Search this site
Embedded Files
  • LEADERSHIP
    • EN | Here is How to Think
      • 1 The Individual
        • 1.1 Use Your Moral Compass
        • 1.2 Predict
        • 1.3 Own It
        • 1.4 Aim High
        • 1.5 Work Hard
        • 1.6 Pause and Continue
        • 1.7 Do More With Less
      • 2 The Leader
        • 2.1 Invest
        • 2.2 Earn It
        • 2.3 Be Clear
        • 2.4 Read the Room
        • 2.5 Task Force vs Owner
        • 2.6 Knowledge in the Room
        • 2.7 The Perfectionist
      • 3 The Owner
        • 3.1 Timing
        • 3.2 The Window
        • 3.3 Broaden your Responsibility
        • 3.4 Attrition
        • 3.5 The Long Game
        • 3.6 Pause
        • 3.7 Balance
        • 3.8 Diversity (Bonus)
      • 4 The Visionary
        • 4.1 Time moves fast
        • 4.2 The Idea Behind the Idea
        • 4.3 Automate
        • 4.4 Think Big
        • 4.5 Build to Last
        • 4.6 Earn and Compound
        • 4.7 Invest by Acquisition
        • 4.8 Pay it Forward
      • 0 The Candidate
        • 0.1 Decide
        • 0.2 Research
        • 0.3 Prepare
        • 0.4 Be Disciplined
        • 0.5 Apply
        • 0.6 Convince
        • 0.7 Pass
    • ES | Aquí es Cómo Pensar
      • 1 El Individuo
        • 1.1 Usa tu Brújula Moral
        • 1.2 Predice
        • 1.3 Hazlo Tuyo
        • 1.4 Apunta Alto
        • 1.5 Trabaja Duro
        • 1.6 Pausa y Continúa
        • 1.7 Hacer Más Con Menos
      • 2 El Líder
        • 2.1 Invierte
        • 2.2 Gánatelo
        • 2.3 Sé claro
        • 2.4 Lee la Sala
        • 2.5 Fuerza de Tarea vs Propietario
        • 2.6 El Conocimiento en la Sala
        • 2.7 El Perfeccionista
      • 3 El Propietario
        • 3.1 El Momento
        • 3.2 La Ventana
        • 3.3 Amplía tu Responsabilidad
        • 3.4 Deserción
        • 3.5 El Juego Largo
        • 3.6 Pausa
        • 3.7 Equilibrio
        • 3.8 Diversidad
      • 4 El Visionario
        • 4.1 El Tiempo Avanza Rápido
        • 4.2 La Idea Detrás de la Idea
        • 4.3 Automatiza
        • 4.4 Piensa en Grande
        • 4.5 Construye para Durar
        • 4.6 Gana y Multiplica
        • 4.7 Invierte por Adquisición
        • 4.8 Devuelve el Favor
      • 0 El Candidato
        • 0.1 Decidir
        • 0.2 Investigar
        • 0.3 Preparar
        • 0.4 Sé Disciplinado
        • 0.5 Aplica
        • 0.6 Convence
        • 0.7 Supera
    • FR | Voici Comment Penser
      • 1 L’Individu
        • 1.1 Utilise ta Boussole Morale
        • 1.2 Prédire
        • 1.3 Prends-en la Responsabilité
        • 1.4 Vise Haut
        • 1.5 Travaille Dur
        • 1.6 Pause et Continue
        • 1.7 Faire Plus Avec Moins
      • 2 Le Leader
        • 2.1 Investis
        • 2.2 Mérite-le
        • 2.3 Sois Clair
        • 2.4 Lis la Salle
        • 2.5 Force de Travail vs Propriétaire
        • 2.6 La Connaissance dans la Salle
        • 2.7 Le Perfectionniste
      • 3 Le Propriétaire
        • 3.1 Le Moment
        • 3.2 La Fenêtre
        • 3.3 Élargis ta Responsabilité
        • 3.4 Attrition (FR)
        • 3.5 Le Jeu Long
        • 3.6 Pause (FR)
        • 3.7 Équilibre
        • 3.8 Diversité
      • 4 Le Visionnaire
        • 4.1 Le Temps Avance Vite
        • 4.2 L'Idée Derrière l'Idée
        • 4.3 Automatise
        • 4.4 Pense Grand
        • 4.5 Construire pour Durer
        • 4.6 Gagne et Compose
        • 4.7 Investis par Acquisition
        • 4.8 Rends la Pareille
      • 0 Le Candidat
        • 0.1 Décider
        • 0.2 Rechercher
        • 0.3 Préparer
        • 0.4 Soyez Discipliné
        • 0.5 Postulez
        • 0.6 Convainquez
        • 0.7 Passez
    • PT | Aqui é Como Pensar
      • 1 O Indivíduo
        • 1.1 Usa a Tua Bússola Moral
        • 1.2 Prevê
        • 1.3 Torna-o Teu
        • 1.4 Aponta Alto
        • 1.5 Trabalha Arduamente
        • 1.6 Pausa e Continua
        • 1.7 Faz Mais Com Menos
      • 2 O Líder
        • 2.1 Investe
        • 2.2 Mereça-o
        • 2.3 Sê Claro
        • 2.4 Lê a Sala
        • 2.5 Força-Tarefa vs Proprietário
        • 2.6 O Conhecimento na Sala
        • 2.7 O Perfeccionista
      • 3 O Proprietário
        • 3.1 O Momento
        • 3.2 A Janela
        • 3.3 Alarga a tua Responsabilidade
        • 3.4 Atrito
        • 3.5 O Jogo Longo
        • 3.6 Pausa (PT)
        • 3.7 Equilíbrio (PT)
        • 3.8 Diversidade
      • 4 O Visionário
        • 4.1 O Tempo Avança Rápido
        • 4.2 A Ideia por Trás da Ideia
        • 4.3 Automatiza (PT)
        • 4.4 Pensa Grande
        • 4.5 Construir para Durar
        • 4.6 Ganha e Multiplica
        • 4.7 Investe por Aquisição
        • 4.8 Retribui
      • 0 O Candidato
        • 0.1 Decidir (PT)
        • 0.2 Pesquisar
        • 0.3 Preparar (PT)
        • 0.4 Sê Disciplinado
        • 0.5 Candidate-se
        • 0.6 Convença
        • 0.7 Passa
    • RU | Вот как думать
      • 1 Индивидуум
        • 1.1 Используй свой Моральный Компас
        • 1.2 Предсказывай
        • 1.3 Возьми на Себя
        • 1.4 Целься Выше
        • 1.5 Работай Усердно
        • 1.6 Пауза и Продолжение
        • 1.7 Делай Больше С Меньшим
      • 2 Лидер
        • 2.1 Инвестируй
        • 2.2 Заслужи это
        • 2.3 Будь Ясным
        • 2.4 Читай Зал
        • 2.5 Рабочая Группа vs Владелец
        • 2.6 Знание в Зале
        • 2.7 Перфекционист
      • 3 Владелец
        • 3.1 Момент
        • 3.2 Окно
        • 3.3 Расширь свою Ответственность
        • 3.4 Текучесть Kадров
        • 3.5 Долгая Игра
        • 3.6 Пауза
        • 3.7 Баланс
        • 3.8 Разнообразие
      • 4 Визионер
        • 4.1 Время Движется Быстро
        • 4.2 Идея за Идеей
        • 4.3 Автоматизируй
        • 4.4 Думай Масштабно
        • 4.5 Строй на Долгое Время
        • 4.6 Зарабатывай и Умножай
        • 4.7 Инвестируй через Приобретение
        • 4.8 Передай Дальше
      • 0 Кандидат
        • 0.1 Решить
        • 0.2 Исследовать
        • 0.3 Подготовиться
        • 0.4 Будь Дисциплинированным
        • 0.5 Откликайтесь
        • 0.6 Убеждайте
        • 0.7 Пройдите
  • PROCESS
    • EN | Here is How to Build
      • EN | Design
        • EN | 1.1 Principles
          • 1.1.1 Did you Know?
          • 1.1.2 See
          • 1.1.3 Design
          • 1.1.4 Sign
          • 1.1.5 Prepare
          • 1.1.6 Run
          • 1.1.7 Support
        • EN | 1.2 Rules
          • 1.2.1.A Rule
          • 1.2.2 What
          • 1.2.3 How
          • 1.2.4 When
          • 1.2.5 Why
          • 1.2.6 Who
          • 1.2.7 A Sound Rule
          • 1.2.8 The Whole
        • EN | 1.3 Exceptions
          • 1.3.1.An Exception
          • 1.3.2 The What-If
          • 1.3.3 Scope In or Park
          • 1.3.4 The Way Forward
          • 1.3.5 Pre-Approved
          • 1.3.6 Escalate
          • 1.3.7 Fold It Back
          • 1.3.8 As Few As Possible
        • EN | 1.4 Core
          • 1.4.1 A Core Process
          • 1.4.2 The Frame
          • 1.4.3 The Direction (L1)
          • 1.4.4 The Backbone (L1→L3)
          • 1.4.5 The Handoffs
          • 1.4.6 Sign-Off
          • 1.4.7 Inherited
          • 1.4.8 The Core
        • EN | 1.5 Sub
          • 1.5.1 A Sub-Process
          • 1.5.2 Sub or Step
          • 1.5.3 Cutting Clean
          • 1.5.4 Place
          • 1.5.5 Function
          • 1.5.6 The Seams Within
          • 1.5.7 Drift
          • 1.5.8 Sub-Processes
      • EN | Operate
      • EN | Change
      • EN | Control
      • EN | Govern
      • EN | Diagnose
      • EN | Master
    • ES | Aquí es Cómo Construir
      • ES | Diseño
        • ES | 1.1 Principios
          • 1.1.1 ¿Sabías Que?
          • 1.1.2 Ver
          • 1.1.3 Diseñar
          • 1.1.4 Firmar
          • 1.1.5 Preparar
          • 1.1.6 Ejecutar
          • 1.1.7 Apoyar
        • ES | 1.2 Reglas
          • 1.2.1 Una Regla
          • 1.2.2 Qué
          • 1.2.3 Cómo
          • 1.2.4 Cuándo
          • 1.2.5 Por Qué
          • 1.2.6 Quién
          • 1.2.7 Una Regla Sólida
          • 1.2.8 El Todo
        • ES | 1.3 Excepciones
          • 1.3.1.Una Excepción
          • 1.3.2 El Qué Pasaría Si
          • 1.3.3 Incorporar o Aparcar
          • 1.3.4 El Camino a Seguir
          • 1.3.5 Preaprobado
          • 1.3.6 Escalar
