        • 3.3 Broaden your Responsibility
        • 3.4 Attrition
        • 3.5 The Long Game
        • 3.6 Pause
        • 3.7 Balance
        • 3.8 Diversity (Bonus)
      • 4 The Visionary
        • 4.1 Time moves fast
        • 4.2 The Idea Behind the Idea
        • 4.3 Automate
        • 4.4 Think Big
        • 4.5 Build to Last
        • 4.6 Earn and Compound
        • 4.7 Invest by Acquisition
        • 4.8 Pay it Forward
      • 0 The Candidate
        • 0.1 Decide
        • 0.2 Research
        • 0.3 Prepare
        • 0.4 Be Disciplined
        • 0.5 Apply
        • 0.6 Convince
        • 0.7 Pass
    • ES | Aquí es Cómo Pensar
      • 1 El Individuo
        • 1.1 Usa tu Brújula Moral
        • 1.2 Predice
        • 1.3 Hazlo Tuyo
        • 1.4 Apunta Alto
        • 1.5 Trabaja Duro
        • 1.6 Pausa y Continúa
        • 1.7 Hacer Más Con Menos
      • 2 El Líder
        • 2.1 Invierte
        • 2.2 Gánatelo
        • 2.3 Sé claro
        • 2.4 Lee la Sala
        • 2.5 Fuerza de Tarea vs Propietario
        • 2.6 El Conocimiento en la Sala
        • 2.7 El Perfeccionista
      • 3 El Propietario
        • 3.1 El Momento
        • 3.2 La Ventana
        • 3.3 Amplía tu Responsabilidad
        • 3.4 Deserción
        • 3.5 El Juego Largo
        • 3.6 Pausa
        • 3.7 Equilibrio
        • 3.8 Diversidad
      • 4 El Visionario
        • 4.1 El Tiempo Avanza Rápido
        • 4.2 La Idea Detrás de la Idea
        • 4.3 Automatiza
        • 4.4 Piensa en Grande
        • 4.5 Construye para Durar
        • 4.6 Gana y Multiplica
        • 4.7 Invierte por Adquisición
        • 4.8 Devuelve el Favor
      • 0 El Candidato
        • 0.1 Decidir
        • 0.2 Investigar
        • 0.3 Preparar
        • 0.4 Sé Disciplinado
        • 0.5 Aplica
        • 0.6 Convence
        • 0.7 Supera
    • FR | Voici Comment Penser
      • 1 L’Individu
        • 1.1 Utilise ta Boussole Morale
        • 1.2 Prédire
        • 1.3 Prends-en la Responsabilité
        • 1.4 Vise Haut
        • 1.5 Travaille Dur
        • 1.6 Pause et Continue
        • 1.7 Faire Plus Avec Moins
      • 2 Le Leader
        • 2.1 Investis
        • 2.2 Mérite-le
        • 2.3 Sois Clair
        • 2.4 Lis la Salle
        • 2.5 Force de Travail vs Propriétaire
        • 2.6 La Connaissance dans la Salle
        • 2.7 Le Perfectionniste
      • 3 Le Propriétaire
        • 3.1 Le Moment
        • 3.2 La Fenêtre
        • 3.3 Élargis ta Responsabilité
        • 3.4 Attrition (FR)
        • 3.5 Le Jeu Long
        • 3.6 Pause (FR)
        • 3.7 Équilibre
        • 3.8 Diversité
      • 4 Le Visionnaire
        • 4.1 Le Temps Avance Vite
        • 4.2 L'Idée Derrière l'Idée
        • 4.3 Automatise
        • 4.4 Pense Grand
        • 4.5 Construire pour Durer
        • 4.6 Gagne et Compose
        • 4.7 Investis par Acquisition
        • 4.8 Rends la Pareille
      • 0 Le Candidat
        • 0.1 Décider
        • 0.2 Rechercher
        • 0.3 Préparer
        • 0.4 Soyez Discipliné
        • 0.5 Postulez
        • 0.6 Convainquez
        • 0.7 Passez
    • PT | Aqui é Como Pensar
      • 1 O Indivíduo
        • 1.1 Usa a Tua Bússola Moral
        • 1.2 Prevê
        • 1.3 Torna-o Teu
        • 1.4 Aponta Alto
        • 1.5 Trabalha Arduamente
        • 1.6 Pausa e Continua
        • 1.7 Faz Mais Com Menos
      • 2 O Líder
        • 2.1 Investe
        • 2.2 Mereça-o
        • 2.3 Sê Claro
        • 2.4 Lê a Sala
        • 2.5 Força-Tarefa vs Proprietário
        • 2.6 O Conhecimento na Sala
        • 2.7 O Perfeccionista
      • 3 O Proprietário
        • 3.1 O Momento
        • 3.2 A Janela
        • 3.3 Alarga a tua Responsabilidade
        • 3.4 Atrito
        • 3.5 O Jogo Longo
        • 3.6 Pausa (PT)
        • 3.7 Equilíbrio (PT)
        • 3.8 Diversidade
      • 4 O Visionário
        • 4.1 O Tempo Avança Rápido
        • 4.2 A Ideia por Trás da Ideia
        • 4.3 Automatiza (PT)
        • 4.4 Pensa Grande
        • 4.5 Construir para Durar
        • 4.6 Ganha e Multiplica
        • 4.7 Investe por Aquisição
        • 4.8 Retribui
      • 0 O Candidato
        • 0.1 Decidir (PT)
        • 0.2 Pesquisar
        • 0.3 Preparar (PT)
        • 0.4 Sê Disciplinado
        • 0.5 Candidate-se
        • 0.6 Convença
        • 0.7 Passa
    • RU | Вот как думать
      • 1 Индивидуум
        • 1.1 Используй свой Моральный Компас
        • 1.2 Предсказывай
        • 1.3 Возьми на Себя
        • 1.4 Целься Выше
        • 1.5 Работай Усердно
        • 1.6 Пауза и Продолжение
        • 1.7 Делай Больше С Меньшим
      • 2 Лидер
        • 2.1 Инвестируй
        • 2.2 Заслужи это
        • 2.3 Будь Ясным
        • 2.4 Читай Зал
        • 2.5 Рабочая Группа vs Владелец
        • 2.6 Знание в Зале
        • 2.7 Перфекционист
      • 3 Владелец
        • 3.1 Момент
        • 3.2 Окно
        • 3.3 Расширь свою Ответственность
        • 3.4 Текучесть Kадров
        • 3.5 Долгая Игра
        • 3.6 Пауза
        • 3.7 Баланс
        • 3.8 Разнообразие
      • 4 Визионер
        • 4.1 Время Движется Быстро
        • 4.2 Идея за Идеей
        • 4.3 Автоматизируй
        • 4.4 Думай Масштабно
        • 4.5 Строй на Долгое Время
        • 4.6 Зарабатывай и Умножай
        • 4.7 Инвестируй через Приобретение
        • 4.8 Передай Дальше
      • 0 Кандидат
        • 0.1 Решить
        • 0.2 Исследовать
        • 0.3 Подготовиться
        • 0.4 Будь Дисциплинированным
        • 0.5 Откликайтесь
        • 0.6 Убеждайте
        • 0.7 Пройдите
  • PROCESS
    • EN | Here is How to Build
      • EN | Design
        • EN | 1.1 Principles
          • 1.1.1 Did you Know?
          • 1.1.2 See
          • 1.1.3 Design
          • 1.1.4 Sign
          • 1.1.5 Prepare
          • 1.1.6 Run
          • 1.1.7 Support
        • EN | 1.2 Rules
          • 1.2.1.A Rule
          • 1.2.2 What
          • 1.2.3 How
          • 1.2.4 When
          • 1.2.5 Why
          • 1.2.6 Who
          • 1.2.7 A Sound Rule
          • 1.2.8 The Whole
      • EN | Operate
      • EN | Change
      • EN | Control
      • EN | Govern
      • EN | Diagnose
      • EN | Master
    • ES | Aquí es Cómo Construir
      • ES | Diseño
        • ES | 1.1 Principios
          • 1.1.1 ¿Sabías Que?
          • 1.1.2 Ver
          • 1.1.3 Diseñar
          • 1.1.4 Firmar
          • 1.1.5 Preparar
          • 1.1.6 Ejecutar
          • 1.1.7 Apoyar