          • 1.3.7 Reincorporar
          • 1.3.8 Tan Pocas Como Sea Posible
        • ES | 1.4 Núcleo
          • 1.4.1 Un Proceso Central
          • 1.4.2 El Marco
          • 1.4.3 La Dirección (L1)
          • 1.4.4 La Columna Vertebral (L1→L3)
          • 1.4.5 Los Traspasos
          • 1.4.6 La Aprobación
          • 1.4.7 Heredado
          • 1.4.8 El Central
        • ES | 1.5 Sub
          • 1.5.1 Un Subproceso
          • 1.5.2 Sub o Paso
          • 1.5.3 Cortar Limpio
          • 1.5.4 Situar
          • 1.5.5 Función
          • 1.5.6 Las Costuras Internas
          • 1.5.7 Deriva
          • 1.5.8 Subprocesos
    • FR | Ici, c'est Comment Construire
      • FR | Conception
        • FR | 1.1 Principes
          • 1.1.1 Le saviez-vous ?
          • 1.1.2 Voir
          • 1.1.3 Concevoir
          • 1.1.4 Signer
          • 1.1.5 Préparer
          • 1.1.6 Exécuter
          • 1.1.7 Soutenir
        • FR | 1.2 Règles
          • 1.2.1 Une Règle
          • 1.2.2 Quoi
          • 1.2.3 Comment
          • 1.2.4 Quand
          • 1.2.5 Pourquoi
          • 1.2.6 Qui
          • 1.2.7 Une Règle Solide
          • 1.2.8 Le Tout
        • FR | 1.3 Exceptions
          • 1.3.1.Une Exception
          • 1.3.2 Le Et Si
          • 1.3.3 Intégrer ou Mettre de Côté
          • 1.3.4 Le Chemin à Suivre
          • 1.3.5 Préapprouvé
          • 1.3.6 Escalader
          • 1.3.7 Replier
          • 1.3.8 Aussi Peu Que Possible
        • FR | 1.4 Noyau
          • 1.4.1 Un Processus Central
          • 1.4.2 Le Cadre
          • 1.4.3 La Direction (L1)
          • 1.4.4 La Colonne Vertébrale (L1→L3)
          • 1.4.5 Les Passations
          • 1.4.6 La Validation
          • 1.4.7 Hérité
          • 1.4.8 Le Central
        • FR | 1.5 Sous
          • 1.5.1 Un Sous-Processus
          • 1.5.2 Sous ou Étape
          • 1.5.3 Découper Proprement
          • 1.5.4 Situer
          • 1.5.5 Fonction
          • 1.5.6 Les Coutures Internes
          • 1.5.7 Dérive
    • PT | Aqui é Como Construir
      • PT | Design
        • PT | 1.1 Princípios
          • 1.1.1 Sabias?
          • 1.1.2 Ver (PT)
          • 1.1.3 Design (PT)
          • 1.1.4 Assinar
          • 1.1.5 Preparar (PT)
          • 1.1.6 Executar
          • 1.1.7 Apoiar
        • PT | 1.2 Regras
          • 1.2.1 Uma Regra
          • 1.2.2 O quê
          • 1.2.3 Como
          • 1.2.4 Quando
          • 1.2.5 Por Que
          • 1.2.6 Quem
          • 1.2.7 Uma Regra Sólida
          • 1.2.8 O Todo
        • PT | 1.3 Exceções
          • 1.3.1.Uma Exceção
          • 1.3.2 O E Se
          • 1.3.3 Incorporar ou Pôr de Lado
          • 1.3.4 O Caminho a Seguir
          • 1.3.5 Pré-Aprovado
          • 1.3.6 Escalonar
          • 1.3.7 Dobrar de Volta
          • 1.3.8 Tão Poucas Quanto Possível
        • PT | 1.4 Núcleo
          • 1.4.1 Um Processo Central
          • 1.4.2 O Enquadramento
          • 1.4.3 A Direção (L1)
          • 1.4.4 A Coluna Vertebral (L1→L3)
          • 1.4.5 Transferências
          • 1.4.6 A Aprovação
          • 1.4.7 Herdado
          • 1.4.8 O Central
        • PT | 1.5 Sub
          • 1.5.1 Um Subprocesso
          • 1.5.2 Sub ou Passo
          • 1.5.3 Cortar Limpo
          • 1.5.4 Situar PT
          • 1.5.5 Função
          • 1.5.6 As Costuras Internas
          • 1.5.7 Deriva PT
    • RU | Вот Как Строить
      • RU | Проектирование
        • RU | 1.1 Принципы
          • 1.1.1 А вы знали?
          • 1.1.2 Видеть
          • 1.1.3 Проектировать
          • 1.1.4 Подписывать
          • 1.1.5 Подготавливать
          • 1.1.6 Запускать
          • 1.1.7 Поддерживать
        • RU | 1.2 Правила
          • 1.2.1 Правило
          • 1.2.2 Что
          • 1.2.3 Как
          • 1.2.4 Когда
          • 1.2.5 Почему
          • 1.2.6 Кто
          • 1.2.7 Прочное Правило
          • 1.2.8 Целое
        • RU | 1.3 Исключения
          • 1.3.1.Исключение
          • 1.3.2 Что Если
          • 1.3.3 Включить или Отложить
          • 1.3.4 Путь Вперёд
          • 1.3.5 Предварительно Одобренное
          • 1.3.6 Эскалировать
          • 1.3.7 Свернуть Обратно
          • 1.3.8 Так Мало, Как Возможно
        • RU | 1.4 Ядро
          • 1.4.1 Основной Процесс
          • 1.4.2 Рамка
          • 1.4.3 Направление (L1)
          • 1.4.4 Хребет (L1→L3)
          • 1.4.5 Передачи
          • 1.4.6 Утверждение
          • 1.4.7 Унаследованное
          • 1.4.8 Основной
        • RU | 1.5 Суб
          • 1.5.1 Подпроцесс
          • 1.5.2 Суб или Шаг
          • 1.5.3 Резать Чисто
          • 1.5.4 Разместить
          • 1.5.5 Функция
          • 1.5.6 Внутренние Швы
          • 1.5.7 Дрейф
    • EN | Migration
      • CHAPTER 1. Why Processes Drive Transformation
      • CHAPTER 2. From Steps to System by MarvinPro
      • CHAPTER 3. Phases by MarvinPro
      • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
      • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
      • CHAPTER 6. What Makes Migration Successful by MarvinPro
    • EN | Migration S/4HANA Edition
      • 1. Why Processes Drive Transformation by MarvinPro
      • 2. Design Phase — Building for Scale by MarvinPro
      • 3. Core Functional Domains
      • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
      • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
      • 6. What Makes Migration Successful by MarvinPro
    • EN | Exceptions
      • 1. Why Exceptions Define by MarvinPro
      • 2. What Is an Exception
      • 3. Designing for Exceptions
      • 4. Operating Under Pressure
      • 5. Recovery and Stabilisation
      • 6. Learning from Exceptions
      • 7. The Exception-Ready Organisation
      • 8. The Future of Exception Handling by MarvinPro
    • PROCESSES COLLECTION
      • PROCESS Catalog
  • STORIES
    • EN | The CEO
      • CHAPTER 0. Prologue
      • CHAPTER 1. Day One
      • CHAPTER 2. The Room
      • CHAPTER 3. The Pressure
      • CHAPTER 4. The Presentation
      • CHAPTER 5. The Contract
      • CHAPTER 6. The Transfer
      • CHAPTER 7. The Script
      • CHAPTER 8. The Distance
      • CHAPTER 9. The Customer Who Knows More
      • CHAPTER 10. The Knowledge That Left
      • CHAPTER 11. The Culture Nobody Transferred
      • CHAPTER 12. The Friend
      • CHAPTER 13. The Invisible Wall
      • CHAPTER 14. The Manager Who Performs Upward
      • Coming Soon
    • ES | El CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. El Primer Día
      • CAPÍTULO 2. La Sala
      • CAPÍTULO 3. La Presión
      • CAPÍTULO 4. La Presentación
      • CAPÍTULO 5. El Contrato
      • CAPÍTULO 6. La Transferencia
      • CAPÍTULO 7. El Guión
      • CAPÍTULO 8. La Distancia
      • CAPÍTULO 9. La Clienta Que Sabe Más
      • CAPÍTULO 10. El Conocimiento Que Se Fue
      • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
      • Próximamente
    • FR | Le CEO
      • CHAPITRE 0. Prologue
      • CHAPITRE 1. Jour Un
      • CHAPITRE 2. La Salle
      • CHAPITRE 3. La Pression
      • CHAPITRE 4. La Présentation
      • CHAPITRE 5. Le Contrat
      • CHAPITRE 6. Le Transfert
      • CHAPITRE 7. Le Script
      • CHAPITRE 8. La Distance
      • CHAPITRE 9. La Cliente Qui En Sait Plus
      • CHAPITRE 10. Le Savoir Qui Est Parti
      • CHAPITRE 11. La Culture Que Personne N'a Transférée
      • Bientôt Disponible
    • PT | O CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. Dia Um
      • CAPÍTULO 2. A Sala
      • CAPÍTULO 3. A Pressão
      • CAPÍTULO 4. A Apresentação
      • CAPÍTULO 5. O Contrato
      • CAPÍTULO 6. A Transferência
      • CAPÍTULO 7. O Guião
      • CAPÍTULO 8. A Distância
      • CAPÍTULO 9. A Cliente Que Sabe Mais
      • CAPÍTULO 10. O Conhecimento Que Partiu
      • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
      • Em Breve
    • RU | ГД
      • ГЛАВА 0. ПРОЛОГ
      • ГЛАВА 1. День первый
      • ГЛАВА 2. Комната
      • ГЛАВА 3. Давление
      • ГЛАВА 4. Презентация
      • ГЛАВА 5. Контракт
      • ГЛАВА 6. Перевод
      • ГЛАВА 7. Сценарий
      • ГЛАВА 8. Дистанция
      • ГЛАВА 9. Клиент, который знает больше
      • ГЛАВА 10. Знание, которое ушло
      • ГЛАВА 11. Культура, которую никто не передал
      • Скоро будет доступно
 
  • LEADERSHIP
    • EN | Here is How to Think
      • 1 The Individual
        • 1.1 Use Your Moral Compass
        • 1.2 Predict
        • 1.3 Own It
        • 1.4 Aim High
        • 1.5 Work Hard
        • 1.6 Pause and Continue
        • 1.7 Do More With Less
      • 2 The Leader
        • 2.1 Invest
        • 2.2 Earn It
        • 2.3 Be Clear
        • 2.4 Read the Room
        • 2.5 Task Force vs Owner
        • 2.6 Knowledge in the Room
        • 2.7 The Perfectionist
      • 3 The Owner
        • 3.1 Timing
        • 3.2 The Window
        • 3.3 Broaden your Responsibility
        • 3.4 Attrition
        • 3.5 The Long Game
        • 3.6 Pause
        • 3.7 Balance
        • 3.8 Diversity (Bonus)
      • 4 The Visionary
        • 4.1 Time moves fast
        • 4.2 The Idea Behind the Idea
        • 4.3 Automate
        • 4.4 Think Big
        • 4.5 Build to Last
        • 4.6 Earn and Compound
        • 4.7 Invest by Acquisition
        • 4.8 Pay it Forward
      • 0 The Candidate
        • 0.1 Decide
        • 0.2 Research
        • 0.3 Prepare
        • 0.4 Be Disciplined
        • 0.5 Apply
        • 0.6 Convince
        • 0.7 Pass
    • ES | Aquí es Cómo Pensar
      • 1 El Individuo
        • 1.1 Usa tu Brújula Moral
        • 1.2 Predice
        • 1.3 Hazlo Tuyo
        • 1.4 Apunta Alto
        • 1.5 Trabaja Duro
        • 1.6 Pausa y Continúa
        • 1.7 Hacer Más Con Menos
      • 2 El Líder
        • 2.1 Invierte
        • 2.2 Gánatelo
        • 2.3 Sé claro
        • 2.4 Lee la Sala
        • 2.5 Fuerza de Tarea vs Propietario
        • 2.6 El Conocimiento en la Sala
        • 2.7 El Perfeccionista
      • 3 El Propietario
        • 3.1 El Momento
        • 3.2 La Ventana
        • 3.3 Amplía tu Responsabilidad
        • 3.4 Deserción
        • 3.5 El Juego Largo
        • 3.6 Pausa
        • 3.7 Equilibrio
        • 3.8 Diversidad
      • 4 El Visionario
        • 4.1 El Tiempo Avanza Rápido
        • 4.2 La Idea Detrás de la Idea
        • 4.3 Automatiza
        • 4.4 Piensa en Grande
        • 4.5 Construye para Durar
        • 4.6 Gana y Multiplica
        • 4.7 Invierte por Adquisición
        • 4.8 Devuelve el Favor
      • 0 El Candidato
        • 0.1 Decidir
        • 0.2 Investigar
        • 0.3 Preparar
        • 0.4 Sé Disciplinado
        • 0.5 Aplica
        • 0.6 Convence
        • 0.7 Supera
    • FR | Voici Comment Penser
      • 1 L’Individu
        • 1.1 Utilise ta Boussole Morale
        • 1.2 Prédire
        • 1.3 Prends-en la Responsabilité
        • 1.4 Vise Haut
        • 1.5 Travaille Dur
        • 1.6 Pause et Continue
        • 1.7 Faire Plus Avec Moins
      • 2 Le Leader
        • 2.1 Investis
        • 2.2 Mérite-le
        • 2.3 Sois Clair
        • 2.4 Lis la Salle
        • 2.5 Force de Travail vs Propriétaire
        • 2.6 La Connaissance dans la Salle
        • 2.7 Le Perfectionniste
      • 3 Le Propriétaire
        • 3.1 Le Moment
        • 3.2 La Fenêtre
        • 3.3 Élargis ta Responsabilité
        • 3.4 Attrition (FR)
        • 3.5 Le Jeu Long
        • 3.6 Pause (FR)
        • 3.7 Équilibre
        • 3.8 Diversité
      • 4 Le Visionnaire
        • 4.1 Le Temps Avance Vite
        • 4.2 L'Idée Derrière l'Idée
        • 4.3 Automatise
        • 4.4 Pense Grand
        • 4.5 Construire pour Durer
        • 4.6 Gagne et Compose
        • 4.7 Investis par Acquisition
        • 4.8 Rends la Pareille
      • 0 Le Candidat
        • 0.1 Décider
        • 0.2 Rechercher
        • 0.3 Préparer
        • 0.4 Soyez Discipliné
        • 0.5 Postulez
        • 0.6 Convainquez
        • 0.7 Passez
    • PT | Aqui é Como Pensar
      • 1 O Indivíduo
        • 1.1 Usa a Tua Bússola Moral
        • 1.2 Prevê
        • 1.3 Torna-o Teu
        • 1.4 Aponta Alto
        • 1.5 Trabalha Arduamente
        • 1.6 Pausa e Continua
        • 1.7 Faz Mais Com Menos
      • 2 O Líder
        • 2.1 Investe
        • 2.2 Mereça-o
        • 2.3 Sê Claro
        • 2.4 Lê a Sala
        • 2.5 Força-Tarefa vs Proprietário
        • 2.6 O Conhecimento na Sala
        • 2.7 O Perfeccionista
      • 3 O Proprietário
        • 3.1 O Momento
        • 3.2 A Janela
        • 3.3 Alarga a tua Responsabilidade
        • 3.4 Atrito
        • 3.5 O Jogo Longo
        • 3.6 Pausa (PT)
        • 3.7 Equilíbrio (PT)
        • 3.8 Diversidade
      • 4 O Visionário
        • 4.1 O Tempo Avança Rápido
        • 4.2 A Ideia por Trás da Ideia
        • 4.3 Automatiza (PT)
        • 4.4 Pensa Grande
        • 4.5 Construir para Durar
        • 4.6 Ganha e Multiplica
        • 4.7 Investe por Aquisição
        • 4.8 Retribui
      • 0 O Candidato
        • 0.1 Decidir (PT)
        • 0.2 Pesquisar
        • 0.3 Preparar (PT)
        • 0.4 Sê Disciplinado
        • 0.5 Candidate-se
        • 0.6 Convença
        • 0.7 Passa
    • RU | Вот как думать
      • 1 Индивидуум
        • 1.1 Используй свой Моральный Компас
        • 1.2 Предсказывай
        • 1.3 Возьми на Себя
        • 1.4 Целься Выше
        • 1.5 Работай Усердно
        • 1.6 Пауза и Продолжение
        • 1.7 Делай Больше С Меньшим
      • 2 Лидер
        • 2.1 Инвестируй
        • 2.2 Заслужи это
        • 2.3 Будь Ясным
        • 2.4 Читай Зал
        • 2.5 Рабочая Группа vs Владелец
        • 2.6 Знание в Зале
        • 2.7 Перфекционист
      • 3 Владелец
        • 3.1 Момент
        • 3.2 Окно
        • 3.3 Расширь свою Ответственность
        • 3.4 Текучесть Kадров
        • 3.5 Долгая Игра
        • 3.6 Пауза
        • 3.7 Баланс
        • 3.8 Разнообразие
      • 4 Визионер
        • 4.1 Время Движется Быстро
        • 4.2 Идея за Идеей
        • 4.3 Автоматизируй
        • 4.4 Думай Масштабно
        • 4.5 Строй на Долгое Время
        • 4.6 Зарабатывай и Умножай
        • 4.7 Инвестируй через Приобретение
        • 4.8 Передай Дальше
      • 0 Кандидат
        • 0.1 Решить
        • 0.2 Исследовать
        • 0.3 Подготовиться
        • 0.4 Будь Дисциплинированным
        • 0.5 Откликайтесь
        • 0.6 Убеждайте
        • 0.7 Пройдите
  • PROCESS
    • EN | Here is How to Build
      • EN | Design
        • EN | 1.1 Principles
          • 1.1.1 Did you Know?
          • 1.1.2 See
          • 1.1.3 Design
          • 1.1.4 Sign
          • 1.1.5 Prepare
          • 1.1.6 Run
          • 1.1.7 Support
        • EN | 1.2 Rules
          • 1.2.1.A Rule
          • 1.2.2 What
          • 1.2.3 How
          • 1.2.4 When
          • 1.2.5 Why
          • 1.2.6 Who
          • 1.2.7 A Sound Rule
          • 1.2.8 The Whole
        • EN | 1.3 Exceptions
          • 1.3.1.An Exception
          • 1.3.2 The What-If
          • 1.3.3 Scope In or Park
          • 1.3.4 The Way Forward
          • 1.3.5 Pre-Approved
          • 1.3.6 Escalate
          • 1.3.7 Fold It Back