        • ES | 1.2 Reglas
          • 1.2.1 Una Regla
          • 1.2.2 Qué
          • 1.2.3 Cómo
          • 1.2.4 Cuándo
          • 1.2.5 Por Qué
          • 1.2.6 Quién
          • 1.2.7 Una Regla Sólida
          • 1.2.8 El Todo
    • FR | Ici, c'est Comment Construire
      • FR | Conception
        • FR | 1.1 Principes
          • 1.1.1 Le saviez-vous ?
          • 1.1.2 Voir
          • 1.1.3 Concevoir
          • 1.1.4 Signer
          • 1.1.5 Préparer
          • 1.1.6 Exécuter
          • 1.1.7 Soutenir
        • FR | 1.2 Règles
          • 1.2.1 Une Règle
          • 1.2.2 Quoi
          • 1.2.3 Comment
          • 1.2.4 Quand
          • 1.2.5 Pourquoi
          • 1.2.6 Qui
          • 1.2.7 Une Règle Solide
    • PT | Aqui é Como Construir
      • PT | Design
        • PT | 1.1 Princípios
          • 1.1.1 Sabias?
          • 1.1.2 Ver (PT)
          • 1.1.3 Design (PT)
          • 1.1.4 Assinar
          • 1.1.5 Preparar (PT)
          • 1.1.6 Executar
          • 1.1.7 Apoiar
        • PT | 1.2 Regras
          • 1.2.1 Uma Regra
          • 1.2.2 O quê
          • 1.2.3 Como
          • 1.2.4 Quando
          • 1.2.5 Por Que
          • 1.2.6 Quem
          • 1.2.7 Uma Regra Sólida
    • RU | Вот Как Строить
      • RU | Проектирование
        • RU | 1.1 Принципы
          • 1.1.1 А вы знали?
          • 1.1.2 Видеть
          • 1.1.3 Проектировать
          • 1.1.4 Подписывать
          • 1.1.5 Подготавливать
          • 1.1.6 Запускать
          • 1.1.7 Поддерживать
        • RU | 1.2 Правила
          • 1.2.1 Правило
          • 1.2.2 Что
          • 1.2.3 Как
          • 1.2.4 Когда
          • 1.2.5 Почему
          • 1.2.6 Кто
          • 1.2.7 Прочное Правило
    • EN | Migration
      • CHAPTER 1. Why Processes Drive Transformation
      • CHAPTER 2. From Steps to System by MarvinPro
      • CHAPTER 3. Phases by MarvinPro
      • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
      • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
      • CHAPTER 6. What Makes Migration Successful by MarvinPro
    • EN | Migration S/4HANA Edition
      • 1. Why Processes Drive Transformation by MarvinPro
      • 2. Design Phase — Building for Scale by MarvinPro
      • 3. Core Functional Domains
      • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
      • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
      • 6. What Makes Migration Successful by MarvinPro
    • EN | Exceptions
      • 1. Why Exceptions Define by MarvinPro
      • 2. What Is an Exception
      • 3. Designing for Exceptions
      • 4. Operating Under Pressure
      • 5. Recovery and Stabilisation
      • 6. Learning from Exceptions
      • 7. The Exception-Ready Organisation
      • 8. The Future of Exception Handling by MarvinPro
    • PROCESSES COLLECTION
      • PROCESS Catalog
  • PROOF
    • 1 MarvinPro Showcase
      • MarvinPro Initiatives
    • 2 GDPRSave Showcase
      • GDPRSave Initiatives
    • 3 Confidential Showcase
      • Confidential Initiatives
    • 4 ArtnPro Showcase
      • ArtnPro Initiatives
  • KNOWLEDGE
  • STORIES
    • EN | The CEO
      • CHAPTER 0. Prologue
      • CHAPTER 1. Day One
      • CHAPTER 2. The Room
      • CHAPTER 3. The Pressure
      • CHAPTER 4. The Presentation
      • CHAPTER 5. The Contract
      • CHAPTER 6. The Transfer
      • CHAPTER 7. The Script
      • CHAPTER 8. The Distance
      • CHAPTER 9. The Customer Who Knows More
      • CHAPTER 10. The Knowledge That Left
      • CHAPTER 11. The Culture Nobody Transferred
      • CHAPTER 12. The Friend
      • CHAPTER 13. The Invisible Wall
      • CHAPTER 14. The Manager Who Performs Upward
      • Coming Soon
    • ES | El CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. El Primer Día
      • CAPÍTULO 2. La Sala
      • CAPÍTULO 3. La Presión
      • CAPÍTULO 4. La Presentación
      • CAPÍTULO 5. El Contrato
      • CAPÍTULO 6. La Transferencia
      • CAPÍTULO 7. El Guión
      • CAPÍTULO 8. La Distancia
      • CAPÍTULO 9. La Clienta Que Sabe Más
      • CAPÍTULO 10. El Conocimiento Que Se Fue
      • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
      • Próximamente
    • FR | Le CEO
      • CHAPITRE 0. Prologue
      • CHAPITRE 1. Jour Un
      • CHAPITRE 2. La Salle
      • CHAPITRE 3. La Pression
      • CHAPITRE 4. La Présentation
      • CHAPITRE 5. Le Contrat
      • CHAPITRE 6. Le Transfert
      • CHAPITRE 7. Le Script
      • CHAPITRE 8. La Distance
      • CHAPITRE 9. La Cliente Qui En Sait Plus
      • CHAPITRE 10. Le Savoir Qui Est Parti
      • CHAPITRE 11. La Culture Que Personne N'a Transférée
      • Bientôt Disponible
    • PT | O CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. Dia Um
      • CAPÍTULO 2. A Sala
      • CAPÍTULO 3. A Pressão
      • CAPÍTULO 4. A Apresentação
      • CAPÍTULO 5. O Contrato
      • CAPÍTULO 6. A Transferência
      • CAPÍTULO 7. O Guião
      • CAPÍTULO 8. A Distância
      • CAPÍTULO 9. A Cliente Que Sabe Mais
      • CAPÍTULO 10. O Conhecimento Que Partiu
      • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
      • Em Breve
    • RU | ГД
      • ГЛАВА 0. ПРОЛОГ
      • ГЛАВА 1. День первый
      • ГЛАВА 2. Комната
      • ГЛАВА 3. Давление
      • ГЛАВА 4. Презентация
      • ГЛАВА 5. Контракт
      • ГЛАВА 6. Перевод
      • ГЛАВА 7. Сценарий
      • ГЛАВА 8. Дистанция
      • ГЛАВА 9. Клиент, который знает больше
      • ГЛАВА 10. Знание, которое ушло
      • ГЛАВА 11. Культура, которую никто не передал
      • Скоро будет доступно
  • MPAC
  • ARTWORK
    • Leadership Art
    • The CEO Art
    • Quotes n Flower Tiles
    • Quotes n Mountain Tiles
  • More
    • LEADERSHIP
      • EN | Here is How to Think
        • 1 The Individual
          • 1.1 Use Your Moral Compass
          • 1.2 Predict
          • 1.3 Own It
          • 1.4 Aim High
          • 1.5 Work Hard
          • 1.6 Pause and Continue
          • 1.7 Do More With Less
        • 2 The Leader
          • 2.1 Invest
          • 2.2 Earn It
          • 2.3 Be Clear
          • 2.4 Read the Room
          • 2.5 Task Force vs Owner
          • 2.6 Knowledge in the Room
          • 2.7 The Perfectionist
        • 3 The Owner
          • 3.1 Timing
          • 3.2 The Window
          • 3.3 Broaden your Responsibility
          • 3.4 Attrition
          • 3.5 The Long Game