          • 1.3.8 As Few As Possible
        • EN | 1.4 Core
          • 1.4.1 A Core Process
          • 1.4.2 The Frame
          • 1.4.3 The Direction (L1)
          • 1.4.4 The Backbone (L1→L3)
          • 1.4.5 The Handoffs
          • 1.4.6 Sign-Off
          • 1.4.7 Inherited
          • 1.4.8 The Core
        • EN | 1.5 Sub
          • 1.5.1 A Sub-Process
          • 1.5.2 Sub or Step
          • 1.5.3 Cutting Clean
          • 1.5.4 Place
          • 1.5.5 Function
          • 1.5.6 The Seams Within
          • 1.5.7 Drift
          • 1.5.8 Sub-Processes
      • EN | Operate
      • EN | Change
      • EN | Control
      • EN | Govern
      • EN | Diagnose
      • EN | Master
    • ES | Aquí es Cómo Construir
      • ES | Diseño
        • ES | 1.1 Principios
          • 1.1.1 ¿Sabías Que?
          • 1.1.2 Ver
          • 1.1.3 Diseñar
          • 1.1.4 Firmar
          • 1.1.5 Preparar
          • 1.1.6 Ejecutar
          • 1.1.7 Apoyar
        • ES | 1.2 Reglas
          • 1.2.1 Una Regla
          • 1.2.2 Qué
          • 1.2.3 Cómo
          • 1.2.4 Cuándo
          • 1.2.5 Por Qué
          • 1.2.6 Quién
          • 1.2.7 Una Regla Sólida
          • 1.2.8 El Todo
        • ES | 1.3 Excepciones
          • 1.3.1.Una Excepción
          • 1.3.2 El Qué Pasaría Si
          • 1.3.3 Incorporar o Aparcar
          • 1.3.4 El Camino a Seguir
          • 1.3.5 Preaprobado
          • 1.3.6 Escalar
          • 1.3.7 Reincorporar
          • 1.3.8 Tan Pocas Como Sea Posible
        • ES | 1.4 Núcleo
          • 1.4.1 Un Proceso Central
          • 1.4.2 El Marco
          • 1.4.3 La Dirección (L1)
          • 1.4.4 La Columna Vertebral (L1→L3)
          • 1.4.5 Los Traspasos
          • 1.4.6 La Aprobación
          • 1.4.7 Heredado
          • 1.4.8 El Central
        • ES | 1.5 Sub
          • 1.5.1 Un Subproceso
          • 1.5.2 Sub o Paso
          • 1.5.3 Cortar Limpio
          • 1.5.4 Situar
          • 1.5.5 Función
          • 1.5.6 Las Costuras Internas
          • 1.5.7 Deriva
          • 1.5.8 Subprocesos
    • FR | Ici, c'est Comment Construire
      • FR | Conception
        • FR | 1.1 Principes
          • 1.1.1 Le saviez-vous ?
          • 1.1.2 Voir
          • 1.1.3 Concevoir
          • 1.1.4 Signer
          • 1.1.5 Préparer
          • 1.1.6 Exécuter
          • 1.1.7 Soutenir
        • FR | 1.2 Règles
          • 1.2.1 Une Règle
          • 1.2.2 Quoi
          • 1.2.3 Comment
          • 1.2.4 Quand
          • 1.2.5 Pourquoi
          • 1.2.6 Qui
          • 1.2.7 Une Règle Solide
          • 1.2.8 Le Tout
        • FR | 1.3 Exceptions
          • 1.3.1.Une Exception
          • 1.3.2 Le Et Si
          • 1.3.3 Intégrer ou Mettre de Côté
          • 1.3.4 Le Chemin à Suivre
          • 1.3.5 Préapprouvé
          • 1.3.6 Escalader
          • 1.3.7 Replier
          • 1.3.8 Aussi Peu Que Possible
        • FR | 1.4 Noyau
          • 1.4.1 Un Processus Central
          • 1.4.2 Le Cadre
          • 1.4.3 La Direction (L1)
          • 1.4.4 La Colonne Vertébrale (L1→L3)
          • 1.4.5 Les Passations
          • 1.4.6 La Validation
          • 1.4.7 Hérité
          • 1.4.8 Le Central
        • FR | 1.5 Sous
          • 1.5.1 Un Sous-Processus
          • 1.5.2 Sous ou Étape
          • 1.5.3 Découper Proprement
          • 1.5.4 Situer
          • 1.5.5 Fonction
          • 1.5.6 Les Coutures Internes
          • 1.5.7 Dérive
    • PT | Aqui é Como Construir
      • PT | Design
        • PT | 1.1 Princípios
          • 1.1.1 Sabias?
          • 1.1.2 Ver (PT)
          • 1.1.3 Design (PT)
          • 1.1.4 Assinar
          • 1.1.5 Preparar (PT)
          • 1.1.6 Executar
          • 1.1.7 Apoiar
        • PT | 1.2 Regras
          • 1.2.1 Uma Regra
          • 1.2.2 O quê
          • 1.2.3 Como
          • 1.2.4 Quando
          • 1.2.5 Por Que
          • 1.2.6 Quem
          • 1.2.7 Uma Regra Sólida
          • 1.2.8 O Todo
        • PT | 1.3 Exceções
          • 1.3.1.Uma Exceção
          • 1.3.2 O E Se
          • 1.3.3 Incorporar ou Pôr de Lado
          • 1.3.4 O Caminho a Seguir
          • 1.3.5 Pré-Aprovado
          • 1.3.6 Escalonar
          • 1.3.7 Dobrar de Volta
          • 1.3.8 Tão Poucas Quanto Possível
        • PT | 1.4 Núcleo
          • 1.4.1 Um Processo Central
          • 1.4.2 O Enquadramento
          • 1.4.3 A Direção (L1)
          • 1.4.4 A Coluna Vertebral (L1→L3)
          • 1.4.5 Transferências
          • 1.4.6 A Aprovação
          • 1.4.7 Herdado
          • 1.4.8 O Central
        • PT | 1.5 Sub
          • 1.5.1 Um Subprocesso
          • 1.5.2 Sub ou Passo
          • 1.5.3 Cortar Limpo
          • 1.5.4 Situar PT
          • 1.5.5 Função
          • 1.5.6 As Costuras Internas
          • 1.5.7 Deriva PT
    • RU | Вот Как Строить
      • RU | Проектирование
        • RU | 1.1 Принципы
          • 1.1.1 А вы знали?
          • 1.1.2 Видеть
          • 1.1.3 Проектировать
          • 1.1.4 Подписывать
          • 1.1.5 Подготавливать
          • 1.1.6 Запускать
          • 1.1.7 Поддерживать
        • RU | 1.2 Правила
          • 1.2.1 Правило
          • 1.2.2 Что
          • 1.2.3 Как
          • 1.2.4 Когда
          • 1.2.5 Почему
          • 1.2.6 Кто
          • 1.2.7 Прочное Правило
          • 1.2.8 Целое
        • RU | 1.3 Исключения
          • 1.3.1.Исключение
          • 1.3.2 Что Если
          • 1.3.3 Включить или Отложить
          • 1.3.4 Путь Вперёд
          • 1.3.5 Предварительно Одобренное
          • 1.3.6 Эскалировать
          • 1.3.7 Свернуть Обратно
          • 1.3.8 Так Мало, Как Возможно
        • RU | 1.4 Ядро
          • 1.4.1 Основной Процесс
          • 1.4.2 Рамка
          • 1.4.3 Направление (L1)
          • 1.4.4 Хребет (L1→L3)
          • 1.4.5 Передачи
          • 1.4.6 Утверждение
          • 1.4.7 Унаследованное
          • 1.4.8 Основной
        • RU | 1.5 Суб
          • 1.5.1 Подпроцесс
          • 1.5.2 Суб или Шаг
          • 1.5.3 Резать Чисто
          • 1.5.4 Разместить
          • 1.5.5 Функция
          • 1.5.6 Внутренние Швы
          • 1.5.7 Дрейф
    • EN | Migration
      • CHAPTER 1. Why Processes Drive Transformation
      • CHAPTER 2. From Steps to System by MarvinPro
      • CHAPTER 3. Phases by MarvinPro
      • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
      • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
      • CHAPTER 6. What Makes Migration Successful by MarvinPro
    • EN | Migration S/4HANA Edition
      • 1. Why Processes Drive Transformation by MarvinPro
      • 2. Design Phase — Building for Scale by MarvinPro
      • 3. Core Functional Domains
      • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
      • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
      • 6. What Makes Migration Successful by MarvinPro