          • 3.6 Pause
          • 3.7 Balance
          • 3.8 Diversity (Bonus)
        • 4 The Visionary
          • 4.1 Time moves fast
          • 4.2 The Idea Behind the Idea
          • 4.3 Automate
          • 4.4 Think Big
          • 4.5 Build to Last
          • 4.6 Earn and Compound
          • 4.7 Invest by Acquisition
          • 4.8 Pay it Forward
        • 0 The Candidate
          • 0.1 Decide
          • 0.2 Research
          • 0.3 Prepare
          • 0.4 Be Disciplined
          • 0.5 Apply
          • 0.6 Convince
          • 0.7 Pass
      • ES | Aquí es Cómo Pensar
        • 1 El Individuo
          • 1.1 Usa tu Brújula Moral
          • 1.2 Predice
          • 1.3 Hazlo Tuyo
          • 1.4 Apunta Alto
          • 1.5 Trabaja Duro
          • 1.6 Pausa y Continúa
          • 1.7 Hacer Más Con Menos
        • 2 El Líder
          • 2.1 Invierte
          • 2.2 Gánatelo
          • 2.3 Sé claro
          • 2.4 Lee la Sala
          • 2.5 Fuerza de Tarea vs Propietario
          • 2.6 El Conocimiento en la Sala
          • 2.7 El Perfeccionista
        • 3 El Propietario
          • 3.1 El Momento
          • 3.2 La Ventana
          • 3.3 Amplía tu Responsabilidad
          • 3.4 Deserción
          • 3.5 El Juego Largo
          • 3.6 Pausa
          • 3.7 Equilibrio
          • 3.8 Diversidad
        • 4 El Visionario
          • 4.1 El Tiempo Avanza Rápido
          • 4.2 La Idea Detrás de la Idea
          • 4.3 Automatiza
          • 4.4 Piensa en Grande
          • 4.5 Construye para Durar
          • 4.6 Gana y Multiplica
          • 4.7 Invierte por Adquisición
          • 4.8 Devuelve el Favor
        • 0 El Candidato
          • 0.1 Decidir
          • 0.2 Investigar
          • 0.3 Preparar
          • 0.4 Sé Disciplinado
          • 0.5 Aplica
          • 0.6 Convence
          • 0.7 Supera
      • FR | Voici Comment Penser
        • 1 L’Individu
          • 1.1 Utilise ta Boussole Morale
          • 1.2 Prédire
          • 1.3 Prends-en la Responsabilité
          • 1.4 Vise Haut
          • 1.5 Travaille Dur
          • 1.6 Pause et Continue
          • 1.7 Faire Plus Avec Moins
        • 2 Le Leader
          • 2.1 Investis
          • 2.2 Mérite-le
          • 2.3 Sois Clair
          • 2.4 Lis la Salle
          • 2.5 Force de Travail vs Propriétaire
          • 2.6 La Connaissance dans la Salle
          • 2.7 Le Perfectionniste
        • 3 Le Propriétaire
          • 3.1 Le Moment
          • 3.2 La Fenêtre
          • 3.3 Élargis ta Responsabilité
          • 3.4 Attrition (FR)
          • 3.5 Le Jeu Long
          • 3.6 Pause (FR)
          • 3.7 Équilibre
          • 3.8 Diversité
        • 4 Le Visionnaire
          • 4.1 Le Temps Avance Vite
          • 4.2 L'Idée Derrière l'Idée
          • 4.3 Automatise
          • 4.4 Pense Grand
          • 4.5 Construire pour Durer
          • 4.6 Gagne et Compose
          • 4.7 Investis par Acquisition
          • 4.8 Rends la Pareille
        • 0 Le Candidat
          • 0.1 Décider
          • 0.2 Rechercher
          • 0.3 Préparer
          • 0.4 Soyez Discipliné
          • 0.5 Postulez
          • 0.6 Convainquez
          • 0.7 Passez
      • PT | Aqui é Como Pensar
        • 1 O Indivíduo
          • 1.1 Usa a Tua Bússola Moral
          • 1.2 Prevê
          • 1.3 Torna-o Teu
          • 1.4 Aponta Alto
          • 1.5 Trabalha Arduamente
          • 1.6 Pausa e Continua
          • 1.7 Faz Mais Com Menos
        • 2 O Líder
          • 2.1 Investe
          • 2.2 Mereça-o
          • 2.3 Sê Claro
          • 2.4 Lê a Sala
          • 2.5 Força-Tarefa vs Proprietário
          • 2.6 O Conhecimento na Sala
          • 2.7 O Perfeccionista
        • 3 O Proprietário
          • 3.1 O Momento
          • 3.2 A Janela
          • 3.3 Alarga a tua Responsabilidade
          • 3.4 Atrito
          • 3.5 O Jogo Longo
          • 3.6 Pausa (PT)
          • 3.7 Equilíbrio (PT)
          • 3.8 Diversidade
        • 4 O Visionário
          • 4.1 O Tempo Avança Rápido
          • 4.2 A Ideia por Trás da Ideia
          • 4.3 Automatiza (PT)
          • 4.4 Pensa Grande
          • 4.5 Construir para Durar
          • 4.6 Ganha e Multiplica
          • 4.7 Investe por Aquisição
          • 4.8 Retribui
        • 0 O Candidato
          • 0.1 Decidir (PT)
          • 0.2 Pesquisar
          • 0.3 Preparar (PT)
          • 0.4 Sê Disciplinado
          • 0.5 Candidate-se
          • 0.6 Convença
          • 0.7 Passa
      • RU | Вот как думать
        • 1 Индивидуум
          • 1.1 Используй свой Моральный Компас
          • 1.2 Предсказывай
          • 1.3 Возьми на Себя
          • 1.4 Целься Выше
          • 1.5 Работай Усердно
          • 1.6 Пауза и Продолжение
          • 1.7 Делай Больше С Меньшим
        • 2 Лидер
          • 2.1 Инвестируй
          • 2.2 Заслужи это
          • 2.3 Будь Ясным
          • 2.4 Читай Зал
          • 2.5 Рабочая Группа vs Владелец
          • 2.6 Знание в Зале
          • 2.7 Перфекционист
        • 3 Владелец
          • 3.1 Момент
          • 3.2 Окно
          • 3.3 Расширь свою Ответственность
          • 3.4 Текучесть Kадров
          • 3.5 Долгая Игра
          • 3.6 Пауза
          • 3.7 Баланс
          • 3.8 Разнообразие
        • 4 Визионер
          • 4.1 Время Движется Быстро
          • 4.2 Идея за Идеей
          • 4.3 Автоматизируй
          • 4.4 Думай Масштабно
          • 4.5 Строй на Долгое Время
          • 4.6 Зарабатывай и Умножай
          • 4.7 Инвестируй через Приобретение
          • 4.8 Передай Дальше
        • 0 Кандидат
          • 0.1 Решить
          • 0.2 Исследовать
          • 0.3 Подготовиться
          • 0.4 Будь Дисциплинированным
          • 0.5 Откликайтесь
          • 0.6 Убеждайте
          • 0.7 Пройдите
    • PROCESS
      • EN | Here is How to Build
        • EN | Design
          • EN | 1.1 Principles
            • 1.1.1 Did you Know?
            • 1.1.2 See
            • 1.1.3 Design
            • 1.1.4 Sign
            • 1.1.5 Prepare
            • 1.1.6 Run
            • 1.1.7 Support
          • EN | 1.2 Rules
            • 1.2.1.A Rule
            • 1.2.2 What
            • 1.2.3 How
            • 1.2.4 When
            • 1.2.5 Why
            • 1.2.6 Who
            • 1.2.7 A Sound Rule
            • 1.2.8 The Whole
        • EN | Operate
        • EN | Change