    • EN | Exceptions
      • 1. Why Exceptions Define by MarvinPro
      • 2. What Is an Exception
      • 3. Designing for Exceptions
      • 4. Operating Under Pressure
      • 5. Recovery and Stabilisation
      • 6. Learning from Exceptions
      • 7. The Exception-Ready Organisation
      • 8. The Future of Exception Handling by MarvinPro
    • PROCESSES COLLECTION
      • PROCESS Catalog
  • STORIES
    • EN | The CEO
      • CHAPTER 0. Prologue
      • CHAPTER 1. Day One
      • CHAPTER 2. The Room
      • CHAPTER 3. The Pressure
      • CHAPTER 4. The Presentation
      • CHAPTER 5. The Contract
      • CHAPTER 6. The Transfer
      • CHAPTER 7. The Script
      • CHAPTER 8. The Distance
      • CHAPTER 9. The Customer Who Knows More
      • CHAPTER 10. The Knowledge That Left
      • CHAPTER 11. The Culture Nobody Transferred
      • CHAPTER 12. The Friend
      • CHAPTER 13. The Invisible Wall
      • CHAPTER 14. The Manager Who Performs Upward
      • Coming Soon
    • ES | El CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. El Primer Día
      • CAPÍTULO 2. La Sala
      • CAPÍTULO 3. La Presión
      • CAPÍTULO 4. La Presentación
      • CAPÍTULO 5. El Contrato
      • CAPÍTULO 6. La Transferencia
      • CAPÍTULO 7. El Guión
      • CAPÍTULO 8. La Distancia
      • CAPÍTULO 9. La Clienta Que Sabe Más
      • CAPÍTULO 10. El Conocimiento Que Se Fue
      • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
      • Próximamente
    • FR | Le CEO
      • CHAPITRE 0. Prologue
      • CHAPITRE 1. Jour Un
      • CHAPITRE 2. La Salle
      • CHAPITRE 3. La Pression
      • CHAPITRE 4. La Présentation
      • CHAPITRE 5. Le Contrat
      • CHAPITRE 6. Le Transfert
      • CHAPITRE 7. Le Script
      • CHAPITRE 8. La Distance
      • CHAPITRE 9. La Cliente Qui En Sait Plus
      • CHAPITRE 10. Le Savoir Qui Est Parti
      • CHAPITRE 11. La Culture Que Personne N'a Transférée
      • Bientôt Disponible
    • PT | O CEO
      • CAPÍTULO 0. Prólogo
      • CAPÍTULO 1. Dia Um
      • CAPÍTULO 2. A Sala
      • CAPÍTULO 3. A Pressão
      • CAPÍTULO 4. A Apresentação
      • CAPÍTULO 5. O Contrato
      • CAPÍTULO 6. A Transferência
      • CAPÍTULO 7. O Guião
      • CAPÍTULO 8. A Distância
      • CAPÍTULO 9. A Cliente Que Sabe Mais
      • CAPÍTULO 10. O Conhecimento Que Partiu
      • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
      • Em Breve
    • RU | ГД
      • ГЛАВА 0. ПРОЛОГ
      • ГЛАВА 1. День первый
      • ГЛАВА 2. Комната
      • ГЛАВА 3. Давление
      • ГЛАВА 4. Презентация
      • ГЛАВА 5. Контракт
      • ГЛАВА 6. Перевод
      • ГЛАВА 7. Сценарий
      • ГЛАВА 8. Дистанция
      • ГЛАВА 9. Клиент, который знает больше
      • ГЛАВА 10. Знание, которое ушло
      • ГЛАВА 11. Культура, которую никто не передал
      • Скоро будет доступно
  • More
    • LEADERSHIP
      • EN | Here is How to Think
        • 1 The Individual
          • 1.1 Use Your Moral Compass
          • 1.2 Predict
          • 1.3 Own It
          • 1.4 Aim High
          • 1.5 Work Hard
          • 1.6 Pause and Continue
          • 1.7 Do More With Less
        • 2 The Leader
          • 2.1 Invest
          • 2.2 Earn It
          • 2.3 Be Clear
          • 2.4 Read the Room
          • 2.5 Task Force vs Owner
          • 2.6 Knowledge in the Room
          • 2.7 The Perfectionist
        • 3 The Owner
          • 3.1 Timing
          • 3.2 The Window
          • 3.3 Broaden your Responsibility
          • 3.4 Attrition
          • 3.5 The Long Game
          • 3.6 Pause
          • 3.7 Balance
          • 3.8 Diversity (Bonus)
        • 4 The Visionary
          • 4.1 Time moves fast
          • 4.2 The Idea Behind the Idea
          • 4.3 Automate
          • 4.4 Think Big
          • 4.5 Build to Last
          • 4.6 Earn and Compound
          • 4.7 Invest by Acquisition
          • 4.8 Pay it Forward
        • 0 The Candidate
          • 0.1 Decide
          • 0.2 Research
          • 0.3 Prepare
          • 0.4 Be Disciplined
          • 0.5 Apply
          • 0.6 Convince
          • 0.7 Pass
      • ES | Aquí es Cómo Pensar
        • 1 El Individuo
          • 1.1 Usa tu Brújula Moral
          • 1.2 Predice
          • 1.3 Hazlo Tuyo
          • 1.4 Apunta Alto
          • 1.5 Trabaja Duro
          • 1.6 Pausa y Continúa
          • 1.7 Hacer Más Con Menos
        • 2 El Líder
          • 2.1 Invierte
          • 2.2 Gánatelo
          • 2.3 Sé claro
          • 2.4 Lee la Sala
          • 2.5 Fuerza de Tarea vs Propietario
          • 2.6 El Conocimiento en la Sala
          • 2.7 El Perfeccionista
        • 3 El Propietario
          • 3.1 El Momento
          • 3.2 La Ventana
          • 3.3 Amplía tu Responsabilidad
          • 3.4 Deserción
          • 3.5 El Juego Largo
          • 3.6 Pausa
          • 3.7 Equilibrio
          • 3.8 Diversidad
        • 4 El Visionario
          • 4.1 El Tiempo Avanza Rápido
          • 4.2 La Idea Detrás de la Idea
          • 4.3 Automatiza
          • 4.4 Piensa en Grande
          • 4.5 Construye para Durar
          • 4.6 Gana y Multiplica
          • 4.7 Invierte por Adquisición
          • 4.8 Devuelve el Favor
        • 0 El Candidato
          • 0.1 Decidir
          • 0.2 Investigar
          • 0.3 Preparar
          • 0.4 Sé Disciplinado
          • 0.5 Aplica
          • 0.6 Convence
          • 0.7 Supera
      • FR | Voici Comment Penser
        • 1 L’Individu
          • 1.1 Utilise ta Boussole Morale
          • 1.2 Prédire
          • 1.3 Prends-en la Responsabilité
          • 1.4 Vise Haut
          • 1.5 Travaille Dur
          • 1.6 Pause et Continue
          • 1.7 Faire Plus Avec Moins
        • 2 Le Leader
          • 2.1 Investis
          • 2.2 Mérite-le
          • 2.3 Sois Clair
          • 2.4 Lis la Salle
          • 2.5 Force de Travail vs Propriétaire
          • 2.6 La Connaissance dans la Salle
          • 2.7 Le Perfectionniste
        • 3 Le Propriétaire
          • 3.1 Le Moment
          • 3.2 La Fenêtre
          • 3.3 Élargis ta Responsabilité
          • 3.4 Attrition (FR)
          • 3.5 Le Jeu Long
          • 3.6 Pause (FR)
          • 3.7 Équilibre
          • 3.8 Diversité
        • 4 Le Visionnaire
          • 4.1 Le Temps Avance Vite
          • 4.2 L'Idée Derrière l'Idée
          • 4.3 Automatise
          • 4.4 Pense Grand
          • 4.5 Construire pour Durer
          • 4.6 Gagne et Compose
          • 4.7 Investis par Acquisition
          • 4.8 Rends la Pareille
        • 0 Le Candidat
          • 0.1 Décider
          • 0.2 Rechercher
          • 0.3 Préparer
          • 0.4 Soyez Discipliné
          • 0.5 Postulez
          • 0.6 Convainquez
          • 0.7 Passez
      • PT | Aqui é Como Pensar
        • 1 O Indivíduo
          • 1.1 Usa a Tua Bússola Moral
          • 1.2 Prevê
          • 1.3 Torna-o Teu
          • 1.4 Aponta Alto
          • 1.5 Trabalha Arduamente
          • 1.6 Pausa e Continua
          • 1.7 Faz Mais Com Menos
        • 2 O Líder
          • 2.1 Investe
          • 2.2 Mereça-o
          • 2.3 Sê Claro
          • 2.4 Lê a Sala
          • 2.5 Força-Tarefa vs Proprietário
          • 2.6 O Conhecimento na Sala
          • 2.7 O Perfeccionista
        • 3 O Proprietário
          • 3.1 O Momento
          • 3.2 A Janela
          • 3.3 Alarga a tua Responsabilidade
          • 3.4 Atrito
          • 3.5 O Jogo Longo
          • 3.6 Pausa (PT)
          • 3.7 Equilíbrio (PT)
          • 3.8 Diversidade
        • 4 O Visionário
          • 4.1 O Tempo Avança Rápido
          • 4.2 A Ideia por Trás da Ideia
          • 4.3 Automatiza (PT)
          • 4.4 Pensa Grande
          • 4.5 Construir para Durar
          • 4.6 Ganha e Multiplica
          • 4.7 Investe por Aquisição
          • 4.8 Retribui
        • 0 O Candidato
          • 0.1 Decidir (PT)
          • 0.2 Pesquisar
          • 0.3 Preparar (PT)
          • 0.4 Sê Disciplinado
          • 0.5 Candidate-se
          • 0.6 Convença
          • 0.7 Passa
      • RU | Вот как думать
        • 1 Индивидуум
          • 1.1 Используй свой Моральный Компас
          • 1.2 Предсказывай
          • 1.3 Возьми на Себя
          • 1.4 Целься Выше
          • 1.5 Работай Усердно
          • 1.6 Пауза и Продолжение
          • 1.7 Делай Больше С Меньшим
        • 2 Лидер
          • 2.1 Инвестируй
          • 2.2 Заслужи это
          • 2.3 Будь Ясным
          • 2.4 Читай Зал
          • 2.5 Рабочая Группа vs Владелец
          • 2.6 Знание в Зале
          • 2.7 Перфекционист
        • 3 Владелец
          • 3.1 Момент
          • 3.2 Окно
          • 3.3 Расширь свою Ответственность
          • 3.4 Текучесть Kадров
          • 3.5 Долгая Игра
          • 3.6 Пауза
          • 3.7 Баланс
          • 3.8 Разнообразие
        • 4 Визионер
          • 4.1 Время Движется Быстро
          • 4.2 Идея за Идеей
          • 4.3 Автоматизируй
          • 4.4 Думай Масштабно
          • 4.5 Строй на Долгое Время
          • 4.6 Зарабатывай и Умножай
          • 4.7 Инвестируй через Приобретение
          • 4.8 Передай Дальше
        • 0 Кандидат
          • 0.1 Решить
          • 0.2 Исследовать
          • 0.3 Подготовиться
          • 0.4 Будь Дисциплинированным
          • 0.5 Откликайтесь
          • 0.6 Убеждайте
          • 0.7 Пройдите
    • PROCESS
      • EN | Here is How to Build
        • EN | Design
          • EN | 1.1 Principles
            • 1.1.1 Did you Know?
            • 1.1.2 See
            • 1.1.3 Design
            • 1.1.4 Sign
            • 1.1.5 Prepare
            • 1.1.6 Run
            • 1.1.7 Support
          • EN | 1.2 Rules
            • 1.2.1.A Rule
            • 1.2.2 What
            • 1.2.3 How
            • 1.2.4 When
            • 1.2.5 Why
            • 1.2.6 Who
            • 1.2.7 A Sound Rule
            • 1.2.8 The Whole
          • EN | 1.3 Exceptions
            • 1.3.1.An Exception
            • 1.3.2 The What-If
            • 1.3.3 Scope In or Park
            • 1.3.4 The Way Forward
            • 1.3.5 Pre-Approved
            • 1.3.6 Escalate
            • 1.3.7 Fold It Back
            • 1.3.8 As Few As Possible
          • EN | 1.4 Core
            • 1.4.1 A Core Process
            • 1.4.2 The Frame
            • 1.4.3 The Direction (L1)
            • 1.4.4 The Backbone (L1→L3)
            • 1.4.5 The Handoffs
            • 1.4.6 Sign-Off
            • 1.4.7 Inherited
            • 1.4.8 The Core
          • EN | 1.5 Sub
            • 1.5.1 A Sub-Process
            • 1.5.2 Sub or Step
            • 1.5.3 Cutting Clean
            • 1.5.4 Place
            • 1.5.5 Function
            • 1.5.6 The Seams Within
            • 1.5.7 Drift
            • 1.5.8 Sub-Processes
        • EN | Operate
        • EN | Change
        • EN | Control
        • EN | Govern
        • EN | Diagnose
        • EN | Master
      • ES | Aquí es Cómo Construir
        • ES | Diseño
          • ES | 1.1 Principios
            • 1.1.1 ¿Sabías Que?
            • 1.1.2 Ver
            • 1.1.3 Diseñar
            • 1.1.4 Firmar
            • 1.1.5 Preparar
            • 1.1.6 Ejecutar
            • 1.1.7 Apoyar
          • ES | 1.2 Reglas
            • 1.2.1 Una Regla
            • 1.2.2 Qué
            • 1.2.3 Cómo
            • 1.2.4 Cuándo
            • 1.2.5 Por Qué
            • 1.2.6 Quién
            • 1.2.7 Una Regla Sólida
            • 1.2.8 El Todo
          • ES | 1.3 Excepciones
            • 1.3.1.Una Excepción
            • 1.3.2 El Qué Pasaría Si
            • 1.3.3 Incorporar o Aparcar
            • 1.3.4 El Camino a Seguir
            • 1.3.5 Preaprobado
            • 1.3.6 Escalar
            • 1.3.7 Reincorporar
            • 1.3.8 Tan Pocas Como Sea Posible
          • ES | 1.4 Núcleo
            • 1.4.1 Un Proceso Central
            • 1.4.2 El Marco
            • 1.4.3 La Dirección (L1)
            • 1.4.4 La Columna Vertebral (L1→L3)
            • 1.4.5 Los Traspasos
            • 1.4.6 La Aprobación
            • 1.4.7 Heredado
            • 1.4.8 El Central
          • ES | 1.5 Sub
            • 1.5.1 Un Subproceso
            • 1.5.2 Sub o Paso
            • 1.5.3 Cortar Limpio
            • 1.5.4 Situar
            • 1.5.5 Función
            • 1.5.6 Las Costuras Internas
            • 1.5.7 Deriva
            • 1.5.8 Subprocesos
      • FR | Ici, c'est Comment Construire
        • FR | Conception
          • FR | 1.1 Principes
            • 1.1.1 Le saviez-vous ?
            • 1.1.2 Voir
            • 1.1.3 Concevoir
            • 1.1.4 Signer
            • 1.1.5 Préparer
            • 1.1.6 Exécuter
            • 1.1.7 Soutenir
          • FR | 1.2 Règles
            • 1.2.1 Une Règle
            • 1.2.2 Quoi
            • 1.2.3 Comment
            • 1.2.4 Quand
            • 1.2.5 Pourquoi
            • 1.2.6 Qui
            • 1.2.7 Une Règle Solide
            • 1.2.8 Le Tout
          • FR | 1.3 Exceptions
            • 1.3.1.Une Exception
            • 1.3.2 Le Et Si
            • 1.3.3 Intégrer ou Mettre de Côté
            • 1.3.4 Le Chemin à Suivre
            • 1.3.5 Préapprouvé
            • 1.3.6 Escalader
            • 1.3.7 Replier
            • 1.3.8 Aussi Peu Que Possible
          • FR | 1.4 Noyau
            • 1.4.1 Un Processus Central
            • 1.4.2 Le Cadre
            • 1.4.3 La Direction (L1)
            • 1.4.4 La Colonne Vertébrale (L1→L3)
            • 1.4.5 Les Passations
            • 1.4.6 La Validation
            • 1.4.7 Hérité
            • 1.4.8 Le Central
          • FR | 1.5 Sous
            • 1.5.1 Un Sous-Processus
            • 1.5.2 Sous ou Étape