        • EN | Control
        • EN | Govern
        • EN | Diagnose
        • EN | Master
      • ES | Aquí es Cómo Construir
        • ES | Diseño
          • ES | 1.1 Principios
            • 1.1.1 ¿Sabías Que?
            • 1.1.2 Ver
            • 1.1.3 Diseñar
            • 1.1.4 Firmar
            • 1.1.5 Preparar
            • 1.1.6 Ejecutar
            • 1.1.7 Apoyar
          • ES | 1.2 Reglas
            • 1.2.1 Una Regla
            • 1.2.2 Qué
            • 1.2.3 Cómo
            • 1.2.4 Cuándo
            • 1.2.5 Por Qué
            • 1.2.6 Quién
            • 1.2.7 Una Regla Sólida
            • 1.2.8 El Todo
      • FR | Ici, c'est Comment Construire
        • FR | Conception
          • FR | 1.1 Principes
            • 1.1.1 Le saviez-vous ?
            • 1.1.2 Voir
            • 1.1.3 Concevoir
            • 1.1.4 Signer
            • 1.1.5 Préparer
            • 1.1.6 Exécuter
            • 1.1.7 Soutenir
          • FR | 1.2 Règles
            • 1.2.1 Une Règle
            • 1.2.2 Quoi
            • 1.2.3 Comment
            • 1.2.4 Quand
            • 1.2.5 Pourquoi
            • 1.2.6 Qui
            • 1.2.7 Une Règle Solide
      • PT | Aqui é Como Construir
        • PT | Design
          • PT | 1.1 Princípios
            • 1.1.1 Sabias?
            • 1.1.2 Ver (PT)
            • 1.1.3 Design (PT)
            • 1.1.4 Assinar
            • 1.1.5 Preparar (PT)
            • 1.1.6 Executar
            • 1.1.7 Apoiar
          • PT | 1.2 Regras
            • 1.2.1 Uma Regra
            • 1.2.2 O quê
            • 1.2.3 Como
            • 1.2.4 Quando
            • 1.2.5 Por Que
            • 1.2.6 Quem
            • 1.2.7 Uma Regra Sólida
      • RU | Вот Как Строить
        • RU | Проектирование
          • RU | 1.1 Принципы
            • 1.1.1 А вы знали?
            • 1.1.2 Видеть
            • 1.1.3 Проектировать
            • 1.1.4 Подписывать
            • 1.1.5 Подготавливать
            • 1.1.6 Запускать
            • 1.1.7 Поддерживать
          • RU | 1.2 Правила
            • 1.2.1 Правило
            • 1.2.2 Что
            • 1.2.3 Как
            • 1.2.4 Когда
            • 1.2.5 Почему
            • 1.2.6 Кто
            • 1.2.7 Прочное Правило
      • EN | Migration
        • CHAPTER 1. Why Processes Drive Transformation
        • CHAPTER 2. From Steps to System by MarvinPro
        • CHAPTER 3. Phases by MarvinPro
        • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
        • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
        • CHAPTER 6. What Makes Migration Successful by MarvinPro
      • EN | Migration S/4HANA Edition
        • 1. Why Processes Drive Transformation by MarvinPro
        • 2. Design Phase — Building for Scale by MarvinPro
        • 3. Core Functional Domains
        • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
        • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
        • 6. What Makes Migration Successful by MarvinPro
      • EN | Exceptions
        • 1. Why Exceptions Define by MarvinPro
        • 2. What Is an Exception
        • 3. Designing for Exceptions
        • 4. Operating Under Pressure
        • 5. Recovery and Stabilisation
        • 6. Learning from Exceptions
        • 7. The Exception-Ready Organisation
        • 8. The Future of Exception Handling by MarvinPro
      • PROCESSES COLLECTION
        • PROCESS Catalog
    • PROOF
      • 1 MarvinPro Showcase
        • MarvinPro Initiatives
      • 2 GDPRSave Showcase
        • GDPRSave Initiatives
      • 3 Confidential Showcase
        • Confidential Initiatives
      • 4 ArtnPro Showcase
        • ArtnPro Initiatives
    • KNOWLEDGE
    • STORIES
      • EN | The CEO
        • CHAPTER 0. Prologue
        • CHAPTER 1. Day One
        • CHAPTER 2. The Room
        • CHAPTER 3. The Pressure
        • CHAPTER 4. The Presentation
        • CHAPTER 5. The Contract
        • CHAPTER 6. The Transfer
        • CHAPTER 7. The Script
        • CHAPTER 8. The Distance
        • CHAPTER 9. The Customer Who Knows More
        • CHAPTER 10. The Knowledge That Left
        • CHAPTER 11. The Culture Nobody Transferred
        • CHAPTER 12. The Friend
        • CHAPTER 13. The Invisible Wall
        • CHAPTER 14. The Manager Who Performs Upward
        • Coming Soon
      • ES | El CEO
        • CAPÍTULO 0. Prólogo
        • CAPÍTULO 1. El Primer Día
        • CAPÍTULO 2. La Sala
        • CAPÍTULO 3. La Presión
        • CAPÍTULO 4. La Presentación
        • CAPÍTULO 5. El Contrato
        • CAPÍTULO 6. La Transferencia
        • CAPÍTULO 7. El Guión
        • CAPÍTULO 8. La Distancia
        • CAPÍTULO 9. La Clienta Que Sabe Más
        • CAPÍTULO 10. El Conocimiento Que Se Fue
        • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
        • Próximamente
      • FR | Le CEO
        • CHAPITRE 0. Prologue
        • CHAPITRE 1. Jour Un
        • CHAPITRE 2. La Salle
        • CHAPITRE 3. La Pression
        • CHAPITRE 4. La Présentation
        • CHAPITRE 5. Le Contrat
        • CHAPITRE 6. Le Transfert
        • CHAPITRE 7. Le Script
        • CHAPITRE 8. La Distance
        • CHAPITRE 9. La Cliente Qui En Sait Plus
        • CHAPITRE 10. Le Savoir Qui Est Parti
        • CHAPITRE 11. La Culture Que Personne N'a Transférée
        • Bientôt Disponible
      • PT | O CEO
        • CAPÍTULO 0. Prólogo
        • CAPÍTULO 1. Dia Um
        • CAPÍTULO 2. A Sala
        • CAPÍTULO 3. A Pressão
        • CAPÍTULO 4. A Apresentação
        • CAPÍTULO 5. O Contrato
        • CAPÍTULO 6. A Transferência
        • CAPÍTULO 7. O Guião
        • CAPÍTULO 8. A Distância
        • CAPÍTULO 9. A Cliente Que Sabe Mais
        • CAPÍTULO 10. O Conhecimento Que Partiu
        • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
        • Em Breve
      • RU | ГД
        • ГЛАВА 0. ПРОЛОГ
        • ГЛАВА 1. День первый
        • ГЛАВА 2. Комната
        • ГЛАВА 3. Давление
        • ГЛАВА 4. Презентация
        • ГЛАВА 5. Контракт
        • ГЛАВА 6. Перевод
        • ГЛАВА 7. Сценарий
        • ГЛАВА 8. Дистанция
        • ГЛАВА 9. Клиент, который знает больше
        • ГЛАВА 10. Знание, которое ушло
        • ГЛАВА 11. Культура, которую никто не передал
        • Скоро будет доступно
    • MPAC
    • ARTWORK
      • Leadership Art
      • The CEO Art
      • Quotes n Flower Tiles
      • Quotes n Mountain Tiles

PROCESS

Aqui é Como Construir

Design

Princípios

DISCIPLINA 7
Apoiar

PT: Ver | Projetar | Assinar | Preparar | Executar | Apoiar

Ver
Apoio contra o que o processo realmente encontra, não o que deveria

Projetar
Apoio o processo que foi projetado, mantendo-o fiel a si mesmo

Assinar
Apoio apenas o que foi aprovado, e cuido-o dentro desses limites

Preparar
Apoio melhor o que preparar deixou pronto, assim pouco precisa de cuidado

Executar
Apoio desde o momento em que se executa, e fico até que já não o faça

Apoiar
Mantenho o processo em funcionamento cuidado, enquanto viver


DISCIPLINA 7
Apoiar

O que é apoiar
O apoio reforçado: a ligação direta
Quanto dura o apoio reforçado
O apoio normal: a via padrão
Até ao fim do processo
The discipline that completes the cycle
Exemplo real
Apoiar

←

→

O que é apoiar

Um processo em funcionamento não se deixa a si mesmo. Desde o momento em que entra em funcionamento, é cuidado, e esse cuidado é apoiar. Apoiar começa onde começa executar, na entrada em funcionamento, e ao contrário das outras disciplinas, não termina quando a mudança assenta. Continua durante toda a vida do processo, até que o processo se torne redundante ou a organização feche. De todas as disciplinas, apoiar é a de vida mais longa.

Apoiar tem duas camadas, e diferem em quão próximas e quão rápidas são. A primeira é o apoio reforçado, o apoio intenso e direto logo após a entrada em funcionamento, quando a mudança é nova e as pequenas coisas que o uso real revela são detetadas e corrigidas depressa. A segunda é o apoio normal, o apoio constante que segue, correndo por uma via estabelecida enquanto o processo viver. O apoio reforçado é breve e próximo; o apoio normal é longo e permanente. O primeiro assenta a mudança; o segundo mantém-na cuidada a partir de então.

Estas duas camadas refletem executar, e por boa razão. Executar tinha um momento intensificado na entrada em funcionamento que assentava em operação constante; apoiar tem uma camada intensificada na entrada em funcionamento, o apoio reforçado, que assenta em apoio constante. As duas disciplinas começam juntas, na entrada em funcionamento, e correm lado a lado: executar leva a mudança em funcionamento e mantém-na em marcha, enquanto apoiar cuida do que a marcha revela. Onde estão mais próximas é no apoio reforçado, os primeiros dias, quando a mudança é mais nova e precisa de mais cuidado. Depois disso, ambas passam às suas formas constantes.

O padrão mais elevado possível é entender apoiar como o cuidado de um processo em funcionamento desde a entrada em funcionamento durante toda a sua vida, em duas camadas, o apoio reforçado intenso e direto que assenta a mudança, e o apoio normal constante e permanente que a mantém cuidada até ao fim do processo.

Conclusão chave: Um processo em funcionamento é cuidado, não deixado a si mesmo, e esse cuidado é apoiar. Apoiar começa na entrada em funcionamento e, ao contrário das outras disciplinas, dura toda a vida do processo, até que se torne redundante ou a organização feche, o que o faz a disciplina de vida mais longa. Tem duas camadas: o apoio reforçado, o apoio intenso e direto logo após a entrada em funcionamento que assenta a mudança, e o apoio normal, o apoio constante e permanente que segue enquanto o processo viver.

Apoiar é o cuidado de um processo em funcionamento, desde o momento em que se executa até ao dia em que já não o faz.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Princípios · Disciplina 7: Apoiar · Secção: O que é apoiar

MarvinPro | Junho 2026

marvinpro.com

O apoio reforçado: a ligação direta

O apoio reforçado é o apoio próximo dos primeiros dias. O seu traço definidor é uma ligação direta entre quem faz o trabalho e quem é responsável por cada parte dele, de modo que o que surja possa ser levantado e corrigido de imediato. Esta ligação pode ser física, o líder no local com a equipa, ou pode ser um canal feito para o efeito, um grupo de conversa que mantém juntos a equipa e as pessoas que possuem cada entregável num só lugar. De qualquer modo, o ponto é o mesmo: proximidade, para que nada espere.

Por esta ligação vem tudo o que o uso real revela, e revela o que nenhuma preparação pôde prever por completo. Um passo num sistema é chamado de uma maneira na ferramenta e de outra na documentação, e as pessoas confundem-se. Um passo precisa de uma opção que não lhe foi dada. Alguém tem acesso a tudo menos a um passo, e fica preso aí. Um guia é mais difícil de seguir do que parecia, ou um modelo, a redação padrão que o pessoal usa para que todos comuniquem da mesma forma, soa desajeitado, ou leva um erro, ou está mal traduzido numa das línguas. Um parceiro não está seguro de algo no novo fluxo. Nenhuma destas é grande. São o pequeno resíduo imprevisível que só o uso em funcionamento expõe, e são pequenas precisamente porque as coisas complexas foram detetadas ao preparar. O apoio reforçado não é onde aparecem os grandes problemas. É onde os últimos pequenos são encontrados e corrigidos.