            • 1.5.3 Découper Proprement
            • 1.5.4 Situer
            • 1.5.5 Fonction
            • 1.5.6 Les Coutures Internes
            • 1.5.7 Dérive
      • PT | Aqui é Como Construir
        • PT | Design
          • PT | 1.1 Princípios
            • 1.1.1 Sabias?
            • 1.1.2 Ver (PT)
            • 1.1.3 Design (PT)
            • 1.1.4 Assinar
            • 1.1.5 Preparar (PT)
            • 1.1.6 Executar
            • 1.1.7 Apoiar
          • PT | 1.2 Regras
            • 1.2.1 Uma Regra
            • 1.2.2 O quê
            • 1.2.3 Como
            • 1.2.4 Quando
            • 1.2.5 Por Que
            • 1.2.6 Quem
            • 1.2.7 Uma Regra Sólida
            • 1.2.8 O Todo
          • PT | 1.3 Exceções
            • 1.3.1.Uma Exceção
            • 1.3.2 O E Se
            • 1.3.3 Incorporar ou Pôr de Lado
            • 1.3.4 O Caminho a Seguir
            • 1.3.5 Pré-Aprovado
            • 1.3.6 Escalonar
            • 1.3.7 Dobrar de Volta
            • 1.3.8 Tão Poucas Quanto Possível
          • PT | 1.4 Núcleo
            • 1.4.1 Um Processo Central
            • 1.4.2 O Enquadramento
            • 1.4.3 A Direção (L1)
            • 1.4.4 A Coluna Vertebral (L1→L3)
            • 1.4.5 Transferências
            • 1.4.6 A Aprovação
            • 1.4.7 Herdado
            • 1.4.8 O Central
          • PT | 1.5 Sub
            • 1.5.1 Um Subprocesso
            • 1.5.2 Sub ou Passo
            • 1.5.3 Cortar Limpo
            • 1.5.4 Situar PT
            • 1.5.5 Função
            • 1.5.6 As Costuras Internas
            • 1.5.7 Deriva PT
      • RU | Вот Как Строить
        • RU | Проектирование
          • RU | 1.1 Принципы
            • 1.1.1 А вы знали?
            • 1.1.2 Видеть
            • 1.1.3 Проектировать
            • 1.1.4 Подписывать
            • 1.1.5 Подготавливать
            • 1.1.6 Запускать
            • 1.1.7 Поддерживать
          • RU | 1.2 Правила
            • 1.2.1 Правило
            • 1.2.2 Что
            • 1.2.3 Как
            • 1.2.4 Когда
            • 1.2.5 Почему
            • 1.2.6 Кто
            • 1.2.7 Прочное Правило
            • 1.2.8 Целое
          • RU | 1.3 Исключения
            • 1.3.1.Исключение
            • 1.3.2 Что Если
            • 1.3.3 Включить или Отложить
            • 1.3.4 Путь Вперёд
            • 1.3.5 Предварительно Одобренное
            • 1.3.6 Эскалировать
            • 1.3.7 Свернуть Обратно
            • 1.3.8 Так Мало, Как Возможно
          • RU | 1.4 Ядро
            • 1.4.1 Основной Процесс
            • 1.4.2 Рамка
            • 1.4.3 Направление (L1)
            • 1.4.4 Хребет (L1→L3)
            • 1.4.5 Передачи
            • 1.4.6 Утверждение
            • 1.4.7 Унаследованное
            • 1.4.8 Основной
          • RU | 1.5 Суб
            • 1.5.1 Подпроцесс
            • 1.5.2 Суб или Шаг
            • 1.5.3 Резать Чисто
            • 1.5.4 Разместить
            • 1.5.5 Функция
            • 1.5.6 Внутренние Швы
            • 1.5.7 Дрейф
      • EN | Migration
        • CHAPTER 1. Why Processes Drive Transformation
        • CHAPTER 2. From Steps to System by MarvinPro
        • CHAPTER 3. Phases by MarvinPro
        • CHAPTER 4. Case Studies & Lessons Learned by MarvinPro
        • CHAPTER 5. Conclusion / Final Reflections by MarvinPro
        • CHAPTER 6. What Makes Migration Successful by MarvinPro
      • EN | Migration S/4HANA Edition
        • 1. Why Processes Drive Transformation by MarvinPro
        • 2. Design Phase — Building for Scale by MarvinPro
        • 3. Core Functional Domains
        • 4. Transition Phase — Migration Strategy and Exec by MarvinPro
        • 5. Operate Phase — Stabilisation and Continuous Improvement by MarvinPro
        • 6. What Makes Migration Successful by MarvinPro
      • EN | Exceptions
        • 1. Why Exceptions Define by MarvinPro
        • 2. What Is an Exception
        • 3. Designing for Exceptions
        • 4. Operating Under Pressure
        • 5. Recovery and Stabilisation
        • 6. Learning from Exceptions
        • 7. The Exception-Ready Organisation
        • 8. The Future of Exception Handling by MarvinPro
      • PROCESSES COLLECTION
        • PROCESS Catalog
    • STORIES
      • EN | The CEO
        • CHAPTER 0. Prologue
        • CHAPTER 1. Day One
        • CHAPTER 2. The Room
        • CHAPTER 3. The Pressure
        • CHAPTER 4. The Presentation
        • CHAPTER 5. The Contract
        • CHAPTER 6. The Transfer
        • CHAPTER 7. The Script
        • CHAPTER 8. The Distance
        • CHAPTER 9. The Customer Who Knows More
        • CHAPTER 10. The Knowledge That Left
        • CHAPTER 11. The Culture Nobody Transferred
        • CHAPTER 12. The Friend
        • CHAPTER 13. The Invisible Wall
        • CHAPTER 14. The Manager Who Performs Upward
        • Coming Soon
      • ES | El CEO
        • CAPÍTULO 0. Prólogo
        • CAPÍTULO 1. El Primer Día
        • CAPÍTULO 2. La Sala
        • CAPÍTULO 3. La Presión
        • CAPÍTULO 4. La Presentación
        • CAPÍTULO 5. El Contrato
        • CAPÍTULO 6. La Transferencia
        • CAPÍTULO 7. El Guión
        • CAPÍTULO 8. La Distancia
        • CAPÍTULO 9. La Clienta Que Sabe Más
        • CAPÍTULO 10. El Conocimiento Que Se Fue
        • es CAPÍTULO 11. La Cultura Que Nadie Transfirió
        • Próximamente
      • FR | Le CEO
        • CHAPITRE 0. Prologue
        • CHAPITRE 1. Jour Un
        • CHAPITRE 2. La Salle
        • CHAPITRE 3. La Pression
        • CHAPITRE 4. La Présentation
        • CHAPITRE 5. Le Contrat
        • CHAPITRE 6. Le Transfert
        • CHAPITRE 7. Le Script
        • CHAPITRE 8. La Distance
        • CHAPITRE 9. La Cliente Qui En Sait Plus
        • CHAPITRE 10. Le Savoir Qui Est Parti
        • CHAPITRE 11. La Culture Que Personne N'a Transférée
        • Bientôt Disponible
      • PT | O CEO
        • CAPÍTULO 0. Prólogo
        • CAPÍTULO 1. Dia Um
        • CAPÍTULO 2. A Sala
        • CAPÍTULO 3. A Pressão
        • CAPÍTULO 4. A Apresentação
        • CAPÍTULO 5. O Contrato
        • CAPÍTULO 6. A Transferência
        • CAPÍTULO 7. O Guião
        • CAPÍTULO 8. A Distância
        • CAPÍTULO 9. A Cliente Que Sabe Mais
        • CAPÍTULO 10. O Conhecimento Que Partiu
        • CAPÍTULO 11. A Cultura Que Ninguém Transferiu
        • Em Breve
      • RU | ГД
        • ГЛАВА 0. ПРОЛОГ
        • ГЛАВА 1. День первый
        • ГЛАВА 2. Комната
        • ГЛАВА 3. Давление
        • ГЛАВА 4. Презентация
        • ГЛАВА 5. Контракт
        • ГЛАВА 6. Перевод
        • ГЛАВА 7. Сценарий
        • ГЛАВА 8. Дистанция
        • ГЛАВА 9. Клиент, который знает больше
        • ГЛАВА 10. Знание, которое ушло
        • ГЛАВА 11. Культура, которую никто не передал
        • Скоро будет доступно