E são corrigidos de imediato. Porque as pessoas responsáveis por cada parte são diretamente alcançáveis, uma etiqueta confusa é corrigida, uma opção em falta acrescentada, uma permissão concedida, um modelo reescrito ou retraduzido, um guia esclarecido, ali mesmo. A documentação está viva nestes dias: à medida que chegam as perguntas, os guias, os modelos e as respostas às perguntas comuns são atualizados depressa, para que a próxima pessoa a perguntar encontre a resposta já ali. É aqui que ter documentação que se pode mudar depressa prova o seu valor, quanto mais se corrige agora, menos se pergunta depois. A ligação direta transforma a enxurrada de pequenos atritos num processo que melhora depressa.

O padrão mais elevado possível é apoiar os primeiros dias através de uma ligação direta entre quem faz o trabalho e quem é responsável por cada parte, de modo que as pequenas coisas que o uso real revela, em sistemas, acessos, guias, modelos e parceiros, sejam detetadas e corrigidas de imediato, e a documentação seja melhorada depressa à medida que chegam as perguntas.

Conclusão chave: O apoio reforçado é o apoio próximo dos primeiros dias, construído sobre uma ligação direta, no local ou um grupo de conversa, entre quem faz o trabalho e quem possui cada parte, para que o que surja seja corrigido de imediato. O que surge é pequeno, um passo mal etiquetado, uma opção em falta, uma falha de permissão, um modelo desajeitado ou mal traduzido, a incerteza de um parceiro, porque as coisas complexas foram detetadas ao preparar. As correções acontecem no momento, e a documentação é atualizada depressa à medida que chegam as perguntas, para que a próxima pessoa encontre a resposta já ali.

O apoio reforçado é proximidade, para que nada espere. As pequenas coisas que o uso real revela são detetadas e corrigidas de imediato.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Princípios · Disciplina 7: Apoiar · Secção: O apoio reforçado: a ligação direta

MarvinPro | Junho 2026

marvinpro.com

Quanto dura o apoio reforçado

O apoio reforçado não tem uma duração fixa. Dura o que o processo precisar para assentar, e a tarefa do líder é julgá-lo. Um valor por omissão comum é cerca de duas semanas, mas é só um valor por omissão. O que verdadeiramente fixa a duração é quanto tempo leva a correr casos reais suficientes para que os pequenos problemas tenham surgido e sido corrigidos.

Isso depende do processo, e pode puxar em qualquer direção. Um processo de baixo volume precisa de mais tempo, não de menos. Quando chegam poucos casos, os problemas surgem devagar, e tens de ficar perto mais tempo para os detetar. Um processo novo costuma ser de baixo volume, é um de muitos que uma pessoa realiza, por isso isto é comum e não estranho. No outro extremo, um processo de alto volume trabalhado por muita gente também precisa de mais tempo, mas pela razão oposta. Com muita gente, há muitas perguntas, a mesma incerteza posta de uma dúzia de maneiras diferentes, e leva tempo a resolvê-las todas. Aqui a maneira de acompanhar o ritmo é atualizar a documentação viva depressa, transformando cada pergunta numa resposta que a próxima pessoa encontrará, para que as perguntas diminuam à medida que a orientação melhora. Entre estes extremos está o caso vulgar, e o valor por omissão de duas semanas.

Há também uma razão para não manter o apoio reforçado mais tempo do que o necessário. A pessoa que o leva, quando essa pessoa é o proprietário da área, é um recurso caro e solicitado, carregando reuniões de fornecedores, interessados, relatórios e outras mudanças em curso, e é precisa de volta entre eles e na coisa seguinte. Por isso ficas perto o suficiente para assentar o processo, e depois afastas-te. É diferente quando a mudança é levada por alguém dedicado a ela, um recurso de projeto afetado só a esse processo pode ficar durante todo o apoio reforçado, um mês ou dois, até que corra por completo, porque não tem outro lugar onde deva estar. De qualquer modo, o proprietário traz uma vantagem a estes dias: tendo projetado o processo, reconhece um problema no momento em que é descrito, e situa-o contra o projeto de imediato. E de cada vez, aprende. Uma classe de problema encontrada numa entrada em funcionamento é projetada para fora da seguinte, por isso preparar melhora a cada mudança, embora cada mudança ainda traga as suas próprias pequenas coisas novas.

O padrão mais elevado possível é manter o apoio reforçado tanto quanto o processo precisar para assentar e não mais, julgando a duração por quão depressa os casos reais fazem surgir os problemas, estendendo-o para o baixo volume ou para o alto volume com muita gente, e libertando um proprietário caro de volta ao seu trabalho assim que o processo está assente.

Conclusão chave: O apoio reforçado dura o que o processo precisar para assentar, com cerca de duas semanas como valor por omissão. O baixo volume estende-o, porque os problemas surgem devagar; o alto volume com muita gente também o estende, pelas muitas e variadas perguntas, atendidas atualizando a documentação viva depressa. Mantém-se não mais do que o necessário, porque um proprietário é caro e preciso noutro lugar, embora um recurso de projeto dedicado possa ficar um mês ou dois. O proprietário diagnostica depressa, tendo projetado o processo, e aprende de cada entrada em funcionamento.

Fica perto tanto quanto o processo precisar para assentar, e não mais. O proprietário caro é preciso noutro lugar, e aprende algo de cada entrada em funcionamento.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Princípios · Disciplina 7: Apoiar · Secção: Quanto dura o apoio reforçado

MarvinPro | Junho 2026

marvinpro.com

O apoio normal: a via padrão

Quando o processo corre felizmente e os problemas deixaram de surgir, o apoio reforçado termina. O fim marca-se com clareza: a ligação direta é fechada, o grupo de conversa encerrado, o líder já não está no local. Daqui em diante, o apoio muda de carácter. Torna-se apoio normal, o apoio constante e permanente que leva o processo o resto da sua vida.

O que muda é o canal, e com ele a velocidade. No apoio reforçado, qualquer coisa podia ser levantada diretamente e corrigida de imediato. No apoio normal, não há linha direta. Os problemas seguem uma via de escalada estabelecida, disposta de antemão, que diz quem é contactado, e em que ordem, quando algo não pode ser resolvido onde surgiu. A documentação amadurecida, os guias, modelos e respostas aperfeiçoados durante o apoio reforçado, serve agora como primeiro recurso, e as pessoas trabalham a partir dela tal como está. As correções a ela ainda acontecem, mas são mais difíceis e lentas de fazer do que antes, porque vão pela via padrão em vez de uma correção direta. É por isto que o apoio reforçado importa tanto: é a janela em que a documentação pode ser aperfeiçoada de forma barata, antes de esse atrito se instalar.

Uma via de escalada bem feita faz mais do que encaminhar problemas. Também protege as relações por que passa. Quando a via é projetada e acordada de antemão, incluindo os seus troços mais altos, usá-la é simplesmente o procedimento normal, não um ato de passar por cima de ninguém. Por isso quando um nível não resolve algo e o assunto tem de subir, mesmo até à sede de um parceiro, pode subir sem danificar a relação no nível de baixo, porque todos entenderam desde o início que era assim que a via funcionava. A via que é acordada de antemão é a via que pode ser usada limpamente quando é precisa.

Através de tudo isto, as medidas do processo, os seus indicadores chave e níveis de serviço, continuam a ser possuídas como sempre foram. Não são um traço do apoio mas da propriedade: a equipa e os seus responsáveis respondem por elas, e o proprietário observa-as por toda a área, explicando tanto as quedas como as forças. Uma mudança pode movê-las por um tempo, e esse movimento é permitido e explicado pela mudança. O apoio situa-se dentro desta propriedade permanente, não acima dela.

O padrão mais elevado possível é traspassar do apoio reforçado fechando a ligação direta, correr o apoio normal por uma via de escalada estabelecida com a documentação amadurecida como primeiro recurso, e projetar essa via, e os seus troços mais altos, de antemão e por acordo, de modo que possa ser usada limpamente sem danificar as relações por que passa.

Conclusão chave: Quando o processo corre felizmente, o apoio reforçado termina, marcado pelo fecho da ligação direta, e o apoio normal toma o lugar pela vida do processo. O canal muda: não há linha direta, mas uma via de escalada estabelecida, com a documentação amadurecida como primeiro recurso e as correções agora feitas pela via padrão. Uma via projetada e acordada de antemão, incluindo os seus troços mais altos, pode ser usada limpamente, mesmo até à sede de um parceiro, sem danificar a relação de baixo. As medidas do processo são possuídas de forma contínua, como parte da propriedade, não como um traço do apoio.

O apoio normal corre por uma via estabelecida, não por uma linha direta. Uma via acordada de antemão, até ao topo, pode ser usada sem danificar as relações por que passa.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Princípios · Disciplina 7: Apoiar · Secção: O apoio normal: a via padrão

MarvinPro | Junho 2026

marvinpro.com

Até ao fim do processo

Apoiar é a disciplina que não termina. As outras completam-se: um processo é visto, e o ver está feito; projetado, e o projeto está feito; assinado, preparado, executado. Mas apoiar, uma vez começado, continua. Corre tanto quanto corre o processo, ou seja, até que o processo já não seja preciso, substituído por algo melhor, tornado redundante, ou até que a organização a que serve já não esteja lá.

É isto que faz de apoiar a de vida mais longa das disciplinas, e muda como sustê-la. O apoio reforçado é uma rajada; o apoio normal é uma presença, calma, permanente, que dura anos. Não é intenso, e na maioria dos dias pede pouco, a via de escalada atende o que surge, a documentação responde o que pode. Mas está sempre lá, a garantia permanente de que um processo em funcionamento não é abandonado a si mesmo, de que há uma maneira de o que corre mal ser posto bem, enquanto o processo viver.

Apoiar um processo até ao seu fim é simplesmente continuar a cuidá-lo, ligeiramente, fielmente, até que já não esteja lá para cuidar. Um processo bem apoiado é um em que uma pessoa pode confiar, não porque nada nunca corra mal, mas porque quando algo corre mal, há uma maneira conhecida de o pôr bem. Essa garantia, sustida com constância durante toda a vida do processo, é o que apoiar finalmente é.

O padrão mais elevado possível é sustentar o apoio durante toda a vida do processo, ligeira e fielmente através dos seus longos anos constantes, de modo que o processo nunca seja abandonado a si mesmo e haja sempre uma maneira conhecida de pôr bem o que corre mal, até que o processo já não esteja lá para cuidar.

Conclusão chave: Apoiar é a disciplina que não termina. As outras completam-se; apoiar continua tanto quanto corre o processo, até que se torne redundante ou a organização feche, o que o faz a disciplina de vida mais longa. O apoio normal não é intenso mas permanente, uma presença calma ao longo de anos, a garantia de que um processo em funcionamento não é abandonado e de que o que corre mal tem uma maneira conhecida de ser posto bem. Apoiar um processo até ao seu fim é continuar a cuidá-lo, ligeira e fielmente, até que já não esteja lá para cuidar.

Apoiar é a disciplina que não termina. É a garantia permanente de que um processo em funcionamento nunca se deixa a si mesmo.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Princípios · Disciplina 7: Apoiar · Secção: Até ao fim do processo

MarvinPro | Junho 2026

marvinpro.com

The discipline that completes the cycle

Com apoiar, o ciclo está inteiro. Um processo foi visto, projetado, assinado, preparado, executado, e agora é apoiado. Cada disciplina fez a sua parte, e apoiar é a que sustém o que todas as outras construíram, mantendo o processo em funcionamento cuidado para que o trabalho de ver, projetar, assinar, preparar e executar perdure em vez de decair.

Há uma simetria calma nisso. Ver começou contra a realidade, a imagem verdadeira do que acontecia. Apoiar termina contra a realidade também, o processo em funcionamento encontrando o uso real, dia após dia, e sendo cuidado através dele. Entre ambos jaz todo o arco de construir uma mudança: de entender o que é, a projetar o que deveria ser, a assegurá-lo, aprontá-lo, executá-lo e mantê-lo. Apoiar é onde esse arco vem ao seu repouso, não porque o trabalho pare, mas porque a mudança se tornou simplesmente como o trabalho se faz, e apoiar é o que a mantém assim.

E o ciclo gira. Um processo apoiado corre até que uma nova necessidade seja vista, e então começa de novo, um novo ver, contra a realidade que o processo atual agora encontra. Por isso apoiar não só completa o ciclo; alimenta o seguinte, porque o processo em funcionamento que cuida é a realidade contra a qual a próxima mudança será vista. O fim de um arco é o chão do seguinte.

O padrão mais elevado possível é reconhecer apoiar como a disciplina que completa e preserva o ciclo, sustendo o que as outras construíram para que a mudança perdure, e cuidar o processo em funcionamento sabendo que é ao mesmo tempo o lugar de repouso de um arco e o chão sobre o qual o seguinte será visto.

Conclusão chave: Com apoiar, o ciclo está inteiro: visto, projetado, assinado, preparado, executado, apoiado. Apoiar sustém o que as outras construíram, mantendo o processo em funcionamento cuidado para que o trabalho perdure. Há uma simetria, ver começou contra a realidade, e apoiar termina contra a realidade, o processo em funcionamento encontrando o uso real e sendo cuidado através dele. E o ciclo gira: o processo apoiado é a realidade contra a qual a próxima mudança será vista, por isso apoiar ao mesmo tempo completa um arco e dá chão ao seguinte.

Apoiar completa o ciclo e sustém o que as outras construíram. É também o chão contra o qual a próxima mudança será vista.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Princípios · Disciplina 7: Apoiar · Secção: A disciplina que completa o ciclo

MarvinPro | Junho 2026

marvinpro.com

Exemplo real

Uma equipa vinha a gerir um tipo particular de devolução para os clientes, o reenvio de objetos deixados para trás, recuperados e devolvidos através de fronteiras. Fazia-o de maneira informal, sem um processo oficial, ajudada por um parceiro que já geria o envio padrão da organização e estava disposto a apoiar também estas devoluções. Funcionava, mas era não oficial. Chegou o ponto em que precisava de se tornar próprio: um processo real, com a sua própria contabilidade, para que os custos fossem seguidos e pagos corretamente. Uma conta do razão e uma ordem separadas foram estabelecidas para este único serviço, enquanto tudo o resto mantinha as existentes, e o processo foi projetado e acordado com o parceiro e com as finanças.