PROCESS

Here is How to Build

Design

Sub

A process is not one unbroken flow. Where it is large enough, it is made of parts, coherent chunks of work, each doing a piece of what the process delivers, joined into the whole. Those parts are its sub-processes, and this volume is about them: what a sub-process is, when a process needs them, where each sits in the whole, and what each does for it. A core deepened to its backbone shows these parts; here we treat them in their own right, the pieces a process is built from.

A sub-process is a part, not a separate process the core reaches out to. It is a chunk of the process's own flow, large enough to be worth naming and treating as a unit, small enough to be one coherent piece. A simple process needs none; its flow is made directly of steps. A larger one is made of sub-processes, each itself made of steps, or of smaller sub-processes again, down to the step. So this volume teaches the parts: when to break a process into sub-processes and when to leave it as steps, how to divide it so each part is coherent, where each part sits, and how the parts combine back into the whole they serve.

Think Simple.

A Sub-Process

READ

Sub or Step

READ

Cutting Clean

READ

Place

READ

Function

READ

The Seams Within

READ

Drift

READ

Sub-Processes

READ

Roles

Owner
Owns the end to end of their area. The decision rights and the full responsibility are theirs, at any level, in any place.

Leader
Leads, and can design a part, but does not own the end to end. (If they did, we would call them the Owner.)

Designer
Designs the part in focus, an Owner across their area, or a Leader within their part. Designing is what owning and leading ask of you.

Stakeholder
Holds a stake in the process.

Challenger
Challenges, and brings something to work with. The point may be right. Engage it.

Performer
Performs the steps. 

Refuser
Refuses, and brings nothing to work with, at any level. Look first for a root. If there is none, the way past is above them.

The Example

This volume returns to the same company you met in the Rules, and the same core you built in the Core: the software subscription, delivered by subscribe, activate, deliver, verify. The case is the same; only the lens has turned. There you shaped the core whole, down to its backbone. Here you look inside that backbone, at the parts it is made of.

For the core is not one undivided flow. When it was deepened, in the Core, each of its four beats opened into its own main parts: activate became settle the payment, open the account, record the entitlement; deliver became make the software available, and see it downloaded, installed, and logged into; verify became check the subscription's standing, and hold the software back where it has lapsed. Those main parts are the core's sub-processes, the chunks the backbone is built from. Each is a coherent piece of the core's work, large enough to be named and handled as a unit, and each is, in its own small way, a process: it has a beginning and an end, a flow of its own, and a job it does for the whole.

Take activation. It is not a single step but a sub-process: a payment must be settled, and only if it settles does an account open, and only once the account is open is the entitlement recorded that lets the software run. Three pieces, in order, each depending on the one before, together doing one coherent thing, bringing a subscription to life. That is what makes activation a sub-process and not a step: it is a small flow in its own right, a part of the core large enough to be worth treating as a whole. The same is true of delivery, and of verification. The core is built of these parts.

Not every part is a sub-process. Some pieces of the core are small enough to be single steps, done and passed on, with no inner flow to speak of. Recording the entitlement, inside activation, may be one such step. So the core is a nest of the two: sub-processes where a piece is large enough to be its own flow, steps where a piece is small enough to stand alone. Knowing which is which, where to draw a sub-process and where a step suffices, is part of what this volume teaches, because a core cut into the wrong parts is as hard to build and run as one never divided at all.

This is also where a part can become a core of its own. Activation, seen from inside the subscription core, is a sub-process, a part of a larger flow. But seen on its own, by whoever owns and designs it, it is a small core in its own right, with its own direction, its own backbone, its own edges. A sub-process at one frame is a core at another, the same relativity you met when a department's core turned out to be, from the company's frame, a sub of the company's core. So the parts the core is made of are not lesser things; they are processes, nested, each a whole at its own frame and a part at the frame above.

That is the case, seen through the sub lens. One core, the software subscription, taken apart into the pieces it is made of: the sub-processes that are small flows in their own right, the steps that are single acts, and the judgment of which a piece should be. Read it, as before, as a story first. The chapters that follow take this one core and look inside it, so that what a sub-process is, when a core needs one, where each part sits, and what each does for the whole, can be seen at work in something real.

Sub is built on the Core. Where that volume shaped the whole core process down to its backbone, this one looks inside that backbone, at the parts the core is made of. It shows what a sub-process is, a coherent chunk of a process's own flow, large enough to be worth naming and treating as a unit; when a core needs them and when its pieces are better left as steps; how to divide a process so each part is whole; where each part sits; and how the parts combine back into the core they serve. Each discipline builds on the one before, from the first cut of a process into its parts to the sound set of sub-processes that make a core whole.

IMPORTANT NOTE

Readers are strongly encouraged to access and share the original content through marvinpro.com. MarvinPro is a continuously evolving body of work, with content regularly updated to reflect new insights, improved frameworks and enhanced learning materials. Material copied or reproduced elsewhere may no longer represent the latest version, whereas the live site will always provide the most current and complete learning experience.

© COPYRIGHT 1990-2026 MarvinPro

All rights reserved. Content is free to read and share via link. You are welcome to share quotes from this work provided the complete attribution is reproduced exactly as it appears in the text, including the quote, author name, year and marvinpro.com. Copying or reproducing other parts, complete sections or chapters without prior permission is not permitted.

Think Simple.

info@marvinpro.com | feedback@marvinpro.com | support@marvinpro.com | mpac@marvinpro.com | collab@marvinpro.com | artwork@marvinpro.com 

© COPYRIGHT 1990-2026 MarvinPro  All rights reserved. Content is free to read. You are welcome to share quotes or the writer's thoughts from MarvinPro, as long as you post the complete attribution exactly as it appears in the text, including the quote, author name, year and marvinpro.com. Copying or reproducing other parts, full sections or chapters without permission is not permitted.

© COPYRIGHT 1990-2026 MarvinPro  Todos los derechos reservados. El contenido es libre de leer. Eres bienvenido a compartir citas o las reflexiones del autor de MarvinPro, siempre que publiques la atribución completa exactamente como aparece en el texto, incluyendo la cita, el nombre del autor, el año y marvinpro.com. No está permitido copiar ni reproducir otras partes, secciones completas o capítulos sin permiso.

© COPYRIGHT 1990-2026 MarvinPro  Tous droits réservés. Le contenu est libre de lecture. Vous êtes invité à partager des citations ou les réflexions de l'auteur de MarvinPro, à condition de publier l'attribution complète exactement telle qu'elle apparaît dans le texte, y compris la citation, le nom de l'auteur, l'année et marvinpro.com. Copier ou reproduire d'autres parties, des sections entières ou des chapitres sans autorisation n'est pas permis.

© COPYRIGHT 1990-2026 MarvinPro  Todos os direitos reservados. O conteúdo é livre de ler. És bem-vindo a partilhar citações ou as reflexões do autor de MarvinPro, desde que publiques a atribuição completa exatamente como aparece no texto, incluindo a citação, o nome do autor, o ano e marvinpro.com. Copiar ou reproduzir outras partes, secções completas ou capítulos sem permissão não é permitido.

© COPYRIGHT 1990-2026 MarvinPro  Все права защищены. Содержание можно свободно читать. Вы можете делиться цитатами или размышлениями автора из MarvinPro при условии, что вы публикуете полную атрибуцию точно так, как она появляется в тексте, включая цитату, имя автора, год и marvinpro.com. Копирование или воспроизведение других частей, целых разделов или глав без разрешения не допускается.

Report abuse
Page details
Page updated
Report abuse