O trabalho em si não era difícil, mas fazer bem o pedido era, havia requisitos particulares a cumprir, por isso foi fornecida uma lista de verificação para o pessoal seguir, para garantir que cada passo fosse feito. O processo entrou em funcionamento em todos os países suportados ao mesmo tempo. Como tocava o pessoal e o parceiro em cada país, o proprietário apoiou ambos, diretamente, durante os primeiros dias. O alinhamento geral foi sustido com a sede do parceiro, mas os incidentes reais aconteciam localmente, por isso o proprietário apoiou cada escritório local do parceiro caso a caso à medida que as coisas surgiam. Isto era trabalho de baixo volume, as devoluções deste género são ocasionais, por isso o apoio próximo correu mais tempo do que correria para um processo ocupado, porque os problemas surgiam devagar, uns poucos casos de cada vez.

O que surgiu foi pequeno. Algumas das mensagens padrão que o pessoal usava precisavam de ser reescritas, e essas correções foram feitas a pedido à medida que chegavam. A lista de verificação e a orientação foram refinadas à medida que os casos reais as testavam. O momento maior chegou quando alguns escritórios locais do parceiro não renderam como deviam. O problema subiu pela via, do pessoal, às pessoas locais do parceiro, ao seu líder de equipa, e finalmente ao proprietário. O proprietário tratou-o com o responsável local do parceiro diretamente, mas não pôde ser resolvido ali. Por isso subiu mais, à sede do parceiro, que então o abordou com esse responsável, e foi posto bem. O que importou foi que isto não danificou a relação entre o proprietário e o responsável local, porque subir à sede era o procedimento acordado e normal, entendido por todos desde o início. A via foi usada exatamente como foi construída para ser.

Assim que as devoluções corriam sem percalços, o apoio próximo terminou. O contacto direto deu lugar à via padrão: a lista de verificação e as mensagens amadurecidas serviam o pessoal, e tudo o que surgia seguia a rota de escalada, nível por nível. O processo assentou na sua vida calma e permanente, cuidado ligeiramente, enquanto fosse preciso.

A via que é acordada de antemão, até ao topo, é a via que pode ser usada quando é precisa, sem quebrar aquilo por que passa. É isso que faz o apoio sustentar-se.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Princípios · Disciplina 7: Apoiar · Exemplo Real

MarvinPro | Junho 2026

marvinpro.com

Apoiar

Apoiar é o cuidado de um processo em funcionamento, desde o momento em que entra em funcionamento até ao dia em que já não está. É a de vida mais longa das disciplinas, começando com executar e continuando durante toda a vida do processo, até que esse processo se torne redundante ou a organização feche. Vem em duas camadas: o apoio reforçado, o apoio intenso e direto dos primeiros dias, e o apoio normal, o apoio constante e permanente que segue.

O apoio reforçado é proximidade. Através de uma ligação direta entre quem faz o trabalho e quem é responsável por cada parte, no local ou um canal feito para isso, as pequenas coisas que o uso real revela são detetadas e corrigidas de imediato: um passo mal etiquetado, uma opção em falta, uma falha de permissão, um modelo desajeitado ou mal traduzido, a incerteza de um parceiro. São pequenas porque preparar detetou as complexas, e são corrigidas no momento, enquanto a documentação é melhorada depressa à medida que chegam as perguntas. O apoio reforçado dura o que o processo precisar para assentar, cerca de duas semanas por omissão, mais para um processo de baixo volume cujos problemas surgem devagar, ou um de alto volume cuja muita gente põe muitas perguntas, e não mais do que o necessário, porque um proprietário caro é preciso noutro lugar, embora um recurso de projeto dedicado possa ficar durante ele.

Quando o processo corre felizmente, a ligação direta é fechada, e o apoio normal toma o lugar pela vida do processo. O canal muda: não há linha direta agora, mas uma via de escalada estabelecida, com a documentação amadurecida como primeiro recurso, e as correções feitas, mais devagar, pela via padrão. Uma via projetada e acordada de antemão, até aos seus troços mais altos, pode ser usada limpamente quando é precisa, mesmo até à sede de um parceiro, sem danificar as relações por que passa. Através de tudo isso, as medidas do processo são possuídas como sempre foram, como parte da propriedade, não como um traço do apoio.

Agora podes apoiar um processo durante toda a sua vida. Susténs os primeiros dias de perto, através de uma ligação direta que deteta e corrige as pequenas coisas de imediato e aperfeiçoa a documentação enquanto é fácil. Julgas quanto tempo ficar, por quão depressa o processo assenta, e afastas-te quando o fez, libertando um proprietário caro para o seu outro trabalho. Traspassas a uma via de escalada permanente, projetada e acordada de antemão para que possa ser usada sem dano, com a documentação amadurecida por trás. E manténs o processo cuidado, ligeira e fielmente, até que já não esteja lá para cuidar. O processo está visto, projetado, assinado, preparado, executado, e agora apoiado. O ciclo está inteiro, e o processo em funcionamento que deixa para trás é a realidade contra a qual a próxima mudança será vista.

Um processo em funcionamento nunca se deixa a si mesmo. Sustém os primeiros dias de perto, traspassa a uma via acordada de antemão, e cuida o processo fielmente enquanto viver. Com isso, o ciclo está inteiro.

MarvinPro · PROCESS · Aqui é Como Construir · Design · Princípios · Disciplina 7: Apoiar · Resultado do Capítulo

MarvinPro | Junho 2026

marvinpro.com

←

→

Pensa Simples.

info@marvinpro.com | feedback@marvinpro.com | support@marvinpro.com | mpac@marvinpro.com | collab@marvinpro.com | artwork@marvinpro.com 

© COPYRIGHT 1990-2026 MarvinPro  All rights reserved. Content is free to read. You are welcome to share quotes or the writer's thoughts from MarvinPro, as long as you post the complete attribution exactly as it appears in the text, including the quote, author name, year and marvinpro.com. Copying or reproducing other parts, full sections or chapters without permission is not permitted.

© COPYRIGHT 1990-2026 MarvinPro  Todos los derechos reservados. El contenido es libre de leer. Eres bienvenido a compartir citas o las reflexiones del autor de MarvinPro, siempre que publiques la atribución completa exactamente como aparece en el texto, incluyendo la cita, el nombre del autor, el año y marvinpro.com. No está permitido copiar ni reproducir otras partes, secciones completas o capítulos sin permiso.

© COPYRIGHT 1990-2026 MarvinPro  Tous droits réservés. Le contenu est libre de lecture. Vous êtes invité à partager des citations ou les réflexions de l'auteur de MarvinPro, à condition de publier l'attribution complète exactement telle qu'elle apparaît dans le texte, y compris la citation, le nom de l'auteur, l'année et marvinpro.com. Copier ou reproduire d'autres parties, des sections entières ou des chapitres sans autorisation n'est pas permis.

© COPYRIGHT 1990-2026 MarvinPro  Todos os direitos reservados. O conteúdo é livre de ler. És bem-vindo a partilhar citações ou as reflexões do autor de MarvinPro, desde que publiques a atribuição completa exatamente como aparece no texto, incluindo a citação, o nome do autor, o ano e marvinpro.com. Copiar ou reproduzir outras partes, secções completas ou capítulos sem permissão não é permitido.

© COPYRIGHT 1990-2026 MarvinPro  Все права защищены. Содержание можно свободно читать. Вы можете делиться цитатами или размышлениями автора из MarvinPro при условии, что вы публикуете полную атрибуцию точно так, как она появляется в тексте, включая цитату, имя автора, год и marvinpro.com. Копирование или воспроизведение других частей, целых разделов или глав без разрешения не допускается.

Report abuse
Page details
Page updated
Report abuse